If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626030813020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.330758,"lon":-118.418188,"icon":""}]} |
| Location: 02/13-08-062-03W6/0 | |
| Location Alias: 02/13-08-62-03 W6M | |
| Location Alias 2: 02/13-08-062-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 08 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: STRATH HZ 102 KAKWA 13-8-62-3 | |
| Operator Name: Strath Resources Ltd. | |
| License Number: 0484242 | |
| License Date: 2017-06-28 | |
| License Status: Issued | |
| Spud Date: 2017-08-04 | |
| Final Drill Date: 2017-09-14 | |
| Well Total Depth: 5801.00 m | |
| Surface Hole Latitude: 54.330758 | |
| Surface Hole Longitude: -118.418188 |
| Date | Event |
|---|---|
| 2017-06-28 | Obtained License |
| 2017-08-16 | Direction Drilling Operation Performed - Deviate |
| 2017-08-23 | Well Log Performed |
| 2017-08-28 | Direction Drilling Operation Performed - Horizontal |
| 2017-09-04 | Well Log Performed |
| 2017-09-14 | Finished Drilling |
| 2017-09-14 | Well Log Performed |
| 2017-09-14 | Well Mode changed to Drilled and Cased |
| 2017-09-15 | Well Log Performed |
| 2017-09-20 | Liner Casing Operation Performed |
| 2017-09-21 | Rig Released |
| 2017-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-01-02 | Well Began Production |
| 2018-01-02 | Well Fluid changed to Gas |
| 2018-01-02 | Well Mode changed to Flowing |
| 2018-01-05 | Well Log Performed |
| 2018-01-06 | Well Log Performed |
| 2019-07-01 | Well Fluid changed to Gas |
| 2019-07-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-08-04 | Excalibur Drilling Ltd. | 4 | N/A | Drill To LD |
| 2017-08-04 | Ironhand Drilling Inc. | 4 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-08-16 | 3065.90 | Deviate (5 - 79 degrees) |
| 2017-08-28 | 3430.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-12-06 | Multi-Stage Fracture | 5758.70 | 5758.80 | 0 |
| 2017-12-08 | Multi-Stage Fracture | 5043.90 | 5044.00 | 0 |
| 2017-12-08 | Multi-Stage Fracture | 4957.90 | 4958.00 | 0 |
| 2017-12-08 | Multi-Stage Fracture | 4883.80 | 4883.90 | 0 |
| 2017-12-09 | Multi-Stage Fracture | 4798.70 | 4798.80 | 0 |
| 2017-12-09 | Multi-Stage Fracture | 4724.70 | 4724.80 | 0 |
| 2017-12-10 | Multi-Stage Fracture | 4639.30 | 4639.40 | 0 |
| 2017-12-10 | Multi-Stage Fracture | 4565.10 | 4565.20 | 0 |
| 2017-12-10 | Multi-Stage Fracture | 4479.20 | 4479.30 | 0 |
| 2017-12-10 | Multi-Stage Fracture | 4405.90 | 4406.00 | 0 |
| 2017-12-10 | Multi-Stage Fracture | 4320.30 | 4320.40 | 0 |
| 2017-12-06 | Multi-Stage Fracture | 5670.70 | 5670.80 | 0 |
| 2017-12-11 | Multi-Stage Fracture | 4246.90 | 4247.00 | 0 |
| 2017-12-11 | Multi-Stage Fracture | 4160.00 | 4161.00 | 0 |
| 2017-12-11 | Multi-Stage Fracture | 4087.00 | 4087.10 | 0 |
| 2017-12-11 | Multi-Stage Fracture | 4001.10 | 4001.20 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3926.00 | 3927.00 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3841.10 | 3842.10 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3767.70 | 3767.80 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3682.20 | 3682.30 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3596.50 | 3596.60 | 0 |
| 2017-12-12 | Multi-Stage Fracture | 3523.00 | 3524.00 | 0 |
| 2017-12-06 | Multi-Stage Fracture | 5596.80 | 5596.90 | 0 |
| 2017-12-06 | Multi-Stage Fracture | 5522.70 | 5522.80 | 0 |
| 2017-12-07 | Multi-Stage Fracture | 5448.70 | 5448.80 | 0 |
| 2017-12-07 | Multi-Stage Fracture | 5363.30 | 5363.40 | 0 |
| 2017-12-07 | Multi-Stage Fracture | 5277.50 | 5277.60 | 0 |
| 2017-12-08 | Multi-Stage Fracture | 5203.70 | 5203.80 | 0 |
| 2017-12-08 | Multi-Stage Fracture | 5118.10 | 5118.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-12-06 | 2017-12-12 | 3,313 | 28,050 | N/A |
| 2 | 2017-12-08 | 2017-12-08 | 3,313 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 88.9723 | N/A | |||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 10.1513 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.4248 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.011 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.011 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.011 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.011 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.011 | N/A | ||||
| GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0326 | N/A | |
| SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0207 | N/A | |
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0215 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0215 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0215 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0215 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0215 | N/A | ||||
| 2 | Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 2.1201 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-12-06 | 2017-12-12 | Central Water Distribution Facility | 28050 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 7472 | 0.0 | 0.0 | 0.0 |
| 2019 | 8203 | 0.0 | 0.0 | 0.0 |
| 2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-09-21 | No Incident Encountered | 0.00 | 0.00 |
| 2017-12-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]