If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626040611007 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.33777,"lon":-118.593055,"icon":""}]} |
Location: 00/11-06-062-04W6/7 | |
Location Alias: 00/11-06-62-04 W6M | |
Location Alias 2: 00/11-06-062-04 W6/07 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 11-6-62-4 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0407347 | |
License Date: 2009-01-06 | |
License Status: Issued | |
Spud Date: 2009-03-14 | |
Final Drill Date: 2009-03-28 | |
Well Total Depth: 3133.00 m | |
Surface Hole Latitude: 54.337770 | |
Surface Hole Longitude: -118.593055 |
Date | Event |
---|---|
2009-01-06 | Obtained License |
2009-03-15 | Direction Drilling Operation Performed - Deviate |
2009-03-17 | Surface Casing Operation Performed |
2009-03-23 | Intermediate Casing Operation Performed |
2009-03-28 | Finished Drilling |
2009-03-28 | Well Mode changed to Drilled and Cased |
2009-03-30 | Production Casing Operation Performed |
2009-03-31 | Rig Released |
2009-04-02 | Well Log Performed |
2009-08-06 | Perforation Treatment Performed - Jet Perforation |
2009-08-06 | Well Log Performed |
2009-08-08 | Perforation Treatment Performed - Fractured |
2009-08-08 | Well Log Performed |
2009-08-09 | Perforation Treatment Performed - Fractured |
2009-08-09 | Perforation Treatment Performed - Jet Perforation |
2009-08-09 | Well Log Performed |
2009-08-11 | Perforation Treatment Performed - Fractured |
2009-08-11 | Perforation Treatment Performed - Jet Perforation |
2009-08-11 | Well Log Performed |
2009-08-12 | Perforation Treatment Performed - Fractured |
2009-08-12 | Perforation Treatment Performed - Jet Perforation |
2009-08-12 | Well Log Performed |
2009-08-13 | Perforation Treatment Performed - Fractured |
2009-08-13 | Perforation Treatment Performed - Jet Perforation |
2009-08-13 | Well Log Performed |
2009-08-14 | Perforation Treatment Performed - Fractured |
2009-08-15 | Well Log Performed |
2009-08-16 | Well Log Performed |
2009-08-20 | Well Log Performed |
2009-08-26 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-03-15 | 282.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-08-06 | Perforation | 3004.00 | 3006.00 | 10 |
2009-08-09 | Perforation | 2911.00 | 2913.00 | 17 |
2009-08-11 | Perforation | 2670.50 | 2671.50 | 10 |
2009-08-11 | Perforation | 2665.00 | 2666.00 | 10 |
2009-08-11 | Fracture | 2735.50 | 2736.50 | 0 |
2009-08-11 | Perforation | 2680.00 | 2682.00 | 10 |
2009-08-12 | Perforation | 2449.50 | 2450.00 | 10 |
2009-08-12 | Perforation | 2444.50 | 2445.50 | 10 |
2009-08-12 | Perforation | 2428.00 | 2428.50 | 10 |
2009-08-12 | Fracture | 2665.00 | 2682.00 | 0 |
2009-08-12 | Perforation | 2471.50 | 2472.00 | 10 |
2009-08-06 | Perforation | 3033.00 | 3035.00 | 10 |
2009-08-12 | Perforation | 2465.00 | 2466.00 | 10 |
2009-08-13 | Perforation | 1973.00 | 1975.00 | 10 |
2009-08-13 | Perforation | 1986.00 | 1987.00 | 10 |
2009-08-13 | Fracture | 2428.00 | 2472.00 | 0 |
2009-08-14 | Fracture | 1973.00 | 1987.00 | 0 |
2009-08-08 | Fracture | 3004.00 | 3006.00 | 0 |
2009-08-08 | Fracture | 3033.00 | 3035.00 | 0 |
2009-08-09 | Perforation | 2903.50 | 2904.50 | 10 |
2009-08-09 | Fracture | 2903.50 | 2913.00 | 0 |
2009-08-09 | Perforation | 2735.50 | 2736.50 | 20 |
2009-08-09 | Perforation | 2931.00 | 2931.50 | 10 |
2009-08-09 | Fracture | 2931.00 | 2931.50 | 0 |
For data sources see[5]