X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626060112000

Well Details

Well ID: 0626060112000
Loading map...
Location: 00/12-01-062-06W6/0
Location Alias: 00/12-01-62-06 W6M
Location Alias 2: 00/12-01-062-06 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 06
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 12-1-62-6
Operator Name: Tourmaline Oil Corp.
License Number: 0474863
License Date: 2015-03-04
License Status: Amended
Spud Date: 2015-09-07
Final Drill Date: 2015-10-07
Well Total Depth: 4550.00 m
Surface Hole Latitude: 54.338237
Surface Hole Longitude: -118.796312

For data sources see[1][2]

Well History

Date Event
2015-03-04 Obtained License
2015-09-09 Surface Casing Operation Performed
2015-09-10 Well Log Performed
2015-09-15 Intermediate Casing Operation Performed
2015-09-21 Direction Drilling Operation Performed - Deviate
2015-09-23 Direction Drilling Operation Performed - Horizontal
2015-09-24 Well Log Performed
2015-10-07 Finished Drilling
2015-10-07 Well Log Performed
2015-10-07 Well Mode changed to Drilled and Cased
2015-10-10 Production Casing Operation Performed
2015-10-11 Rig Released
2015-10-21 Well Log Performed
2015-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-02 Well Began Production
2015-11-02 Well Fluid changed to Gas
2015-11-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-07 Jomax Drilling (1988) Limited 12E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-21 2897.10 Deviate (5 - 79 degrees)
2015-09-23 3182.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-25 Multi-Stage Fracture 4509.80 4509.90 0
2015-10-26 Multi-Stage Fracture 3989.50 3989.60 0
2015-10-26 Multi-Stage Fracture 3929.60 3929.70 0
2015-10-26 Multi-Stage Fracture 3870.30 3870.40 0
2015-10-26 Multi-Stage Fracture 3810.70 3810.80 0
2015-10-26 Multi-Stage Fracture 3750.90 3751.00 0
2015-10-26 Multi-Stage Fracture 3691.10 3691.20 0
2015-10-26 Multi-Stage Fracture 3631.90 3632.00 0
2015-10-26 Multi-Stage Fracture 3572.00 3572.10 0
2015-10-26 Multi-Stage Fracture 3512.90 3513.00 0
2015-10-27 Multi-Stage Fracture 3453.70 3453.80 0
2015-10-25 Multi-Stage Fracture 4463.30 4463.40 0
2015-10-27 Multi-Stage Fracture 3395.20 3395.30 0
2015-10-27 Multi-Stage Fracture 3336.10 3336.20 0
2015-10-27 Multi-Stage Fracture 3277.70 3277.80 0
2015-10-27 Multi-Stage Fracture 3218.90 3219.00 0
2015-10-25 Multi-Stage Fracture 4404.20 4404.30 0
2015-10-26 Multi-Stage Fracture 4344.90 4345.00 0
2015-10-26 Multi-Stage Fracture 4285.00 4285.10 0
2015-10-26 Multi-Stage Fracture 4225.80 4225.90 0
2015-10-26 Multi-Stage Fracture 4167.80 4167.90 0
2015-10-26 Multi-Stage Fracture 4108.90 4109.00 0
2015-10-26 Multi-Stage Fracture 4049.10 4049.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-25 2015-10-27 3,101 7,241 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.0807 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.0275 N/A
silica crystalline 14808-60-7 100 4.0275 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.1201 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.4303 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0123 N/A
dibromoacetonitrile 3252-43-5 100 0.0123 N/A
non-hazardous ingredients Not Available 100 0.0123 N/A
polyethylene glycol 25322-68-3 100 0.0123 N/A
sodium bromide 7647-15-6 100 0.0123 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1855 N/A
formic acid 64-18-6 100 0.1855 N/A
non-hazardous ingredients Not Available 100 0.1855 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0726 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0726 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0726 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0726 N/A
non-hazardous ingredients Not Available 100 0.0726 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0707 N/A
isopropanol 67-63-0 100 0.0707 N/A
methanol 67-56-1 100 0.0707 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0707 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0707 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-18 2015-10-24 Recycled Fracturing Water (treated at well site) 991
2015-10-18 2015-10-24 Recycled Fracturing Water (treated at well site) 1452
2015-10-18 2015-10-24 Recycled Fracturing Water (treated at well site) 957
2015-10-26 2015-10-27 Surface Water - Lake 3878

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1443 0.0 0.0 0.0
2016 8552 0.0 0.0 0.0
2017 8304 0.0 0.0 0.0
2018 8064 0.0 0.0 0.0
2019 8329 0.0 0.0 0.0
2020 2050 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-11 No Incident Encountered 0.00 0.00
2015-11-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References