X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626041211000

Well Details

Well ID: 0626041211000
Loading map...
Location: 00/11-12-062-04W6/0
Location Alias: 00/11-12-62-04 W6M
Location Alias 2: 00/11-12-062-04 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 04
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH KAKWA 11-12-62-4
Operator Name: Strath Resources Ltd.
License Number: 0424027
License Date: 2010-09-28
License Status: Issued
Spud Date: 2010-10-19
Final Drill Date: 2010-11-10
Well Total Depth: 3056.00 m
Surface Hole Latitude: 54.352328
Surface Hole Longitude: -118.456256

For data sources see[1][2]

Well History

Date Event
2010-09-28 Obtained License
2010-10-22 Surface Casing Operation Performed
2010-11-02 Well Log Performed
2010-11-03 Intermediate Casing Operation Performed
2010-11-04 Direction Drilling Operation Performed - Deviate
2010-11-10 Finished Drilling
2010-11-10 Well Mode changed to Drilled and Cased
2010-11-12 Well Log Performed
2010-11-14 Production Casing Operation Performed
2010-11-15 Rig Released
2010-11-28 Well Log Performed
2010-11-29 Perforation Treatment Performed - Jet Perforation
2010-11-29 Well Log Performed
2010-11-30 Perforation Treatment Performed - Fractured
2010-11-30 Perforation Treatment Performed - Jet Perforation
2010-11-30 Well Log Performed
2010-12-01 Perforation Treatment Performed - Fractured
2010-12-01 Perforation Treatment Performed - Jet Perforation
2010-12-01 Well Log Performed
2011-02-01 Well Began Production
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Flowing
2012-03-16 Well Fluid changed to Gas
2012-03-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-04 633.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-29 Perforation 3035.00 3035.50 2
2010-11-29 Perforation 3034.00 3037.00 17
2010-11-30 Fracture 3034.00 3037.00 0
2010-11-30 Perforation 2677.00 2680.00 17
2010-12-01 Fracture 2677.00 2680.00 0
2010-12-01 Perforation 2605.00 2609.00 17
2010-12-01 Fracture 2605.00 2609.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3263 0.0 0.0 0.0
2012 6813 0.0 0.0 0.0
2013 7832 0.0 0.0 0.0
2014 7032 0.0 0.0 0.0
2015 1992 0.0 0.0 0.0
2016 2878 0.0 0.0 0.0
2017 6153 0.0 0.0 0.0
2018 352 0.0 0.0 0.0
2019 166 0.0 0.0 0.0

For data sources see[6]

References