If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626051801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.353848,"lon":-118.750641,"icon":""}]} |
Location: 00/01-18-062-05W6/0 | |
Location Alias: 00/01-18-62-05 W6M | |
Location Alias 2: 00/01-18-062-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 05 | |
Section: 18 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ KAKWA 1-18-62-5 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0486114 | |
License Date: 2017-11-01 | |
License Status: Issued | |
Spud Date: 2018-01-01 | |
Final Drill Date: 2018-02-11 | |
Well Total Depth: 4485.00 m | |
Surface Hole Latitude: 54.353848 | |
Surface Hole Longitude: -118.750641 |
Date | Event |
---|---|
2017-11-01 | Obtained License |
2018-01-22 | Surface Casing Operation Performed |
2018-01-28 | Intermediate Casing Operation Performed |
2018-01-29 | Direction Drilling Operation Performed - Deviate |
2018-02-01 | Direction Drilling Operation Performed - Horizontal |
2018-02-03 | Well Log Performed |
2018-02-11 | Finished Drilling |
2018-02-11 | Well Log Performed |
2018-02-11 | Well Mode changed to Drilled and Cased |
2018-02-12 | Well Log Performed |
2018-02-13 | Production Casing Operation Performed |
2018-02-14 | Rig Released |
2018-02-22 | Well Log Performed |
2018-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-07 | Well Began Production |
2018-03-07 | Well Fluid changed to Gas |
2018-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-01 | Citadel Drilling Ltd. | 1 | N/A | Set Surface |
2018-01-28 | Citadel Drilling Ltd. | 1 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-29 | 2413.10 | Deviate (5 - 79 degrees) |
2018-02-01 | 3124.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-02 | Multi-Stage Fracture | 4430.90 | 4431.00 | 0 |
2018-03-03 | Multi-Stage Fracture | 3864.00 | 3864.10 | 0 |
2018-03-03 | Multi-Stage Fracture | 3811.10 | 3811.20 | 0 |
2018-03-03 | Multi-Stage Fracture | 3758.20 | 3758.30 | 0 |
2018-03-03 | Multi-Stage Fracture | 3705.40 | 3705.50 | 0 |
2018-03-03 | Multi-Stage Fracture | 3652.50 | 3652.60 | 0 |
2018-03-03 | Multi-Stage Fracture | 3599.60 | 3599.70 | 0 |
2018-03-03 | Multi-Stage Fracture | 3546.80 | 3546.90 | 0 |
2018-03-03 | Multi-Stage Fracture | 3493.90 | 3494.00 | 0 |
2018-03-03 | Multi-Stage Fracture | 3441.90 | 3442.00 | 0 |
2018-03-03 | Multi-Stage Fracture | 3389.00 | 3389.10 | 0 |
2018-03-02 | Multi-Stage Fracture | 4389.20 | 4389.30 | 0 |
2018-03-03 | Multi-Stage Fracture | 3336.20 | 3336.30 | 0 |
2018-03-03 | Multi-Stage Fracture | 3283.30 | 3283.40 | 0 |
2018-03-03 | Multi-Stage Fracture | 3230.50 | 3230.60 | 0 |
2018-03-03 | Multi-Stage Fracture | 3190.30 | 3190.40 | 0 |
2018-03-02 | Multi-Stage Fracture | 4336.30 | 4336.40 | 0 |
2018-03-02 | Multi-Stage Fracture | 4283.50 | 4283.60 | 0 |
2018-03-02 | Multi-Stage Fracture | 4230.60 | 4230.70 | 0 |
2018-03-02 | Multi-Stage Fracture | 4177.70 | 4177.80 | 0 |
2018-03-02 | Multi-Stage Fracture | 4124.90 | 4125.00 | 0 |
2018-03-02 | Multi-Stage Fracture | 4072.00 | 4072.10 | 0 |
2018-03-02 | Multi-Stage Fracture | 4019.20 | 4019.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-02 | 2018-03-03 | 3,042 | 6,503 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.5986 | N/A | |||
40/70 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.8842 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.7599 | N/A | ||
50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.5021 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0125 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0124 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0125 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0125 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0125 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0741 | N/A | |
DWP-959 | Calfrac | Demulsifier | Methanol | 67-56-1 | 100 | 0.0795 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0795 | N/A | ||||
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0887 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-04 | 2018-03-05 | Surface Water - Lake | 4350 |
2018-03-22 | 2018-03-22 | Surface Water - Runoff | 120 |
2018-02-23 | 2018-02-26 | Recycled Fracturing Water (treated at well site) | 2033 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6137 | 0.0 | 0.0 | 0.0 |
2019 | 8535 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-11 | No Incident Encountered | 0.00 | 0.00 |
2018-03-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]