X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625202912002

Well Details

Well ID: 0625202912002
Loading map...
Location: 00/12-29-062-20W5/2
Location Alias: 00/12-29-62-20 W5M
Location Alias 2: 00/12-29-062-20 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL KAYBOBS 12-29-62-20
Operator Name: Paramount Resources Ltd.
License Number: 0023734
License Date: 1963-01-30
License Status: Issued
Spud Date: 1963-01-31
Final Drill Date: 1963-02-14
Well Total Depth: 2133.60 m
Surface Hole Latitude: 54.394099
Surface Hole Longitude: -116.973107

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-30 Obtained License
1963-02-14 Finished Drilling
1963-02-14 Well Mode changed to Drilled and Cased
1963-02-16 Production Casing Operation Performed
1963-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-17 Perforation Treatment Performed - Jet Perforation
1985-03-28 Perforation Treatment Performed - Jet Perforation
1985-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-01 Plug Back Performed
1998-07-03 Perforation Treatment Performed - Jet Perforation
1998-07-04 Perforation Treatment Performed - Fractured
1998-09-01 Well Began Production
1998-09-01 Well Fluid changed to Gas
1998-09-01 Well Mode changed to Flowing
2004-08-25 Well Fluid changed to Gas
2004-08-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-17 Perforation 2104.90 2110.10 7
1998-07-03 Perforation 1706.20 1709.20 20
1998-07-04 Fracture 1706.20 1709.20 0
1963-02-17 Perforation 2111.00 2112.30 7
1963-02-17 Acid Treatment 2104.90 2112.30 0
1985-03-28 Perforation 2111.00 2112.80 13
1985-03-28 Perforation 2109.20 2109.80 13
1985-03-28 Perforation 2106.80 2107.20 13
1985-03-28 Perforation 2104.30 2105.80 13
1985-03-29 Acid Treatment 2104.30 2112.80 0
1998-07-01 Packing Device Capped w/Cement 2092.00 2100.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2921 0.0 0.0 0.0
1999 8620 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8662 0.0 0.0 0.0
2003 8331 0.0 0.0 0.0
2004 8445 0.0 0.0 0.0
2005 8082 0.0 0.0 0.0
2006 8687 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 7653 0.0 0.0 0.0
2010 8687 0.0 0.0 0.0
2011 8352 0.0 0.0 0.0
2012 8757 0.0 0.0 0.0
2013 7979 0.0 0.0 0.0
2014 8413 0.0 0.0 0.0
2015 8163 0.0 0.0 0.0
2016 8471 0.0 0.0 0.0
2017 8137 0.0 0.0 0.0
2018 8173 0.0 0.0 0.0
2019 8326 0.0 0.0 0.0
2020 1915 0.0 0.0 0.0

For data sources see[5]

References