X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201616020

Well Details

Well ID: 0625201616020
Loading map...
Location: 02/16-16-062-20W5/0
Location Alias: 02/16-16-62-20 W5M
Location Alias 2: 02/16-16-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 102 HZ KAYBOBS 16-16-62-20
Operator Name: Chevron Canada Limited
License Number: 0487752
License Date: 2018-01-22
License Status: Issued
Spud Date: 2018-08-03
Final Drill Date: 2018-09-26
Well Total Depth: 6775.00 m
Surface Hole Latitude: 54.362627
Surface Hole Longitude: -116.979498

For data sources see[1][2]

Well History

Date Event
2018-01-22 Obtained License
2018-08-03 Lost Circulation Occurred
2018-08-04 Lost Circulation Occurred
2018-08-05 Direction Drilling Operation Performed - Deviate
2018-08-06 Surface Casing Operation Performed
2018-08-19 Intermediate Casing Operation Performed
2018-09-13 Well Log Performed
2018-09-20 Direction Drilling Operation Performed - Horizontal
2018-09-25 Lost Circulation Occurred
2018-09-26 Finished Drilling
2018-09-26 Well Mode changed to Drilled and Cased
2018-09-27 Well Log Performed
2018-09-29 Production Casing Operation Performed
2018-09-30 Rig Released
2018-09-30 Well Log Performed
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-02 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Perforation Treatment Performed - Jet Perforation
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-11 Perforation Treatment Performed - Jet Perforation
2019-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-15 Perforation Treatment Performed - Jet Perforation
2019-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-19 Perforation Treatment Performed - Jet Perforation
2019-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-20 Perforation Treatment Performed - Jet Perforation
2019-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-23 Perforation Treatment Performed - Jet Perforation
2019-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-27 Perforation Treatment Performed - Jet Perforation
2019-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-28 Perforation Treatment Performed - Jet Perforation
2019-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-03 Perforation Treatment Performed - Jet Perforation
2019-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Perforation Treatment Performed - Jet Perforation
2019-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Perforation Treatment Performed - Jet Perforation
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Jet Perforation
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-16 Well Began Production
2019-06-16 Well Fluid changed to Shale Gas Only
2019-06-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-03 Ensign Drilling Inc. 144 N/A Set Surface
2018-08-14 Ensign Drilling Inc. 144 N/A Resumption
2018-09-17 Ensign Drilling Inc. 144 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-05 280.10 Deviate (5 - 79 degrees)
2018-09-20 3417.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-12 Perforation 6678.00 6680.00 1
2019-01-22 Perforation 6543.80 6544.30 10
2019-02-09 Perforation 5409.80 5410.30 12
2019-02-09 Perforation 5394.90 5395.40 12
2019-02-09 Perforation 5380.00 5380.50 10
2019-02-09 Perforation 5365.00 5365.50 8
2019-02-09 Perforation 5350.10 5350.60 8
2019-02-11 Multi-Stage Fracture 5350.10 5425.10 0
