If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626030813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.330309,"lon":-118.418187,"icon":""}]} |
Location: 00/13-08-062-03W6/0 | |
Location Alias: 00/13-08-62-03 W6M | |
Location Alias 2: 00/13-08-062-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 03 | |
Section: 08 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: STRATH KAKWA 13-8-62-3 | |
Operator Name: Strath Resources Ltd. | |
License Number: 0484136 | |
License Date: 2017-06-16 | |
License Status: Issued | |
Spud Date: 2017-07-30 | |
Final Drill Date: 2017-09-24 | |
Well Total Depth: 5841.00 m | |
Surface Hole Latitude: 54.330309 | |
Surface Hole Longitude: -118.418187 |
Date | Event |
---|---|
2017-06-16 | Obtained License |
2017-07-30 | Well Mode changed to Preset |
2017-08-01 | Surface Casing Operation Performed |
2017-08-23 | Direction Drilling Operation Performed - Deviate |
2017-09-01 | Intermediate Casing Operation Performed |
2017-09-03 | Direction Drilling Operation Performed - Horizontal |
2017-09-07 | Well Log Performed |
2017-09-24 | Finished Drilling |
2017-09-24 | Well Log Performed |
2017-09-24 | Well Mode changed to Drilled and Cased |
2017-09-25 | Well Log Performed |
2017-09-29 | Liner Casing Operation Performed |
2017-10-01 | Rig Released |
2017-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-20 | Well Began Production |
2017-12-20 | Well Fluid changed to Gas |
2017-12-20 | Well Mode changed to Flowing |
2017-12-29 | Well Log Performed |
2018-11-26 | Well Log Performed |
2019-07-01 | Well Fluid changed to Gas |
2019-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-08-03 | Ironhand Drilling Inc. | 4 | N/A | Set Surface |
2017-08-18 | Ironhand Drilling Inc. | 7 | N/A | Resumption |
2017-07-30 | Ironhand Drilling Inc. | 4 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-08-23 | 2925.00 | Deviate (5 - 79 degrees) |
2017-09-03 | 3426.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-11-29 | Multi-Stage Fracture | 5801.70 | 5802.70 | 0 |
2017-11-30 | Multi-Stage Fracture | 5318.30 | 5318.40 | 0 |
2017-11-30 | Multi-Stage Fracture | 5267.60 | 5267.70 | 0 |
2017-11-30 | Multi-Stage Fracture | 5205.20 | 5205.30 | 0 |
2017-12-01 | Multi-Stage Fracture | 5119.70 | 5119.80 | 0 |
2017-12-01 | Multi-Stage Fracture | 5011.20 | 5011.30 | 0 |
2017-12-01 | Multi-Stage Fracture | 4914.20 | 4914.30 | 0 |
2017-12-02 | Multi-Stage Fracture | 4828.80 | 4828.90 | 0 |
2017-12-02 | Multi-Stage Fracture | 4743.10 | 4743.20 | 0 |
2017-12-03 | Multi-Stage Fracture | 4669.60 | 4669.70 | 0 |
2017-12-03 | Multi-Stage Fracture | 4595.50 | 4595.60 | 0 |
2017-11-29 | Multi-Stage Fracture | 5736.50 | 5736.60 | 0 |
2017-12-03 | Multi-Stage Fracture | 4509.70 | 4509.80 | 0 |
2017-12-03 | Multi-Stage Fracture | 4412.30 | 4412.40 | 0 |
2017-12-04 | Multi-Stage Fracture | 4503.80 | 4503.90 | 0 |
2017-12-04 | Multi-Stage Fracture | 4206.50 | 4206.60 | 0 |
2017-12-04 | Multi-Stage Fracture | 4086.10 | 4086.20 | 0 |
2017-12-04 | Multi-Stage Fracture | 3953.80 | 3953.90 | 0 |
2017-12-05 | Multi-Stage Fracture | 3833.30 | 3833.40 | 0 |
2017-12-05 | Multi-Stage Fracture | 3724.50 | 3724.60 | 0 |
2017-12-05 | Multi-Stage Fracture | 3615.50 | 3615.60 | 0 |
2017-12-05 | Multi-Stage Fracture | 3518.70 | 3518.80 | 0 |
2017-11-29 | Multi-Stage Fracture | 5685.60 | 5685.70 | 0 |
2017-11-29 | Multi-Stage Fracture | 5634.50 | 5634.60 | 0 |
2017-11-30 | Multi-Stage Fracture | 5583.50 | 5583.60 | 0 |
2017-11-30 | Multi-Stage Fracture | 5532.90 | 5533.00 | 0 |
2017-11-30 | Multi-Stage Fracture | 5482.00 | 5482.10 | 0 |
2017-11-30 | Multi-Stage Fracture | 5419.70 | 5419.80 | 0 |
2017-11-30 | Multi-Stage Fracture | 5368.90 | 5369.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-11-29 | 2017-12-05 | 3,278 | 27,431 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 88.7363 | N/A | |||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 10.7118 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.4672 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0107 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0107 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0107 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.031 | N/A | |
SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.021 | N/A | |
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0217 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0217 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0217 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0217 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0217 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-11-29 | 2017-12-05 | Central Water Distribution Facility | 27431 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 109 | 0.0 | 0.0 | 0.0 |
2018 | 7047 | 0.0 | 0.0 | 0.0 |
2019 | 7577 | 0.0 | 0.0 | 0.0 |
2020 | 2134 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-03 | No Incident Encountered | 0.00 | 0.00 |
2017-10-01 | No Incident Encountered | 0.00 | 0.00 |
2017-12-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]