If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626060114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.3385,"lon":-118.79608,"icon":""}]} |
Location: 00/14-01-062-06W6/0 | |
Location Alias: 00/14-01-62-06 W6M | |
Location Alias 2: 00/14-01-062-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 06 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ KAKWA 14-1-62-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0461292 | |
License Date: 2013-11-21 | |
License Status: Amended | |
Spud Date: 2014-07-15 | |
Final Drill Date: 2014-08-12 | |
Well Total Depth: 4873.00 m | |
Surface Hole Latitude: 54.338500 | |
Surface Hole Longitude: -118.796080 |
Date | Event |
---|---|
2013-11-21 | Obtained License |
2014-07-08 | Well Log Performed |
2014-07-17 | Surface Casing Operation Performed |
2014-07-19 | Lost Circulation Occurred |
2014-07-24 | Intermediate Casing Operation Performed |
2014-07-30 | Direction Drilling Operation Performed - Deviate |
2014-08-04 | Direction Drilling Operation Performed - Horizontal |
2014-08-07 | Well Log Performed |
2014-08-08 | Lost Circulation Occurred |
2014-08-12 | Finished Drilling |
2014-08-12 | Well Log Performed |
2014-08-12 | Well Mode changed to Drilled and Cased |
2014-08-13 | Well Log Performed |
2014-08-17 | Production Casing Operation Performed |
2014-08-17 | Rig Released |
2014-08-27 | Well Log Performed |
2014-09-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-13 | Well Fluid changed to Gas |
2014-09-13 | Well Mode changed to Testing |
2014-10-16 | Well Began Production |
2014-10-16 | Well Fluid changed to Gas |
2014-10-16 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-15 | Jomax Drilling (1988) Limited | 12E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-30 | 2822.80 | Deviate (5 - 79 degrees) |
2014-08-04 | 3228.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-09-08 | Multi-Stage Fracture | 4830.70 | 4830.80 | 0 |
2014-09-09 | Multi-Stage Fracture | 4292.40 | 4292.50 | 0 |
2014-09-09 | Multi-Stage Fracture | 4226.90 | 4227.00 | 0 |
2014-09-09 | Multi-Stage Fracture | 4173.70 | 4173.80 | 0 |
2014-09-09 | Multi-Stage Fracture | 4108.50 | 4108.60 | 0 |
2014-09-10 | Multi-Stage Fracture | 4043.10 | 4043.20 | 0 |
2014-09-10 | Multi-Stage Fracture | 3990.30 | 3990.40 | 0 |
2014-09-10 | Multi-Stage Fracture | 3924.50 | 3924.60 | 0 |
2014-09-10 | Multi-Stage Fracture | 3858.60 | 3858.70 | 0 |
2014-09-10 | Multi-Stage Fracture | 3805.50 | 3805.60 | 0 |
2014-09-10 | Multi-Stage Fracture | 3739.70 | 3739.80 | 0 |
2014-09-08 | Multi-Stage Fracture | 4790.50 | 4790.60 | 0 |
2014-09-10 | Multi-Stage Fracture | 3686.50 | 3686.60 | 0 |
2014-09-10 | Multi-Stage Fracture | 3621.00 | 3621.10 | 0 |
2014-09-10 | Multi-Stage Fracture | 3555.20 | 3555.30 | 0 |
2014-09-11 | Multi-Stage Fracture | 3502.00 | 3502.10 | 0 |
2014-09-11 | Multi-Stage Fracture | 3436.20 | 3436.30 | 0 |
2014-09-11 | Multi-Stage Fracture | 3383.10 | 3383.20 | 0 |
2014-09-11 | Multi-Stage Fracture | 3318.10 | 3318.20 | 0 |
2014-09-11 | Multi-Stage Fracture | 3252.80 | 3252.90 | 0 |
2014-09-08 | Multi-Stage Fracture | 4725.50 | 4725.60 | 0 |
2014-09-08 | Multi-Stage Fracture | 4659.70 | 4659.80 | 0 |
2014-09-08 | Multi-Stage Fracture | 4594.60 | 4594.70 | 0 |
2014-09-09 | Multi-Stage Fracture | 4541.40 | 4541.50 | 0 |
2014-09-09 | Multi-Stage Fracture | 4475.90 | 4476.00 | 0 |
2014-09-09 | Multi-Stage Fracture | 4410.10 | 4410.20 | 0 |
2014-09-09 | Multi-Stage Fracture | 4357.50 | 4357.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-08 | 2014-09-11 | 3,121 | 7,929 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.5998 | N/A | |||
CRC-C 30/50 | Trican | phenolic resin | 9003-35-4 | 100 | 4.0109 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 4.0109 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 10.3288 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.2591 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0107 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0107 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1881 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1881 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0915 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0915 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0915 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0706 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0706 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0706 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0706 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0706 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-09-09 | 2014-09-11 | Surface Water - River | 1535 |
2014-09-09 | 2014-09-11 | Surface Water - Runoff | 179 |
2014-08-30 | 2014-08-30 | Recycled Fracturing Water (treated at well site) | 656 |
2014-09-08 | 2014-09-10 | Recycled Fracturing Water (treated at well site) | 1702 |
2014-08-30 | 2014-08-31 | Recycled Fracturing Water (treated at well site) | 2271 |
2014-09-01 | 2014-09-02 | Recycled Fracturing Water (treated at well site) | 1586 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2098 | 0.0 | 0.0 | 0.0 |
2015 | 8371 | 0.0 | 0.0 | 0.0 |
2016 | 8624 | 0.0 | 0.0 | 0.0 |
2017 | 8372 | 0.0 | 0.0 | 0.0 |
2018 | 7995 | 0.0 | 0.0 | 0.0 |
2019 | 8345 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-19 | Lost Circulation | 630.00 | 800.00 |
2014-08-08 | Lost Circulation | 4057.00 | 4083.00 |
2014-09-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]