2019-02-11 Perforation 5335.10 5335.60 16
2019-02-11 Perforation 5320.30 5320.80 12
2019-02-11 Perforation 5305.40 5305.90 12
2019-02-11 Perforation 5290.40 5290.90 10
2019-01-22 Perforation 6528.80 6529.30 8
2019-02-11 Perforation 5275.50 5276.00 8
2019-02-11 Perforation 5260.60 5261.10 8
2019-02-12 Multi-Stage Fracture 5260.60 5335.60 0
2019-02-12 Perforation 5245.60 5246.10 16
2019-02-12 Perforation 5230.80 5231.30 12
2019-02-12 Perforation 5215.80 5216.30 12
2019-02-12 Perforation 5200.90 5201.40 10
2019-02-12 Perforation 5186.00 5186.50 8
2019-02-12 Perforation 5171.10 5171.60 8
2019-02-12 Multi-Stage Fracture 5171.10 5246.10 0
2019-01-22 Perforation 6513.90 6514.40 8
2019-02-13 Perforation 5156.10 5156.60 16
2019-02-13 Perforation 5141.20 5141.70 12
2019-02-13 Perforation 5126.30 5126.80 12
2019-02-13 Perforation 5111.40 5111.90 10
2019-02-13 Perforation 5096.50 5097.00 8
2019-02-13 Perforation 5081.60 5082.10 8
2019-02-13 Multi-Stage Fracture 5081.60 5156.60 0
2019-02-13 Perforation 5066.60 5067.10 16
2019-02-13 Perforation 5051.70 5052.20 12
2019-02-13 Perforation 5036.80 5037.30 12
2019-01-22 Multi-Stage Fracture 6603.00 6680.00 0
2019-02-13 Perforation 5021.90 5022.40 10
2019-02-13 Perforation 5007.00 5007.50 8
2019-02-13 Perforation 4992.00 4992.50 8
2019-02-14 Perforation 4977.00 4977.50 16
2019-02-14 Perforation 4962.20 4962.70 12
2019-02-14 Perforation 4947.30 4947.80 12
2019-02-14 Perforation 4932.40 4932.90 10
2019-02-14 Perforation 4917.40 4917.90 8
2019-02-14 Perforation 4902.50 4903.00 8
2019-02-14 Multi-Stage Fracture 4992.00 5067.10 0
2019-01-24 Perforation 6498.90 6499.40 16
2019-02-15 Perforation 4887.50 4888.00 16
2019-02-15 Multi-Stage Fracture 4902.50 4977.50 0
2019-02-15 Perforation 4872.70 4873.20 12
2019-02-15 Perforation 4857.80 4858.30 12
2019-02-15 Perforation 4842.80 4843.30 10
2019-02-15 Perforation 4827.90 4828.40 8
2019-02-15 Perforation 4814.00 4814.50 8
2019-02-19 Multi-Stage Fracture 4814.00 4888.00 0
2019-02-19 Perforation 4798.00 4798.50 16
2019-02-19 Perforation 4783.20 4783.70 12
2019-01-24 Multi-Stage Fracture 6513.90 6588.90 0
2019-02-19 Perforation 4768.20 4768.70 12
2019-02-19 Perforation 4753.30 4753.80 10
2019-02-19 Perforation 4738.40 4738.90 8
2019-02-19 Perforation 4723.50 4724.00 8
2019-02-20 Multi-Stage Fracture 4723.50 4798.50 0
2019-02-20 Perforation 4708.50 4709.00 16
2019-02-20 Perforation 4693.60 4694.10 12
2019-02-20 Perforation 4678.70 4679.20 12
2019-02-20 Perforation 4663.80 4664.30 10
2019-02-20 Perforation 4648.90 4649.40 8
2019-01-24 Perforation 6484.00 6484.50 12
2019-02-20 Perforation 4634.00 4634.50 8
2019-02-21 Multi-Stage Fracture 4634.00 4709.00 0
2019-02-21 Perforation 4619.00 4619.50 16
2019-02-21 Perforation 4604.10 4604.60 12
2019-02-21 Perforation 4589.20 4589.70 12
2019-02-21 Perforation 4574.30 4574.80 10
2019-02-21 Perforation 4559.40 4559.90 8
2019-02-21 Perforation 4544.40 4544.90 8
2019-02-22 Multi-Stage Fracture 4544.40 4619.50 0
2019-02-22 Perforation 4529.40 4529.90 16
2019-01-24 Perforation 6469.10 6469.60 12
2019-02-22 Perforation 4514.60 4515.10 12
2019-02-22 Perforation 4499.70 4500.20 12
2019-02-22 Perforation 4484.80 4485.30 10
2019-02-22 Perforation 4469.80 4470.30 8
2019-02-22 Perforation 4454.90 4455.40 8
2019-02-23 Multi-Stage Fracture 4454.90 4529.90 0
