X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625271101020

Well Details

Well ID: 0625271101020
Loading map...
Location: 02/01-11-062-27W5/0
Location Alias: 02/01-11-62-27 W5M
Location Alias 2: 02/01-11-062-27 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TEMPLE ENERGY HZ SIMON 1-11-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0421981
License Date: 2010-07-21
License Status: Amended
Spud Date: 2010-08-01
Final Drill Date: 2010-08-19
Well Total Depth: 4416.00 m
Surface Hole Latitude: 54.355353
Surface Hole Longitude: -117.949734

For data sources see[1][2]

Well History

Date Event
2010-07-21 Obtained License
2010-08-04 Surface Casing Operation Performed
2010-08-08 Direction Drilling Operation Performed - Horizontal
2010-08-14 Intermediate Casing Operation Performed
2010-08-19 Finished Drilling
2010-08-19 Well Log Performed
2010-08-19 Well Mode changed to Drilled and Cased
2010-08-22 Liner Casing Operation Performed
2010-08-22 Rig Released
2010-09-18 Perforation Treatment Performed - Open-Hole Completion
2010-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-30 Well Fluid changed to Gas
2010-09-30 Well Mode changed to Testing
2010-10-31 Well Began Production
2010-10-31 Well Fluid changed to Gas
2010-10-31 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-08 2326.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-18 Open Hole/Barefoot Completion 4414.00 4416.00 0
2010-09-25 Multi-Stage Fracture 3583.20 3583.30 0
2010-09-25 Multi-Stage Fracture 3481.50 3481.60 0
2010-09-25 Multi-Stage Fracture 3379.10 3379.20 0
2010-09-26 Multi-Stage Fracture 3290.90 3291.00 0
2010-09-26 Multi-Stage Fracture 3147.80 3147.90 0
2010-09-26 Multi-Stage Fracture 3045.40 3045.50 0
2010-09-26 Multi-Stage Fracture 2943.00 2943.10 0
2010-09-26 Multi-Stage Fracture 2827.10 2827.20 0
2010-09-19 Multi-Stage Fracture 4362.40 4362.50 0
2010-09-19 Multi-Stage Fracture 4229.30 4229.40 0
2010-09-19 Multi-Stage Fracture 4156.40 4156.50 0
2010-09-19 Multi-Stage Fracture 4026.70 4026.80 0
2010-09-19 Multi-Stage Fracture 3951.60 3951.70 0
2010-09-24 Multi-Stage Fracture 3863.00 3863.10 0
2010-09-24 Multi-Stage Fracture 3774.20 3774.30 0
2010-09-25 Multi-Stage Fracture 3658.20 3658.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1514 0.0 0.0 0.0
2011 6480 0.0 0.0 0.0
2012 8423 0.0 0.0 0.0
2013 8544 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 6456 0.0 0.0 0.0
2016 7824 0.0 0.0 0.0
2017 8303 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 8256 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

References