X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626030814050

Well Details

Well ID: 0626030814050
Loading map...
Location: 05/14-08-062-03W6/0
Location Alias: 05/14-08-62-03 W6M
Location Alias 2: 05/14-08-062-03 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ 105 KAKWA 14-8-62-3
Operator Name: Strath Resources Ltd.
License Number: 0489474
License Date: 2018-06-05
License Status: Issued
Spud Date: 2018-06-25
Final Drill Date: 2018-08-08
Well Total Depth: 5983.00 m
Surface Hole Latitude: 54.330308
Surface Hole Longitude: -118.418650

For data sources see[1][2]

Well History

Date Event
2018-06-05 Obtained License
2018-06-27 Surface Casing Operation Performed
2018-07-13 Direction Drilling Operation Performed - Deviate
2018-07-26 Intermediate Casing Operation Performed
2018-07-28 Direction Drilling Operation Performed - Horizontal
2018-07-30 Well Log Performed
2018-08-06 Well Log Performed
2018-08-08 Finished Drilling
2018-08-08 Well Mode changed to Drilled and Cased
2018-08-11 Liner Casing Operation Performed
2018-08-12 Rig Released
2018-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-01 Well Began Production
2018-11-01 Well Fluid changed to Gas
2018-11-01 Well Mode changed to Flowing
2018-11-07 Well Log Performed
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-13 Precision Drilling Corporation 543 N/A Resumption
2018-06-25 Precision Drilling Corporation 543 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-13 840.10 Deviate (5 - 79 degrees)
2018-07-28 3382.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-18 Multi-Stage Fracture 5885.20 5909.90 0
2018-10-20 Multi-Stage Fracture 5458.60 5483.30 0
2018-10-20 Multi-Stage Fracture 5411.20 5435.90 0
2018-10-20 Multi-Stage Fracture 5363.80 5388.50 0
2018-10-21 Multi-Stage Fracture 5316.40 5341.10 0
2018-10-21 Multi-Stage Fracture 5269.00 5293.70 0
2018-10-21 Multi-Stage Fracture 5221.60 5246.30 0
2018-10-21 Multi-Stage Fracture 5174.20 5189.90 0
2018-10-21 Multi-Stage Fracture 5126.80 5151.50 0
2018-10-22 Multi-Stage Fracture 5079.40 5104.10 0
2018-10-22 Multi-Stage Fracture 5032.00 5056.70 0
2018-10-18 Multi-Stage Fracture 5837.80 5862.50 0
2018-10-22 Multi-Stage Fracture 4984.60 5009.30 0
2018-10-22 Multi-Stage Fracture 4937.20 4961.90 0
2018-10-23 Multi-Stage Fracture 4889.80 4914.50 0
2018-10-23 Multi-Stage Fracture 4842.40 4867.10 0
2018-10-23 Multi-Stage Fracture 4795.00 4819.70 0
2018-10-23 Multi-Stage Fracture 4747.60 4772.30 0
2018-10-23 Multi-Stage Fracture 4700.20 4724.90 0
2018-10-24 Multi-Stage Fracture 4652.80 4677.50 0
2018-10-24 Multi-Stage Fracture 4605.40 4630.10 0
2018-10-24 Multi-Stage Fracture 4558.00 4582.70 0
2018-10-18 Multi-Stage Fracture 5790.40 5815.10 0
2018-10-24 Multi-Stage Fracture 4510.60 4535.30 0
2018-10-24 Multi-Stage Fracture 4463.20 4487.90 0
2018-10-25 Multi-Stage Fracture 4415.80 4440.50 0
2018-10-25 Multi-Stage Fracture 4368.40 4393.10 0
2018-10-25 Multi-Stage Fracture 4321.00 4345.70 0
2018-10-25 Multi-Stage Fracture 4273.60 4298.30 0
2018-10-25 Multi-Stage Fracture 4226.20 4250.90 0
2018-10-26 Multi-Stage Fracture 4178.80 4203.50 0
2018-10-26 Multi-Stage Fracture 4131.40 4156.10 0
2018-10-26 Multi-Stage Fracture 4084.00 4108.70 0
2018-10-18 Multi-Stage Fracture 5743.00 5767.00 0
2018-10-26 Multi-Stage Fracture 4036.60 4061.30 0
2018-10-26 Multi-Stage Fracture 3989.20 4013.90 0
2018-10-27 Multi-Stage Fracture 3941.80 3966.50 0
2018-10-27 Multi-Stage Fracture 3894.40 3919.10 0
2018-10-27 Multi-Stage Fracture 3752.20 3776.90 0
2018-10-27 Multi-Stage Fracture 3705.00 3729.90 0
2018-10-27 Multi-Stage Fracture 3657.00 3681.90 0
2018-10-28 Multi-Stage Fracture 3610.00 3634.70 0
2018-10-28 Multi-Stage Fracture 3562.60 3587.30 0
2018-10-28 Multi-Stage Fracture 3515.20 3539.90 0
2018-10-19 Multi-Stage Fracture 5695.60 5720.30 0
2018-10-28 Multi-Stage Fracture 3467.80 3492.50 0
2018-10-28 Multi-Stage Fracture 3420.40 3445.10 0
2018-10-29 Multi-Stage Fracture 3373.00 3397.90 0
2018-10-19 Multi-Stage Fracture 5648.20 5672.90 0
2018-10-19 Multi-Stage Fracture 5600.80 5625.50 0
2018-10-19 Multi-Stage Fracture 5553.40 5578.10 0
2018-10-20 Multi-Stage Fracture 5506.00 5530.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-18 2018-10-29 3,285 45,185 N/A
2 2018-10-19 2018-10-29 3,285 0 N/A
3 2018-10-20 2018-10-29 3,285 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.2366 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.5224 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.4972 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5408 N/A
Water 7732-18-5 100 0.5408 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0115 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0115 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0115 N/A
Polyethylene glycol 25322-68-3 100 0.0115 N/A
Sodium bromide 7647-15-6 100 0.0115 N/A
DynaRate 6000 Calfrac Friction Reducer Distillates (petroleum). hydrotreated light 64742-47-8 100 0.074 N/A
Non-Hazardous Ingredients Trade Secret 100 0.074 N/A
Proprietary polymer Trade Secret 100 0.074 N/A
Proprietary surfactant blend Trade Secret 100 0.074 N/A
DynaScale 3515 Calfrac Well Services Scale Inhibitor Methanol 67-56-1 100 0.0148 N/A
Non-Hazardous Trade Secret 100 0.0148 N/A
CalSurf 9400 Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0202 N/A
Methanol 67-56-1 100 0.0202 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0202 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0137 N/A
Water 7732-18-5 100 0.0137 N/A
3 CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.094 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-13 2018-10-29 Central Water Distribution Facility 45943

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1032 0.0 0.0 0.0
2019 8323 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-12 No Incident Encountered 0.00 0.00
2018-10-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References