X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625251814000

Well Details

Well ID: 0625251814000
Loading map...
Location: 00/14-18-062-25W5/0
Location Alias: 00/14-18-62-25 W5M
Location Alias 2: 00/14-18-062-25 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 25
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: WHITECAP SIMON 14-18-62-25
Operator Name: Whitecap Resources Inc.
License Number: 0473825
License Date: 2014-12-22
License Status: Issued
Spud Date: 2015-01-07
Final Drill Date: 2015-01-17
Well Total Depth: 4459.00 m
Surface Hole Latitude: 54.345760
Surface Hole Longitude: -117.742216

For data sources see[1][2]

Well History

Date Event
2014-12-22 Obtained License
2015-01-08 Surface Casing Operation Performed
2015-01-10 Direction Drilling Operation Performed - Deviate
2015-01-11 Direction Drilling Operation Performed - Horizontal
2015-01-11 Well Log Performed
2015-01-12 Well Log Performed
2015-01-13 Production Casing Operation Performed
2015-01-17 Finished Drilling
2015-01-17 Well Log Performed
2015-01-17 Well Mode changed to Drilled and Cased
2015-01-18 Well Log Performed
2015-01-21 Rig Released
2015-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-10 Perforation Treatment Performed - Open-Hole Completion
2015-02-17 Well Log Performed
2015-02-19 Well Began Production
2015-02-19 Well Fluid changed to Crude Oil
2015-02-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-07 Quintera Drilling Ltd. 11 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-10 1638.90 Deviate (5 - 79 degrees)
2015-01-11 2210.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-10 Open Hole/Barefoot Completion 4454.00 4459.00 0
2015-02-10 Multi-Stage Fracture 3552.20 3552.30 0
2015-02-10 Multi-Stage Fracture 3482.90 3483.00 0
2015-02-10 Multi-Stage Fracture 3427.20 3427.30 0
2015-02-10 Multi-Stage Fracture 3358.00 3358.10 0
2015-02-10 Multi-Stage Fracture 3302.10 3302.20 0
2015-02-10 Multi-Stage Fracture 3233.00 3233.10 0
2015-02-10 Multi-Stage Fracture 3177.30 3177.40 0
2015-02-10 Multi-Stage Fracture 3108.20 3108.30 0
2015-02-10 Multi-Stage Fracture 3052.50 3052.60 0
2015-02-10 Multi-Stage Fracture 2983.70 2983.80 0
2015-02-10 Multi-Stage Fracture 4427.70 4432.00 0
2015-02-10 Multi-Stage Fracture 2927.90 2928.00 0
2015-02-10 Multi-Stage Fracture 2872.00 2872.10 0
2015-02-10 Multi-Stage Fracture 2816.30 2816.40 0
2015-02-10 Multi-Stage Fracture 2760.40 2760.50 0
2015-02-10 Multi-Stage Fracture 2704.50 2704.60 0
2015-02-10 Multi-Stage Fracture 2648.90 2649.00 0
2015-02-10 Multi-Stage Fracture 2593.00 2593.10 0
2015-02-10 Multi-Stage Fracture 2537.70 2537.80 0
2015-02-10 Multi-Stage Fracture 2468.40 2468.50 0
2015-02-10 Multi-Stage Fracture 2412.70 2412.80 0
2015-02-10 Multi-Stage Fracture 4398.60 4398.70 0
2015-02-10 Multi-Stage Fracture 2356.90 2357.00 0
2015-02-10 Multi-Stage Fracture 2287.80 2287.90 0
2015-02-10 Multi-Stage Fracture 4315.90 4316.00 0
2015-02-10 Multi-Stage Fracture 4260.10 4260.20 0
2015-02-10 Multi-Stage Fracture 4191.00 4191.10 0
2015-02-10 Multi-Stage Fracture 3867.20 3867.30 0
2015-02-10 Multi-Stage Fracture 3798.00 3798.10 0
2015-02-10 Multi-Stage Fracture 3608.00 3608.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-10 2015-02-10 1,977 3,675 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.6923 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.3275 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.5762 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0127 N/A
Water 7732-18-5 100 0.0137 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.077 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0873 N/A
Ethoxylated phenolic resin 8300 100 0.0893 N/A
Isobutyl ketone 8300 100 0.0877 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1105 N/A
Organic acid salts 1 8300 100 0.0873 N/A
Organic acid salts 2 8300 100 0.0886 N/A
Organic acid salts 3 8300 100 0.0893 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.5147 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0906 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-08 2015-02-11 Groundwater - Non-saline less than or equal to 150m deep 4103

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6097 0.0 0.0 0.0
2016 8259 0.0 0.0 0.0
2017 8065 0.0 0.0 0.0
2018 8206 0.0 0.0 0.0
2019 8353 0.0 0.0 0.0
2020 2126 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-17 No Incident Encountered 0.00 0.00
2015-02-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References