X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625203503003

Well Details

Well ID: 0625203503003
Loading map...
Location: 00/03-35-062-20W5/3
Location Alias: 00/03-35-62-20 W5M
Location Alias 2: 00/03-35-062-20 W5/03
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: 1976082 KAYBOBS 6-35-62-20
Operator Name: Razor Energy Corp.
License Number: 0041149
License Date: 1971-10-26
License Status: Suspension
Spud Date: 2000-02-14
Final Drill Date: 2000-03-11
Well Total Depth: 2364.00 m
Surface Hole Latitude: 54.403585
Surface Hole Longitude: -116.894290

For data sources see[1][2]

Well History

Date Event
1971-10-26 Obtained License
2000-02-17 Direction Drilling Operation Performed - Horizontal
2000-02-27 Liner Casing Operation Performed
2000-03-02 Direction Drilling Operation Performed - Horizontal
2000-03-11 Finished Drilling
2000-03-11 Perforation Treatment Performed - Open-Hole Completion
2000-03-12 Rig Released
2000-03-12 Well Mode changed to Drilled and Cased
2000-03-18 Well Began Production
2000-03-18 Well Fluid changed to Crude Oil
2000-03-18 Well Mode changed to Pumping
2000-06-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-01 Well Fluid changed to Crude Oil
2002-10-01 Well Mode changed to Suspended
2012-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-06 Plug Back Performed
2012-01-06 Well Fluid changed to Crude Oil
2012-01-06 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-02-17 1901.60 Horizontal
2000-03-02 2111.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-11 Open Hole/Barefoot Completion 2110.50 2364.00 0
2000-06-09 Hydra Jet Perforation 2356.50 2364.00 0
2000-06-09 Hydra Jet Perforation 2236.50 2243.00 0
2000-06-14 Acid Treatment 2150.00 2230.00 0
2000-06-16 Acid Treatment 2300.00 2364.00 0
2012-01-06 Packing Device Capped w/Cement 2040.00 2056.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1234 0.0 0.0 0.0

For data sources see[6]

References