If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626032203020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.340057,"lon":-118.353135,"icon":""}]} |
| Location: 02/03-22-062-03W6/0 | |
| Location Alias: 02/03-22-62-03 W6M | |
| Location Alias 2: 02/03-22-062-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 22 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: STRATH HZ 102 LATOR 3-22-62-3 | |
| Operator Name: Strath Resources Ltd. | |
| License Number: 0491356 | |
| License Date: 2018-10-09 | |
| License Status: Amended | |
| Spud Date: 2018-12-08 | |
| Final Drill Date: 2019-02-14 | |
| Well Total Depth: 6834.00 m | |
| Surface Hole Latitude: 54.340057 | |
| Surface Hole Longitude: -118.353135 |
| Date | Event |
|---|---|
| 2018-10-09 | Obtained License |
| 2018-12-10 | Surface Casing Operation Performed |
| 2018-12-12 | Direction Drilling Operation Performed - Deviate |
| 2018-12-25 | Intermediate Casing Operation Performed |
| 2019-01-30 | Direction Drilling Operation Performed - Horizontal |
| 2019-01-30 | Well Log Performed |
| 2019-02-14 | Finished Drilling |
| 2019-02-14 | Well Log Performed |
| 2019-02-14 | Well Mode changed to Drilled and Cased |
| 2019-02-15 | Well Log Performed |
| 2019-02-18 | Liner Casing Operation Performed |
| 2019-02-19 | Well Log Performed |
| 2019-02-20 | Rig Released |
| 2019-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-03-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-04-01 | Well Began Production |
| 2019-04-01 | Well Fluid changed to Gas |
| 2019-04-01 | Well Mode changed to Flowing |
| 2019-08-01 | Well Fluid changed to Gas |
| 2019-08-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-01-29 | Precision Drilling Corporation | 543 | N/A | Resumption |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-12-12 | 1139.90 | Deviate (5 - 79 degrees) |
| 2019-01-30 | 3697.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-03-14 | Multi-Stage Fracture | 6752.00 | 6777.00 | 0 |
| 2019-03-17 | Multi-Stage Fracture | 6320.00 | 6345.00 | 0 |
| 2019-03-17 | Multi-Stage Fracture | 6272.00 | 6297.00 | 0 |
| 2019-03-18 | Multi-Stage Fracture | 6224.00 | 6249.00 | 0 |
| 2019-03-18 | Multi-Stage Fracture | 6176.00 | 6201.00 | 0 |
| 2019-03-18 | Multi-Stage Fracture | 6128.00 | 6153.00 | 0 |
| 2019-03-19 | Multi-Stage Fracture | 6080.00 | 6093.00 | 0 |
| 2019-03-19 | Multi-Stage Fracture | 6032.00 | 6057.00 | 0 |
| 2019-03-19 | Multi-Stage Fracture | 5984.00 | 6009.00 | 0 |
| 2019-03-19 | Multi-Stage Fracture | 5936.00 | 5961.00 | 0 |
| 2019-03-19 | Multi-Stage Fracture | 5888.00 | 5913.00 | 0 |
| 2019-03-15 | Multi-Stage Fracture | 6704.00 | 6729.00 | 0 |
| 2019-03-20 | Multi-Stage Fracture | 5840.00 | 5865.00 | 0 |
| 2019-03-20 | Multi-Stage Fracture | 5792.00 | 5817.00 | 0 |
| 2019-03-20 | Multi-Stage Fracture | 5744.00 | 5745.00 | 0 |
| 2019-03-21 | Multi-Stage Fracture | 5696.00 | 5721.00 | 0 |
| 2019-03-21 | Multi-Stage Fracture | 5648.00 | 5672.00 | 0 |
| 2019-03-21 | Multi-Stage Fracture | 5600.00 | 5625.00 | 0 |
| 2019-03-21 | Multi-Stage Fracture | 5552.00 | 5577.00 | 0 |
| 2019-03-21 | Multi-Stage Fracture | 5504.00 | 5529.00 | 0 |
| 2019-03-22 | Multi-Stage Fracture | 5456.00 | 5481.00 | 0 |
| 2019-03-22 | Multi-Stage Fracture | 5408.00 | 5433.00 | 0 |
| 2019-03-15 | Multi-Stage Fracture | 6656.00 | 6681.00 | 0 |
| 2019-03-22 | Multi-Stage Fracture | 5360.00 | 5385.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5312.00 | 5337.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5264.00 | 5289.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5216.00 | 5241.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5168.00 | 5193.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5120.00 | 5145.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5072.00 | 5097.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 5024.00 | 5049.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 4976.00 | 5001.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 4928.00 | 4953.00 | 0 |
