X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626053008000

Well Details

Well ID: 0626053008000
Loading map...
Location: 00/08-30-062-05W6/0
Location Alias: 00/08-30-62-05 W6M
Location Alias 2: 00/08-30-062-05 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE ET AL HZ KAKWA 8-30-62-5
Operator Name: Tourmaline Oil Corp.
License Number: 0437746
License Date: 2011-10-18
License Status: Issued
Spud Date: 2012-02-02
Final Drill Date: 2012-03-08
Well Total Depth: 4185.00 m
Surface Hole Latitude: 54.397584
Surface Hole Longitude: -118.747505

For data sources see[1][2]

Well History

Date Event
2011-10-18 Obtained License
2012-02-07 Surface Casing Operation Performed
2012-02-15 Intermediate Casing Operation Performed
2012-02-19 Well Log Performed
2012-02-22 Direction Drilling Operation Performed - Deviate
2012-03-01 Direction Drilling Operation Performed - Horizontal
2012-03-02 Well Log Performed
2012-03-08 Finished Drilling
2012-03-08 Well Mode changed to Drilled and Cased
2012-03-18 Production Casing Operation Performed
2012-03-19 Rig Released
2012-07-28 Well Log Performed
2012-08-02 Well Log Performed
2012-08-13 Well Log Performed
2012-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-24 Well Began Production
2012-08-24 Well Fluid changed to Gas
2012-08-24 Well Mode changed to Flowing
2016-01-18 Well Fluid changed to Gas
2016-01-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-02 Patterson-UTI Drilling Co. Canada 15E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-22 2677.00 Deviate (5 - 79 degrees)
2012-03-01 3121.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-21 Multi-Stage Fracture 4095.00 4095.10 0
2012-08-22 Multi-Stage Fracture 3468.00 3468.10 0
2012-08-22 Multi-Stage Fracture 3400.00 3400.10 0
2012-08-23 Multi-Stage Fracture 3332.00 3332.10 0
2012-08-23 Multi-Stage Fracture 3251.00 3251.10 0
2012-08-23 Multi-Stage Fracture 3196.00 3196.10 0
2012-08-23 Multi-Stage Fracture 3114.00 3114.10 0
2012-08-21 Multi-Stage Fracture 4026.00 4026.10 0
2012-08-21 Multi-Stage Fracture 3958.00 3958.10 0
2012-08-22 Multi-Stage Fracture 3890.00 3890.10 0
2012-08-22 Multi-Stage Fracture 3821.00 3821.10 0
2012-08-22 Multi-Stage Fracture 3740.00 3740.10 0
2012-08-22 Multi-Stage Fracture 3672.00 3672.10 0
2012-08-22 Multi-Stage Fracture 3604.00 3604.10 0
2012-08-22 Multi-Stage Fracture 3536.00 3536.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2867 0.0 0.0 0.0
2013 7396 0.0 0.0 0.0
2014 6389 0.0 0.0 0.0
2015 8498 0.0 0.0 0.0
2016 8607 0.0 0.0 0.0
2017 7890 0.0 0.0 0.0
2018 8341 0.0 0.0 0.0
2019 8098 0.0 0.0 0.0
2020 2019 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-21 No Incident Encountered 0.00 0.00
2012-09-10 No Incident Encountered 0.00 0.00

For data sources see[8]

References