If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626050510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.317902,"lon":-118.677682,"icon":""}]} |
| Location: 00/10-05-062-05W6/0 | |
| Location Alias: 00/10-05-62-05 W6M | |
| Location Alias 2: 00/10-05-062-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 05 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ KAKWA 10-5-62-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0443070 | |
| License Date: 2012-01-19 | |
| License Status: Amended | |
| Spud Date: 2012-02-25 | |
| Final Drill Date: 2012-04-05 | |
| Well Total Depth: 5600.00 m | |
| Surface Hole Latitude: 54.317902 | |
| Surface Hole Longitude: -118.677682 |
| Date | Event |
|---|---|
| 2012-01-19 | Obtained License |
| 2012-02-25 | Direction Drilling Operation Performed - Deviate |
| 2012-02-27 | Surface Casing Operation Performed |
| 2012-03-05 | Intermediate Casing Operation Performed |
| 2012-03-12 | Direction Drilling Operation Performed - Horizontal |
| 2012-03-12 | Well Log Performed |
| 2012-04-05 | Finished Drilling |
| 2012-04-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-04-05 | Well Log Performed |
| 2012-04-05 | Well Mode changed to Drilled and Cased |
| 2012-04-09 | Liner Casing Operation Performed |
| 2012-04-11 | Rig Released |
| 2012-06-27 | Well Log Performed |
| 2012-07-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-10 | Well Began Production |
| 2012-07-10 | Well Fluid changed to Gas |
| 2012-07-10 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-25 | 2681.00 | Deviate (5 - 79 degrees) |
| 2012-03-12 | 3106.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-04-05 | Open Hole/Barefoot Completion | 5580.00 | 5600.00 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 4359.90 | 4360.70 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 4209.70 | 4210.50 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 4059.30 | 4060.10 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 3909.20 | 3910.00 | 0 |
| 2012-07-07 | Multi-Stage Fracture | 3759.40 | 3760.20 | 0 |
| 2012-07-07 | Multi-Stage Fracture | 3609.10 | 3609.90 | 0 |
| 2012-07-07 | Multi-Stage Fracture | 3458.80 | 3459.60 | 0 |
| 2012-07-07 | Multi-Stage Fracture | 3308.60 | 3309.40 | 0 |
| 2012-07-07 | Multi-Stage Fracture | 3158.30 | 3159.10 | 0 |
| 2012-07-03 | Multi-Stage Fracture | 5568.40 | 5569.70 | 0 |
| 2012-07-03 | Multi-Stage Fracture | 5411.30 | 5412.10 | 0 |
| 2012-07-03 | Multi-Stage Fracture | 5261.00 | 5261.80 | 0 |
| 2012-07-03 | Multi-Stage Fracture | 5110.80 | 5111.60 | 0 |
| 2012-07-04 | Multi-Stage Fracture | 4960.60 | 4961.40 | 0 |
| 2012-07-04 | Multi-Stage Fracture | 4810.40 | 4811.20 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 4660.20 | 4661.00 | 0 |
| 2012-07-06 | Multi-Stage Fracture | 4510.10 | 4510.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3943 | 0.0 | 0.0 | 0.0 |
| 2013 | 8254 | 0.0 | 0.0 | 0.0 |
| 2014 | 8202 | 0.0 | 0.0 | 0.0 |
| 2015 | 8451 | 0.0 | 0.0 | 0.0 |
| 2016 | 8505 | 0.0 | 0.0 | 0.0 |
| 2017 | 8290 | 0.0 | 0.0 | 0.0 |
| 2018 | 8199 | 0.0 | 0.0 | 0.0 |
| 2019 | 8621 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-04-11 | No Incident Encountered | 0.00 | 0.00 |
| 2012-07-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]