X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625251816020

Well Details

Well ID: 0625251816020
Loading map...
Location: 02/16-18-062-25W5/0
Location Alias: 02/16-18-62-25 W5M
Location Alias 2: 02/16-18-062-25 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 25
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: WHITECAP SIMON 16-18-62-25
Operator Name: Whitecap Resources Inc.
License Number: 0438918
License Date: 2011-11-15
License Status: Issued
Spud Date: 2011-11-29
Final Drill Date: 2011-12-24
Well Total Depth: 3308.00 m
Surface Hole Latitude: 54.354592
Surface Hole Longitude: -117.728014

For data sources see[1][2]

Well History

Date Event
2011-11-15 Obtained License
2011-11-30 Surface Casing Operation Performed
2011-12-03 Direction Drilling Operation Performed - Horizontal
2011-12-17 Intermediate Casing Operation Performed
2011-12-19 Well Log Performed
2011-12-24 Finished Drilling
2011-12-24 Well Mode changed to Drilled and Cased
2011-12-28 Liner Casing Operation Performed
2011-12-31 Rig Released
2012-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-01 Well Began Production
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Pumping
2016-03-01 Well Fluid changed to Crude Oil
2016-03-01 Well Mode changed to Suspended
2016-08-06 Well Fluid changed to Crude Oil
2016-08-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-03 1500.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Multi-Stage Fracture 3257.70 3257.80 0
2012-01-14 Multi-Stage Fracture 2355.90 2356.00 0
2012-01-14 Multi-Stage Fracture 2255.10 2255.20 0
2012-01-14 Multi-Stage Fracture 2160.80 2160.90 0
2012-01-13 Multi-Stage Fracture 3153.10 3153.20 0
2012-01-13 Multi-Stage Fracture 3059.70 3059.80 0
2012-01-13 Multi-Stage Fracture 2953.70 2953.80 0
2012-01-14 Multi-Stage Fracture 2860.20 2860.30 0
2012-01-14 Multi-Stage Fracture 2754.40 2754.50 0
2012-01-14 Multi-Stage Fracture 2661.00 2661.10 0
2012-01-14 Multi-Stage Fracture 2555.00 2555.10 0
2012-01-14 Multi-Stage Fracture 2461.50 2461.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2914 0.0 0.0 0.0
2013 2976 0.0 0.0 0.0
2014 696 0.0 0.0 0.0
2016 3333 0.0 0.0 0.0
2017 7448 0.0 0.0 0.0
2018 8016 0.0 0.0 0.0
2019 8326 0.0 0.0 0.0
2020 1951 0.0 0.0 0.0

For data sources see[6]

References