X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626060201000

Well Details

Well ID: 0626060201000
Loading map...
Location: 00/01-02-062-06W6/0
Location Alias: 00/01-02-62-06 W6M
Location Alias 2: 00/01-02-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 1-2-62-6
Operator Name: Tourmaline Oil Corp.
License Number: 0438749
License Date: 2011-11-14
License Status: Issued
Spud Date: 2011-11-28
Final Drill Date: 2012-01-23
Well Total Depth: 4283.00 m
Surface Hole Latitude: 54.332799
Surface Hole Longitude: -118.794622

For data sources see[1][2]

Well History

Date Event
2011-11-14 Obtained License
2011-12-05 Surface Casing Operation Performed
2011-12-05 Well Log Performed
2011-12-11 Direction Drilling Operation Performed - Horizontal
2011-12-15 Intermediate Casing Operation Performed
2012-01-10 Well Log Performed
2012-01-23 Finished Drilling
2012-01-23 Well Mode changed to Drilled and Cased
2012-01-26 Production Casing Operation Performed
2012-01-27 Rig Released
2012-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-09 Well Began Production
2012-04-09 Well Fluid changed to Gas
2012-04-09 Well Mode changed to Flowing
2016-05-01 Well Fluid changed to Gas
2016-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-11 1453.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-10 Multi-Stage Fracture 4242.80 4243.80 0
2012-02-11 Multi-Stage Fracture 3638.90 3639.90 0
2012-02-11 Multi-Stage Fracture 3570.80 3571.80 0
2012-02-11 Multi-Stage Fracture 3502.60 3503.60 0
2012-02-11 Multi-Stage Fracture 3447.00 3448.00 0
2012-02-12 Multi-Stage Fracture 3378.90 3379.90 0
2012-02-10 Multi-Stage Fracture 4172.00 4173.00 0
2012-02-10 Multi-Stage Fracture 4104.10 4105.10 0
2012-02-10 Multi-Stage Fracture 4048.70 4049.70 0
2012-02-11 Multi-Stage Fracture 3967.70 3968.70 0
2012-02-11 Multi-Stage Fracture 3912.20 3913.20 0
2012-02-11 Multi-Stage Fracture 3843.90 3844.90 0
2012-02-11 Multi-Stage Fracture 3775.60 3776.60 0
2012-02-11 Multi-Stage Fracture 3707.30 3708.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6192 0.0 0.0 0.0
2013 7751 0.0 0.0 0.0
2014 7361 0.0 0.0 0.0
2015 8236 0.0 0.0 0.0
2016 7478 0.0 0.0 0.0
2017 7560 0.0 0.0 0.0
2018 6860 0.0 0.0 0.0
2019 6497 0.0 0.0 0.0
2020 2076 0.0 0.0 0.0

For data sources see[6]

References