X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626031015000

Well Details

Well ID: 0626031015000
Loading map...
Location: 00/15-10-062-03W6/0
Location Alias: 00/15-10-62-03 W6M
Location Alias 2: 00/15-10-062-03 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ KAKWA 15-10-62-3
Operator Name: Strath Resources Ltd.
License Number: 0457838
License Date: 2013-07-03
License Status: Amended
Spud Date: 2013-11-06
Final Drill Date: 2014-01-13
Well Total Depth: 4894.00 m
Surface Hole Latitude: 54.340296
Surface Hole Longitude: -118.352547

For data sources see[1][2]

Well History

Date Event
2013-07-03 Obtained License
2013-11-12 Surface Casing Operation Performed
2013-11-14 Direction Drilling Operation Performed - Deviate
2013-12-17 Intermediate Casing Operation Performed
2013-12-19 Well Log Performed
2013-12-29 Direction Drilling Operation Performed - Horizontal
2014-01-13 Finished Drilling
2014-01-13 Well Log Performed
2014-01-13 Well Mode changed to Drilled and Cased
2014-01-14 Well Log Performed
2014-01-22 Liner Casing Operation Performed
2014-01-22 Rig Released
2014-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-12 Well Began Production
2014-06-12 Well Fluid changed to Gas
2014-06-12 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-06 Horizon Drilling Inc. 37 N/A Drill To LD
2013-11-06 Horizon Drilling Inc. 37 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-14 746.00 Deviate (5 - 79 degrees)
2013-12-29 3580.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-13 Multi-Stage Fracture 4852.40 4852.60 0
2014-02-14 Multi-Stage Fracture 4199.30 4199.40 0
2014-02-14 Multi-Stage Fracture 4126.50 4126.60 0
2014-02-14 Multi-Stage Fracture 4053.80 4053.90 0
2014-02-14 Multi-Stage Fracture 3968.30 3968.40 0
2014-02-14 Multi-Stage Fracture 3895.70 3895.80 0
2014-02-14 Multi-Stage Fracture 3819.10 3819.20 0
2014-02-15 Multi-Stage Fracture 3755.40 3755.50 0
2014-02-15 Multi-Stage Fracture 3681.20 3681.30 0
2014-02-15 Multi-Stage Fracture 3610.20 3610.30 0
2014-02-13 Multi-Stage Fracture 4785.70 4785.80 0
2014-02-13 Multi-Stage Fracture 4712.00 4712.10 0
2014-02-13 Multi-Stage Fracture 4636.80 4636.90 0
2014-02-13 Multi-Stage Fracture 4563.00 4563.10 0
2014-02-13 Multi-Stage Fracture 4490.00 4490.10 0
2014-02-14 Multi-Stage Fracture 4417.30 4417.40 0
2014-02-14 Multi-Stage Fracture 4345.30 4345.40 0
2014-02-14 Multi-Stage Fracture 4272.30 4272.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-13 2014-02-15 3,447 14,825 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.9428 N/A
FultonTec FTecLite (30/50) Canyon Mullite 1302-93-8 100 0.9819 N/A
Silica Crystalline-Cristobalite 14464-46-1 100 0.9819 N/A
Silicon Dioxide (amorphous as glass) 7631-86-9 100 0.9819 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 4.1209 N/A
Crystalline silica. quartz 14808-60-7 100 4.1209 N/A
Iron Oxide 1309-37-1 100 4.1209 N/A
Titanium Oxide 13463-67-7 100 4.1208 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.7543 N/A
Crystalline silica. quartz 14808-60-7 100 5.7543 N/A
Iron Oxide 1309-37-1 100 5.7543 N/A
Titanium Oxide 13463-67-7 100 5.7543 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.013 N/A
Water 7732-18-5 100 0.013 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0495 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.0498 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0875 N/A
Methanol 67-56-1 100 0.0875 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0875 N/A
Water 7732-18-5 100 0.0875 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-02 2014-02-15 Surface Water - River 17709

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 4416 0.0 0.0 0.0
2015 5182 0.0 0.0 0.0
2016 3912 0.0 0.0 0.0
2017 8041 0.0 0.0 0.0
2018 3804 0.0 0.0 0.0
2019 94 0.0 0.0 0.0
2020 1 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-22 No Incident Encountered 0.00 0.00
2014-03-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References