X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625260804032

Well Details

Well ID: 0625260804032
Loading map...
Location: 03/04-08-062-26W5/2
Location Alias: 03/04-08-62-26 W5M
Location Alias 2: 03/04-08-062-26 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 103 SIMON 4-8-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0479493
License Date: 2016-05-20
License Status: Suspension
Spud Date: 2016-07-11
Final Drill Date: 2016-07-22
Well Total Depth: 3180.00 m
Surface Hole Latitude: 54.343083
Surface Hole Longitude: -117.872233

For data sources see[1][2]

Well History

Date Event
2016-05-20 Obtained License
2016-07-12 Surface Casing Operation Performed
2016-07-14 Direction Drilling Operation Performed - Deviate
2016-07-22 Finished Drilling
2016-07-22 Well Log Performed
2016-07-22 Well Mode changed to Drilled and Cased
2016-07-23 Well Log Performed
2016-07-24 Well Log Performed
2016-07-25 Production Casing Operation Performed
2016-07-26 Rig Released
2016-08-11 Well Log Performed
2016-08-12 Perforation Treatment Performed - Jet Perforation
2016-08-12 Well Log Performed
2016-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-08-14 Perforation Treatment Performed - Jet Perforation
2016-08-14 Well Log Performed
2016-08-15 Perforation Treatment Performed - Fractured
2016-08-15 Well Log Performed
2016-08-18 Perforation Treatment Performed - Jet Perforation
2016-08-18 Well Log Performed
2016-12-15 Perforation Treatment Performed - Fractured
2017-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-19 Plug Back Performed
2017-07-21 Perforation Treatment Performed - Jet Perforation
2017-07-21 Well Log Performed
2017-07-23 Perforation Treatment Performed - Fractured
2017-07-26 Well Began Production
2017-07-26 Well Fluid changed to Crude Oil
2017-07-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-07-14 813.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-12 Perforation 3026.00 3034.00 20
2017-07-23 Fracture 2044.00 2052.00 0
2016-08-12 Perforation 3010.00 3021.00 20
2016-08-14 Acid Treatment 3010.00 3034.00 0
2016-08-14 Perforation 2880.00 2898.00 20
2016-08-15 Fracture 2880.00 2898.00 0
2016-08-18 Perforation 2898.00 2920.00 20
2016-12-15 Fracture 2880.00 3034.00 0
2017-07-19 Packing Device Capped w/Cement 2690.00 3065.00 0
2017-07-21 Perforation 2044.00 2052.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2976 0.0 0.0 0.0
2018 3459 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-28 No Incident Encountered 0.00 0.00
2016-08-26 No Incident Encountered 0.00 0.00
2016-12-22 No Incident Encountered 0.00 0.00
2017-03-21 No Incident Encountered 0.00 0.00
2017-07-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References