X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626050216000

Well Details

Well ID: 0626050216000
Loading map...
Location: 00/16-02-062-05W6/0
Location Alias: 00/16-02-62-05 W6M
Location Alias 2: 00/16-02-062-05 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 16-2-62-5
Operator Name: Jupiter Resources Inc.
License Number: 0479208
License Date: 2016-03-29
License Status: Amended
Spud Date: 2016-11-16
Final Drill Date: 2016-12-15
Well Total Depth: 5627.00 m
Surface Hole Latitude: 54.313528
Surface Hole Longitude: -118.616391

For data sources see[1][2]

Well History

Date Event
2016-03-29 Obtained License
2016-11-17 Direction Drilling Operation Performed - Deviate
2016-11-18 Surface Casing Operation Performed
2016-11-28 Intermediate Casing Operation Performed
2016-12-03 Direction Drilling Operation Performed - Horizontal
2016-12-15 Finished Drilling
2016-12-15 Well Log Performed
2016-12-15 Well Mode changed to Drilled and Cased
2016-12-18 Liner Casing Operation Performed
2016-12-21 Rig Released
2017-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-27 Well Fluid changed to Gas
2017-02-27 Well Mode changed to Testing
2017-03-20 Well Began Production
2017-03-20 Well Fluid changed to Gas
2017-03-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-11-16 Horizon Drilling Inc. 40 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-17 568.60 Deviate (5 - 79 degrees)
2016-12-03 2884.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-04 Multi-Stage Fracture 5614.10 5614.20 0
2017-02-05 Multi-Stage Fracture 4800.90 4801.00 0
2017-02-05 Multi-Stage Fracture 4686.30 4686.40 0
2017-02-05 Multi-Stage Fracture 4600.30 4600.40 0
2017-02-05 Multi-Stage Fracture 4506.10 4506.20 0
2017-02-05 Multi-Stage Fracture 4405.00 4405.10 0
2017-02-05 Multi-Stage Fracture 4318.10 4318.20 0
2017-02-05 Multi-Stage Fracture 4247.40 4247.50 0
2017-02-05 Multi-Stage Fracture 4123.00 4123.10 0
2017-02-05 Multi-Stage Fracture 4038.30 4038.40 0
2017-02-06 Multi-Stage Fracture 3932.80 3932.90 0
2017-02-04 Multi-Stage Fracture 5537.00 5537.10 0
2017-02-06 Multi-Stage Fracture 3848.00 3848.10 0
2017-02-06 Multi-Stage Fracture 3746.60 3746.70 0
2017-02-06 Multi-Stage Fracture 3660.90 3661.00 0
2017-02-06 Multi-Stage Fracture 3574.10 3574.20 0
2017-02-06 Multi-Stage Fracture 3485.30 3485.40 0
2017-02-06 Multi-Stage Fracture 3397.80 3397.90 0
2017-02-06 Multi-Stage Fracture 3309.30 3309.40 0
2017-02-06 Multi-Stage Fracture 3206.20 3206.30 0
2017-02-06 Multi-Stage Fracture 3117.30 3117.40 0
2017-02-06 Multi-Stage Fracture 3057.70 3057.80 0
2017-02-04 Multi-Stage Fracture 5434.70 5434.80 0
2017-02-06 Multi-Stage Fracture 2932.60 2932.70 0
2017-02-04 Multi-Stage Fracture 5346.50 5346.60 0
2017-02-04 Multi-Stage Fracture 5257.70 5257.80 0
2017-02-05 Multi-Stage Fracture 5170.20 5170.30 0
2017-02-05 Multi-Stage Fracture 5069.40 5069.50 0
2017-02-05 Multi-Stage Fracture 4985.10 4985.20 0
2017-02-05 Multi-Stage Fracture 4902.40 4902.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-04 2017-02-06 2,788 18,153 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 87.2312 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 2.1262 N/A
silica crystalline 14808-60-7 100 2.1262 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 6.8822 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 3.5682 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
Breaker SR Trican Breaker potassium persulfate 7727-21-1 100 0 N/A
silica crystalline 14808-60-7 100 0 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1397 N/A
water Not Available 100 0.1397 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0044 N/A
propylene glycol 57-55-6 100 0.0044 N/A
TriVert 1000 Trican Diverting Agent non-hazardous ingredients Not Available 100 0.0047 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0327 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-04 2017-02-06 Surface Water - Runoff 18929

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6610 0.0 0.0 0.0
2018 8124 0.0 0.0 0.0
2019 8378 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-03 No Incident Encountered 0.00 0.00
2017-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References