X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626031815042

Well Details

Well ID: 0626031815042
Loading map...
Location: 04/15-18-062-03W6/2
Location Alias: 04/15-18-62-03 W6M
Location Alias 2: 04/15-18-062-03 W6/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ 104 KAKWA 15-18-62-3
Operator Name: Strath Resources Ltd.
License Number: 0489460
License Date: 2018-06-05
License Status: Amended
Spud Date: 2018-11-08
Final Drill Date: 2019-01-13
Well Total Depth: 5940.00 m
Surface Hole Latitude: 54.345190
Surface Hole Longitude: -118.432334

For data sources see[1][2]

Well History

Date Event
2018-06-05 Obtained License
2018-11-10 Surface Casing Operation Performed
2018-11-12 Direction Drilling Operation Performed - Deviate
2018-12-28 Direction Drilling Operation Performed - Horizontal
2018-12-30 Well Log Performed
2019-01-13 Finished Drilling
2019-01-13 Well Mode changed to Drilled and Cased
2019-01-14 Well Log Performed
2019-01-19 Liner Casing Operation Performed
2019-01-22 Rig Released
2019-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-01 Well Began Production
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-11-12 764.40 Deviate (5 - 79 degrees)
2018-12-28 3155.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-14 Multi-Stage Fracture 5840.00 5864.00 0
2019-06-17 Multi-Stage Fracture 5408.00 5432.00 0
2019-06-18 Multi-Stage Fracture 5360.00 5384.00 0
2019-06-18 Multi-Stage Fracture 5312.00 5336.00 0
2019-06-18 Multi-Stage Fracture 5264.00 5288.00 0
2019-06-19 Multi-Stage Fracture 5216.00 5240.00 0
2019-06-19 Multi-Stage Fracture 5168.00 5192.00 0
2019-06-19 Multi-Stage Fracture 5120.00 5144.00 0
2019-06-19 Multi-Stage Fracture 5072.00 5096.00 0
2019-06-19 Multi-Stage Fracture 5024.00 5048.00 0
2019-06-20 Multi-Stage Fracture 4976.00 5000.00 0
2019-06-15 Multi-Stage Fracture 5792.00 5816.00 0
2019-06-20 Multi-Stage Fracture 4928.00 4952.00 0
2019-06-20 Multi-Stage Fracture 4880.00 4904.00 0
2019-06-21 Multi-Stage Fracture 4832.00 4856.00 0
2019-06-21 Multi-Stage Fracture 4784.00 4808.00 0
2019-06-21 Multi-Stage Fracture 4736.00 4760.00 0
2019-06-21 Multi-Stage Fracture 4688.00 4712.00 0
2019-06-22 Multi-Stage Fracture 4640.00 4664.00 0
2019-06-22 Multi-Stage Fracture 4592.00 4616.00 0
2019-06-22 Multi-Stage Fracture 4544.00 4568.00 0
2019-06-22 Multi-Stage Fracture 4496.00 4520.00 0
2019-06-15 Multi-Stage Fracture 5744.00 5768.00 0
2019-06-22 Multi-Stage Fracture 4448.00 4472.00 0
2019-06-23 Multi-Stage Fracture 4400.00 4424.00 0
2019-06-23 Multi-Stage Fracture 4352.00 4376.00 0
2019-06-24 Multi-Stage Fracture 4304.00 4328.00 0
2019-06-24 Multi-Stage Fracture 4256.00 4280.00 0
2019-06-24 Multi-Stage Fracture 4208.00 4232.00 0
2019-06-24 Multi-Stage Fracture 4160.00 4184.00 0
2019-06-25 Multi-Stage Fracture 4112.00 4136.00 0
2019-06-25 Multi-Stage Fracture 4064.00 4088.00 0
2019-06-25 Multi-Stage Fracture 4016.00 4040.00 0
2019-06-15 Multi-Stage Fracture 5696.00 5720.00 0
2019-06-25 Multi-Stage Fracture 3968.00 3992.00 0
2019-06-25 Multi-Stage Fracture 3920.00 3944.00 0
2019-06-26 Multi-Stage Fracture 3872.00 3896.00 0
2019-06-26 Multi-Stage Fracture 3824.00 3848.00 0
2019-06-26 Multi-Stage Fracture 3776.00 3800.00 0
2019-06-26 Multi-Stage Fracture 3728.00 3752.00 0
2019-06-27 Multi-Stage Fracture 3680.00 3704.00 0
2019-06-27 Multi-Stage Fracture 3632.00 3656.00 0
2019-06-27 Multi-Stage Fracture 3584.00 3608.00 0
2019-06-28 Multi-Stage Fracture 3536.00 3560.00 0
2019-06-15 Multi-Stage Fracture 5648.00 5672.00 0
2019-06-28 Multi-Stage Fracture 3488.00 3512.00 0
2019-06-28 Multi-Stage Fracture 3440.00 3464.00 0
2019-06-28 Multi-Stage Fracture 3392.00 3416.00 0
2019-06-29 Multi-Stage Fracture 3344.00 3368.00 0
2019-06-15 Multi-Stage Fracture 5600.00 5624.00 0
2019-06-16 Multi-Stage Fracture 5552.00 5576.00 0
2019-06-16 Multi-Stage Fracture 5504.00 5528.00 0
2019-06-16 Multi-Stage Fracture 5456.00 5480.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-14 2019-06-29 3,216 50,641 N/A
2 2019-06-15 2019-06-29 3,216 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.3958 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.7136 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.5188 N/A
28% HCl Acid Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3471 N/A
Water 7732-18-5 100 0.3471 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0116 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0116 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0116 N/A
Polyethylene glycol 25322-68-3 100 0.0116 N/A
Sodium bromide 7647-15-6 100 0.0116 N/A
CalVisc?. High Viscosity Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1502 N/A
DynaScale 3515. Scale Inhibitor Calfrac Scale Inhibitor Methanol 67-56-1 100 0.0145 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0145 N/A
CalSurf 9400. Flowback Surfactant Calfrac Surfactant Ethoxylated Alcohols 11855 100 0.0198 N/A
Methanol 67-56-1 100 0.0198 N/A
Non-Hazardous Ingredients 11738 100 0.0198 N/A
2 DWP-690. Slickwater Breaker Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0177 N/A
Water 7732-18-5 100 0.0177 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3836 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-22 No Incident Encountered 0.00 0.00
2019-06-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References