X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626060208020

Well Details

Well ID: 0626060208020
Loading map...
Location: 02/08-02-062-06W6/0
Location Alias: 02/08-02-62-06 W6M
Location Alias 2: 02/08-02-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ 102 KAKWA 8-2-62-6
Operator Name: Tourmaline Oil Corp.
License Number: 0477109
License Date: 2015-10-08
License Status: Issued
Spud Date: 2015-11-18
Final Drill Date: 2015-12-08
Well Total Depth: 4425.00 m
Surface Hole Latitude: 54.327903
Surface Hole Longitude: -118.795224

For data sources see[1][2]

Well History

Date Event
2015-01-07 Well Log Performed
2015-10-08 Obtained License
2015-11-20 Surface Casing Operation Performed
2015-11-24 Intermediate Casing Operation Performed
2015-11-29 Direction Drilling Operation Performed - Deviate
2015-12-02 Direction Drilling Operation Performed - Horizontal
2015-12-02 Well Log Performed
2015-12-06 Well Log Performed
2015-12-08 Finished Drilling
2015-12-08 Well Log Performed
2015-12-08 Well Mode changed to Drilled and Cased
2015-12-11 Production Casing Operation Performed
2015-12-11 Rig Released
2016-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-21 Well Began Production
2016-01-21 Well Fluid changed to Gas
2016-01-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-18 Jomax Drilling (1988) Limited 12E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-29 2903.50 Deviate (5 - 79 degrees)
2015-12-02 3195.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-12 Multi-Stage Fracture 4371.20 4371.30 0
2016-01-12 Multi-Stage Fracture 3838.70 3838.80 0
2016-01-12 Multi-Stage Fracture 3780.00 3780.10 0
2016-01-12 Multi-Stage Fracture 3721.50 3721.60 0
2016-01-13 Multi-Stage Fracture 3662.50 3662.60 0
2016-01-13 Multi-Stage Fracture 3603.70 3603.80 0
2016-01-13 Multi-Stage Fracture 3544.40 3544.50 0
2016-01-13 Multi-Stage Fracture 3485.50 3485.60 0
2016-01-13 Multi-Stage Fracture 3427.00 3427.10 0
2016-01-13 Multi-Stage Fracture 3367.90 3368.00 0
2016-01-13 Multi-Stage Fracture 3308.80 3308.90 0
2016-01-12 Multi-Stage Fracture 4307.90 4308.00 0
2016-01-12 Multi-Stage Fracture 4248.60 4248.70 0
2016-01-12 Multi-Stage Fracture 4189.50 4189.60 0
2016-01-12 Multi-Stage Fracture 4131.30 4131.40 0
2016-01-12 Multi-Stage Fracture 4072.80 4072.90 0
2016-01-12 Multi-Stage Fracture 4013.60 4013.70 0
2016-01-12 Multi-Stage Fracture 3954.70 3954.80 0
2016-01-12 Multi-Stage Fracture 3896.10 3896.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-12 2016-01-13 3,107 5,281 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.3265 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.9321 N/A
silica crystalline 14808-60-7 100 4.9321 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.0343 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.4041 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0121 N/A
dibromoacetonitrile 3252-43-5 100 0.0121 N/A
non-hazardous ingredients Not Available 100 0.0121 N/A
polyethylene glycol 25322-68-3 100 0.0121 N/A
sodium bromide 7647-15-6 100 0.0121 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1549 N/A
water Not Available 100 0.1549 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0652 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0652 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0652 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0652 N/A
non-hazardous ingredients Not Available 100 0.0652 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0704 N/A
isopropanol 67-63-0 100 0.0704 N/A
methanol 67-56-1 100 0.0704 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0704 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0704 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-11 2015-11-15 Recycled Fracturing Water (treated at well site) 2185
2016-01-19 2016-02-01 Surface Water - Runoff 3138

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7938 0.0 0.0 0.0
2017 7669 0.0 0.0 0.0
2018 5306 0.0 0.0 0.0
2019 4333 0.0 0.0 0.0
2020 1595 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-13 No Incident Encountered 0.00 0.00
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References