| 2019-03-15 | Multi-Stage Fracture | 6608.00 | 6633.00 | 0 |
| 2019-03-23 | Multi-Stage Fracture | 4880.00 | 4905.00 | 0 |
| 2019-03-25 | Multi-Stage Fracture | 4832.00 | 4857.00 | 0 |
| 2019-03-25 | Multi-Stage Fracture | 4784.00 | 4808.00 | 0 |
| 2019-03-25 | Multi-Stage Fracture | 4736.00 | 4761.00 | 0 |
| 2019-03-25 | Multi-Stage Fracture | 4688.00 | 4713.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4640.00 | 4665.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4592.00 | 4617.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4544.00 | 4569.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4496.00 | 4521.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4448.00 | 4473.00 | 0 |
| 2019-03-16 | Multi-Stage Fracture | 6560.00 | 6585.00 | 0 |
| 2019-03-26 | Multi-Stage Fracture | 4400.00 | 4425.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4352.00 | 4377.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4304.00 | 4329.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4256.00 | 4281.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4208.00 | 4233.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4160.00 | 4185.00 | 0 |
| 2019-03-27 | Multi-Stage Fracture | 4112.00 | 4137.00 | 0 |
| 2019-03-28 | Multi-Stage Fracture | 4064.00 | 4089.00 | 0 |
| 2019-03-28 | Multi-Stage Fracture | 4016.00 | 4041.00 | 0 |
| 2019-03-28 | Multi-Stage Fracture | 3968.00 | 3993.00 | 0 |
| 2019-03-16 | Multi-Stage Fracture | 6512.00 | 6537.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3920.00 | 3945.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3872.00 | 3897.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3824.00 | 3849.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3776.00 | 3801.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3728.00 | 3753.00 | 0 |
| 2019-03-29 | Multi-Stage Fracture | 3686.00 | 3711.00 | 0 |
| 2019-03-16 | Multi-Stage Fracture | 6464.00 | 6489.00 | 0 |
| 2019-03-17 | Multi-Stage Fracture | 6416.00 | 6441.00 | 0 |
| 2019-03-17 | Multi-Stage Fracture | 6368.00 | 6393.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-03-14 | 2019-03-29 | 3,452 | 57,583 | N/A |
| 2 | 2019-03-23 | 2019-03-23 | 3,452 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 87.5204 | N/A | |||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.3063 | N/A | ||
| 50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4957 | N/A | ||
| 15% HCl Acid | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.5329 | N/A | |
| Water | 7732-18-5 | 100 | 0.5329 | N/A | ||||
| SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0111 | N/A | |
| Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0112 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0111 | N/A | ||||
| Polyethylene glycol | 25322-68-3 | 100 | 0.0111 | N/A | ||||
| Sodium bromide | 7647-15-6 | 100 | 0.0111 | N/A | ||||
| CalVisc?. High Viscosity Friction Reducer | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0993 | N/A | |
| DynaScale 3515. Scale Inhibitor | Calfrac | Scale Inhibitor | Methanol | 67-56-1 | 100 | 0.0142 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0142 | N/A | ||||
| CalSurf 9400. Flowback Surfactant | Calfrac | Surfactant | Ethoxylated Alcohols | 11855 | 100 | 0.0197 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0197 | N/A | ||||
| Non-Hazardous Ingredients | 11738 | 100 | 0.0197 | N/A | ||||
| 2 | DWP-690. Slickwater Breaker | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0034 | N/A |
| Water | 7732-18-5 | 100 | 0.0034 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-03-14 | 2019-03-29 | Central Water Distribution Facility | 59717 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 6103 | 0.0 | 0.0 | 0.0 |
| 2020 | 1746 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-02-20 | No Incident Encountered | 0.00 | 0.00 |
| 2019-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]