X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626022809000

Well Details

Well ID: 0626022809000
Loading map...
Location: 00/09-28-062-02W6/0
Location Alias: 00/09-28-62-02 W6M
Location Alias 2: 00/09-28-062-02 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 02
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ LATOR 9-28-62-2
Operator Name: Strath Resources Ltd.
License Number: 0428575
License Date: 2010-12-21
License Status: Issued
Spud Date: 2011-02-11
Final Drill Date: 2011-03-13
Well Total Depth: 4055.00 m
Surface Hole Latitude: 54.389777
Surface Hole Longitude: -118.251202

For data sources see[1][2]

Well History

Date Event
2010-12-21 Obtained License
2011-02-15 Surface Casing Operation Performed
2011-02-21 Direction Drilling Operation Performed - Horizontal
2011-02-28 Intermediate Casing Operation Performed
2011-03-01 Well Log Performed
2011-03-04 Well Log Performed
2011-03-05 Direction Drilling Operation Performed - Sidetrack Fish
2011-03-13 Finished Drilling
2011-03-13 Well Log Performed
2011-03-13 Well Mode changed to Drilled and Cased
2011-03-15 Perforation Treatment Performed - Open-Hole Completion
2011-03-17 Liner Casing Operation Performed
2011-03-20 Rig Released
2011-03-29 Well Log Performed
2011-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-14 Well Began Production
2011-06-14 Well Fluid changed to Crude Oil
2011-06-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-21 1975.00 Horizontal
2011-03-05 2808.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-15 Open Hole/Barefoot Completion 4050.00 4055.00 0
2011-04-08 Multi-Stage Fracture 3382.20 3382.30 0
2011-04-08 Multi-Stage Fracture 3296.70 3296.80 0
2011-04-08 Multi-Stage Fracture 3185.00 3185.10 0
2011-04-09 Multi-Stage Fracture 3076.90 3077.00 0
2011-04-09 Multi-Stage Fracture 2991.70 2991.80 0
2011-04-10 Multi-Stage Fracture 2892.80 2892.90 0
2011-04-10 Multi-Stage Fracture 2736.50 2736.60 0
2011-04-10 Multi-Stage Fracture 2691.20 2691.30 0
2011-03-31 Multi-Stage Fracture 4009.80 4009.90 0
2011-03-31 Multi-Stage Fracture 3951.10 3951.20 0
2011-03-31 Multi-Stage Fracture 3880.70 3880.80 0
2011-04-01 Multi-Stage Fracture 3797.30 3797.40 0
2011-04-01 Multi-Stage Fracture 3714.00 3714.10 0
2011-04-01 Multi-Stage Fracture 3631.90 3632.00 0
2011-04-07 Multi-Stage Fracture 3547.00 3547.10 0
2011-04-08 Multi-Stage Fracture 3467.40 3467.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4652 0.0 0.0 0.0
2012 7935 0.0 0.0 0.0
2013 6717 0.0 0.0 0.0
2014 6138 0.0 0.0 0.0
2015 6055 0.0 0.0 0.0
2016 8182 0.0 0.0 0.0
2017 7630 0.0 0.0 0.0
2018 7427 0.0 0.0 0.0
2019 3350 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References