X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626060402000

Well Details

Well ID: 0626060402000
Loading map...
Location: 00/02-04-062-06W6/0
Location Alias: 00/02-04-62-06 W6M
Location Alias 2: 00/02-04-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 2-4-62-6
Operator Name: Jupiter Resources Inc.
License Number: 0426285
License Date: 2010-11-24
License Status: Amended
Spud Date: 2011-05-20
Final Drill Date: 2011-07-14
Well Total Depth: 5438.00 m
Surface Hole Latitude: 54.343495
Surface Hole Longitude: -118.859764

For data sources see[1][2]

Well History

Date Event
2010-11-24 Obtained License
2011-05-23 Surface Casing Operation Performed
2011-06-21 Intermediate Casing Operation Performed
2011-06-22 Well Log Performed
2011-06-24 Direction Drilling Operation Performed - Horizontal
2011-07-14 Finished Drilling
2011-07-14 Perforation Treatment Performed - Open-Hole Completion
2011-07-14 Well Mode changed to Drilled and Cased
2011-07-17 Production Casing Operation Performed
2011-07-19 Rig Released
2011-10-03 Well Log Performed
2011-11-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-13 Perforation Treatment Performed - Fractured
2011-11-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-14 Perforation Treatment Performed - Fractured
2011-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-15 Perforation Treatment Performed - Fractured
2011-11-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-16 Perforation Treatment Performed - Fractured
2011-11-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-17 Perforation Treatment Performed - Fractured
2011-11-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-11-18 Perforation Treatment Performed - Fractured
2011-11-21 Well Fluid changed to Gas
2011-11-21 Well Mode changed to Testing
2011-11-27 Well Began Production
2011-11-27 Well Fluid changed to Gas
2011-11-27 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-24 2979.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-14 Open Hole/Barefoot Completion 5315.00 5438.00 0
2011-11-14 Hydra Jet Perforation 4865.00 4865.10 0
2011-11-14 Fracture 4865.00 4865.10 0
2011-11-15 Hydra Jet Perforation 4769.00 4769.10 0
2011-11-15 Fracture 4769.00 4769.10 0
2011-11-15 Hydra Jet Perforation 4668.00 4668.10 0
2011-11-15 Fracture 4668.00 4668.10 0
2011-11-15 Hydra Jet Perforation 4567.00 4567.10 0
2011-11-15 Fracture 4567.00 4567.10 0
2011-11-15 Hydra Jet Perforation 4465.00 4465.10 0
2011-11-15 Fracture 4465.00 4465.10 0
2011-11-13 Hydra Jet Perforation 5275.00 5275.10 0
2011-11-15 Hydra Jet Perforation 4364.00 4364.10 0
2011-11-15 Fracture 4364.00 4364.10 0
2011-11-16 Hydra Jet Perforation 4263.00 4263.10 0
2011-11-16 Fracture 4263.00 4263.10 0
2011-11-16 Hydra Jet Perforation 4162.00 4162.10 0
2011-11-16 Fracture 4162.00 4162.10 0
2011-11-16 Hydra Jet Perforation 4061.00 4061.10 0
2011-11-16 Fracture 4061.00 4061.10 0
2011-11-16 Hydra Jet Perforation 3959.00 3959.10 0
2011-11-16 Fracture 3959.00 3959.10 0
2011-11-13 Fracture 5275.00 5275.10 0
2011-11-16 Hydra Jet Perforation 3858.00 3858.10 0
2011-11-16 Fracture 3858.00 3858.10 0
2011-11-16 Hydra Jet Perforation 3757.00 3757.10 0
2011-11-17 Fracture 3757.00 3757.10 0
2011-11-17 Hydra Jet Perforation 3656.00 3656.10 0
2011-11-17 Fracture 3656.00 3656.10 0
2011-11-17 Hydra Jet Perforation 3555.00 3555.10 0
2011-11-17 Fracture 3555.00 3555.10 0
2011-11-17 Hydra Jet Perforation 3467.00 3467.10 0
2011-11-17 Fracture 3467.00 3467.10 0
2011-11-14 Hydra Jet Perforation 5165.00 5165.10 0
2011-11-17 Hydra Jet Perforation 3462.00 3462.10 0
2011-11-17 Fracture 3462.00 3462.10 0
2011-11-17 Hydra Jet Perforation 3365.00 3365.10 0
2011-11-18 Fracture 3365.00 3365.10 0
2011-11-18 Hydra Jet Perforation 3275.00 3275.10 0
2011-11-18 Fracture 3275.00 3275.10 0
2011-11-14 Hydra Jet Perforation 5155.00 5155.10 0
2011-11-14 Hydra Jet Perforation 5073.00 5073.10 0
2011-11-14 Fracture 5073.00 5073.10 0
2011-11-14 Hydra Jet Perforation 4971.00 4971.10 0
2011-11-14 Fracture 4971.00 4971.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 458 0.0 0.0 0.0
2012 6254 0.0 0.0 0.0
2013 6883 0.0 0.0 0.0
2014 8303 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8495 0.0 0.0 0.0
2017 6887 0.0 0.0 0.0
2018 7696 0.0 0.0 0.0
2019 8489 0.0 0.0 0.0
2020 1929 0.0 0.0 0.0

For data sources see[6]

References