X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626052101000

Well Details

Well ID: 0626052101000
Loading map...
Location: 00/01-21-062-05W6/0
Location Alias: 00/01-21-62-05 W6M
Location Alias 2: 00/01-21-062-05 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 1-21-62-5
Operator Name: Tourmaline Oil Corp.
License Number: 0482611
License Date: 2017-01-30
License Status: Issued
Spud Date: 2017-02-04
Final Drill Date: 2017-03-22
Well Total Depth: 4426.00 m
Surface Hole Latitude: 54.372798
Surface Hole Longitude: -118.701409

For data sources see[1][2]

Well History

Date Event
2017-01-30 Obtained License
2017-02-04 Well Mode changed to Preset
2017-02-06 Surface Casing Operation Performed
2017-03-09 Intermediate Casing Operation Performed
2017-03-12 Direction Drilling Operation Performed - Deviate
2017-03-14 Direction Drilling Operation Performed - Horizontal
2017-03-14 Well Log Performed
2017-03-22 Finished Drilling
2017-03-22 Well Log Performed
2017-03-22 Well Mode changed to Drilled and Cased
2017-03-24 Production Casing Operation Performed
2017-03-24 Rig Released
2017-06-03 Well Log Performed
2017-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-14 Well Began Production
2017-06-14 Well Fluid changed to Gas
2017-06-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-04 Citadel Drilling Ltd. 1 N/A Set Surface
2017-03-07 Citadel Drilling Ltd. 1 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-12 2807.90 Deviate (5 - 79 degrees)
2017-03-14 3096.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-12 Multi-Stage Fracture 4398.90 4399.00 0
2017-06-12 Multi-Stage Fracture 3955.00 3955.10 0
2017-06-12 Multi-Stage Fracture 3903.20 3903.30 0
2017-06-12 Multi-Stage Fracture 3851.40 3851.50 0
2017-06-12 Multi-Stage Fracture 3799.50 3799.60 0
2017-06-12 Multi-Stage Fracture 3747.90 3748.00 0
2017-06-12 Multi-Stage Fracture 3696.50 3696.60 0
2017-06-12 Multi-Stage Fracture 3645.60 3645.70 0
2017-06-12 Multi-Stage Fracture 3593.70 3593.80 0
2017-06-12 Multi-Stage Fracture 3541.70 3541.80 0
2017-06-13 Multi-Stage Fracture 3490.30 3490.40 0
2017-06-12 Multi-Stage Fracture 4370.30 4370.40 0
2017-06-13 Multi-Stage Fracture 3438.50 3438.60 0
2017-06-13 Multi-Stage Fracture 3386.90 3387.00 0
2017-06-13 Multi-Stage Fracture 3335.00 3335.10 0
2017-06-13 Multi-Stage Fracture 3283.90 3284.00 0
2017-06-13 Multi-Stage Fracture 3232.20 3232.30 0
2017-06-13 Multi-Stage Fracture 3180.90 3181.00 0
2017-06-13 Multi-Stage Fracture 3129.20 3129.30 0
2017-06-12 Multi-Stage Fracture 4318.50 4318.60 0
2017-06-12 Multi-Stage Fracture 4266.40 4266.50 0
2017-06-12 Multi-Stage Fracture 4214.90 4215.00 0
2017-06-12 Multi-Stage Fracture 4162.90 4163.00 0
2017-06-12 Multi-Stage Fracture 4110.40 4110.50 0
2017-06-12 Multi-Stage Fracture 4058.40 4058.50 0
2017-06-12 Multi-Stage Fracture 4006.60 4006.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-12 2017-06-13 3,000 7,103 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.1815 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 2.8618 N/A
silica crystalline 14808-60-7 100 2.8618 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.8742 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8463 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0197 N/A
2-mercaptoethanol 60-24-2 100 0.0197 N/A
dibromoacetonitrile 3252-43-5 100 0.0198 N/A
non-hazardous ingredients Not Available 100 0.0197 N/A
sodium bromide 7647-15-6 100 0.0197 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0888 N/A
water Not Available 100 0.0888 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0869 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0869 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0869 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0869 N/A
non-hazardous ingredients Not Available 100 0.0869 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0405 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0405 N/A
methanol 67-56-1 100 0.0405 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0405 N/A
non-hazardous ingredients Not Available 100 0.0405 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-12 2017-06-12 Recycled Fracturing Water (treated at well site) 4817
2017-06-08 2017-06-13 Surface Water - Runoff 2286

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4712 0.0 0.0 0.0
2018 8417 0.0 0.0 0.0
2019 8605 0.0 0.0 0.0
2020 2144 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-05 No Incident Encountered 0.00 0.00
2017-03-22 No Incident Encountered 0.00 0.00
2017-06-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References