X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626031816020

Well Details

Well ID: 0626031816020
Loading map...
Location: 02/16-18-062-03W6/0
Location Alias: 02/16-18-62-03 W6M
Location Alias 2: 02/16-18-062-03 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ 102 KAKWA 16-18-62-3
Operator Name: Strath Resources Ltd.
License Number: 0484948
License Date: 2017-08-10
License Status: Amended
Spud Date: 2018-02-23
Final Drill Date: 2018-05-05
Well Total Depth: 5950.00 m
Surface Hole Latitude: 54.345124
Surface Hole Longitude: -118.431519

For data sources see[1][2]

Well History

Date Event
2017-08-10 Obtained License
2018-02-25 Surface Casing Operation Performed
2018-03-05 Direction Drilling Operation Performed - Deviate
2018-03-14 Intermediate Casing Operation Performed
2018-04-22 Direction Drilling Operation Performed - Horizontal
2018-04-28 Well Log Performed
2018-05-05 Finished Drilling
2018-05-05 Well Log Performed
2018-05-05 Well Mode changed to Drilled and Cased
2018-05-08 Liner Casing Operation Performed
2018-05-10 Rig Released
2018-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Well Began Production
2018-09-01 Well Fluid changed to Gas
2018-09-01 Well Mode changed to Flowing
2018-09-18 Well Log Performed
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-04-22 Precision Drilling Corporation 543 N/A Resumption
2018-02-23 Precision Drilling Corporation 543 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-05 2814.60 Deviate (5 - 79 degrees)
2018-04-22 3325.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-08 Multi-Stage Fracture 5866.00 5890.00 0
2018-08-11 Multi-Stage Fracture 5434.00 5458.00 0
2018-08-11 Multi-Stage Fracture 5386.00 5410.00 0
2018-08-12 Multi-Stage Fracture 5338.00 5362.00 0
2018-08-12 Multi-Stage Fracture 5290.00 5314.00 0
2018-08-12 Multi-Stage Fracture 5242.00 5266.00 0
2018-08-12 Multi-Stage Fracture 5194.00 5218.00 0
2018-08-13 Multi-Stage Fracture 5146.00 5170.00 0
2018-08-13 Multi-Stage Fracture 5098.00 5122.00 0
2018-08-13 Multi-Stage Fracture 5050.00 5074.00 0
2018-08-13 Multi-Stage Fracture 5002.00 5026.00 0
2018-08-09 Multi-Stage Fracture 5818.00 5842.00 0
2018-08-13 Multi-Stage Fracture 4954.00 4978.00 0
2018-08-14 Multi-Stage Fracture 4906.00 4930.00 0
2018-08-14 Multi-Stage Fracture 4858.00 4882.00 0
2018-08-14 Multi-Stage Fracture 4810.00 4834.00 0
2018-08-14 Multi-Stage Fracture 4762.00 4786.00 0
2018-08-14 Multi-Stage Fracture 4714.00 4738.00 0
2018-08-15 Multi-Stage Fracture 4666.00 4690.00 0
2018-08-15 Multi-Stage Fracture 4618.00 4642.00 0
2018-08-15 Multi-Stage Fracture 4570.00 4594.00 0
2018-08-15 Multi-Stage Fracture 4522.00 4546.00 0
2018-08-09 Multi-Stage Fracture 5770.00 5794.00 0
2018-08-15 Multi-Stage Fracture 4474.00 4498.00 0
2018-08-16 Multi-Stage Fracture 4426.00 4450.00 0
2018-08-16 Multi-Stage Fracture 4378.00 4402.00 0
2018-08-16 Multi-Stage Fracture 4330.00 4354.00 0
2018-08-16 Multi-Stage Fracture 4282.00 4306.00 0
2018-08-17 Multi-Stage Fracture 4234.00 4258.00 0
2018-08-17 Multi-Stage Fracture 4186.00 4210.00 0
2018-08-17 Multi-Stage Fracture 4138.00 4162.00 0
2018-08-17 Multi-Stage Fracture 4090.00 4114.00 0
2018-08-18 Multi-Stage Fracture 4042.00 4066.00 0
2018-08-10 Multi-Stage Fracture 5722.00 5746.00 0
2018-08-18 Multi-Stage Fracture 3994.00 4018.00 0
2018-08-19 Multi-Stage Fracture 3946.00 3970.00 0
2018-08-19 Multi-Stage Fracture 3898.00 3922.00 0
2018-08-19 Multi-Stage Fracture 3850.00 3874.00 0
2018-08-20 Multi-Stage Fracture 3802.00 3826.00 0
2018-08-20 Multi-Stage Fracture 3754.00 3778.00 0
2018-08-21 Multi-Stage Fracture 3706.00 3730.00 0
2018-08-21 Multi-Stage Fracture 3658.00 3682.00 0
2018-08-22 Multi-Stage Fracture 3610.00 3634.00 0
2018-08-22 Multi-Stage Fracture 3562.00 3586.00 0
2018-08-10 Multi-Stage Fracture 5674.00 5698.00 0
2018-08-23 Multi-Stage Fracture 3514.00 3538.00 0
2018-08-23 Multi-Stage Fracture 3466.00 3490.00 0
2018-08-23 Multi-Stage Fracture 3418.00 3442.00 0
2018-08-23 Multi-Stage Fracture 3370.00 3394.00 0
2018-08-10 Multi-Stage Fracture 5626.00 5650.00 0
2018-08-10 Multi-Stage Fracture 5578.00 5602.00 0
2018-08-11 Multi-Stage Fracture 5530.00 5554.00 0
2018-08-11 Multi-Stage Fracture 5482.00 5506.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-08 2018-08-23 3,209 52,133 N/A
2 2018-08-09 2018-08-23 3,209 0 N/A
3 2018-08-08 2018-08-18 3,209 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.938 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.1311 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.6479 N/A
Water 7732-18-5 100 0.6479 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0116 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0116 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0116 N/A
Polyethylene glycol 25322-68-3 100 0.0116 N/A
Sodium bromide 7647-15-6 100 0.0116 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0437 N/A
Water 7732-18-5 100 0.0437 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.2131 N/A
DynaScale 3515 Calfrac Well Services Scale Inhibitor Methanol 67-56-1 100 0.0146 N/A
Non-Hazardous Trade Secret 100 0.0146 N/A
CalSurf 9400 Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0197 N/A
Methanol 67-56-1 100 0.0197 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0197 N/A
2 40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.3319 N/A
3 DynaRate 6104 Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0914 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0914 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0914 N/A
Oleamide Trade Secret 100 0.0914 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-08 2018-08-23 Central Water Distribution Facility 54213

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1960 0.0 0.0 0.0
2019 8256 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-10 No Incident Encountered 0.00 0.00
2018-08-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References