2019-02-23 Perforation 4439.90 4440.40 16
2019-02-23 Perforation 4425.10 4425.60 12
2019-02-23 Perforation 4410.20 4410.70 12
2019-02-23 Perforation 4395.20 4395.70 10
2019-01-24 Perforation 6454.20 6454.70 10
2019-02-23 Perforation 4380.30 4380.80 8
2019-02-23 Perforation 4365.40 4365.90 8
2019-02-24 Perforation 4350.40 4350.90 16
2019-02-24 Perforation 4335.60 4336.10 12
2019-02-24 Perforation 4320.60 4321.10 12
2019-02-24 Perforation 4305.70 4306.20 10
2019-02-24 Perforation 4290.80 4291.30 8
2019-02-24 Perforation 4275.90 4276.40 8
2019-02-24 Multi-Stage Fracture 4365.40 4440.40 0
2019-02-26 Perforation 4260.90 4261.40 16
2019-01-24 Perforation 6439.30 6439.80 8
2019-02-26 Multi-Stage Fracture 4275.90 4350.90 0
2019-02-26 Perforation 4246.00 4246.50 12
2019-02-26 Perforation 4231.10 4231.60 12
2019-02-26 Perforation 4216.20 4216.70 10
2019-02-26 Perforation 4201.30 4201.80 8
2019-02-26 Perforation 4186.40 4186.90 8
2019-02-27 Multi-Stage Fracture 4186.40 4261.40 0
2019-02-27 Perforation 4171.40 4171.90 16
2019-02-27 Perforation 4156.50 4157.00 12
2019-02-27 Perforation 4141.60 4142.10 12
2019-01-17 Perforation 6663.00 6663.50 12
2019-01-24 Perforation 6424.40 6424.90 8
2019-02-27 Perforation 4126.70 4127.20 10
2019-02-27 Perforation 4111.80 4112.30 8
2019-02-27 Perforation 4096.80 4097.30 8
2019-02-28 Multi-Stage Fracture 4096.80 4171.90 0
2019-02-28 Perforation 4081.80 4082.30 16
2019-02-28 Perforation 4067.00 4067.50 12
2019-02-28 Perforation 4052.10 4052.60 12
2019-02-28 Perforation 4037.20 4037.70 10
2019-02-28 Perforation 4022.20 4022.70 8
2019-02-28 Perforation 4007.30 4007.80 8
2019-01-24 Multi-Stage Fracture 6424.40 6499.40 0
2019-03-01 Multi-Stage Fracture 4007.30 4082.30 0
2019-03-01 Perforation 3992.40 3992.90 16
2019-03-01 Perforation 3977.50 3978.00 12
2019-03-01 Perforation 3962.60 3963.10 12
2019-03-01 Perforation 3947.70 3948.20 10
2019-03-01 Perforation 3932.80 3933.30 8
2019-03-01 Perforation 3917.80 3918.30 8
2019-03-03 Multi-Stage Fracture 3917.80 3992.90 0
2019-03-03 Perforation 3902.80 3903.30 16
2019-03-03 Perforation 3888.00 3888.50 12
2019-01-25 Perforation 6409.40 6409.90 16
2019-03-03 Perforation 3873.00 3873.50 12
2019-03-03 Perforation 3858.10 3858.60 10
2019-03-03 Perforation 3843.20 3843.70 8
2019-03-03 Perforation 3828.30 3828.80 8
2019-03-04 Multi-Stage Fracture 3828.30 3903.30 0
2019-03-04 Perforation 3813.30 3813.80 16
2019-03-04 Perforation 3798.40 3798.90 12
2019-03-04 Perforation 3783.50 3784.00 12
2019-03-04 Perforation 3768.60 3769.10 10
2019-03-04 Perforation 3753.70 3754.20 8
2019-01-25 Perforation 6394.50 6395.00 12
2019-03-04 Perforation 3738.80 3739.30 8
2019-03-05 Multi-Stage Fracture 3738.80 3813.80 0
2019-03-05 Perforation 3723.80 3724.30 16
2019-03-05 Perforation 3708.90 3709.40 12
2019-03-05 Perforation 3694.00 3694.50 12
2019-03-05 Perforation 3679.10 3679.60 10
2019-03-05 Perforation 3664.20 3664.70 8
2019-03-05 Perforation 3649.20 3649.70 8
2019-03-06 Multi-Stage Fracture 3649.20 3724.30 0
2019-03-06 Perforation 3634.20 3634.70 16
2019-01-25 Perforation 6379.60 6380.10 12
2019-03-06 Perforation 3619.40 3619.90 12
2019-03-06 Perforation 3604.50 3605.00 12
2019-03-06 Perforation 3589.60 3590.10 10
2019-03-06 Perforation 3574.60 3575.10 8
2019-03-06 Perforation 3559.70 3560.20 8
2019-03-06 Multi-Stage Fracture 3559.70 3634.70 0
2019-03-07 Perforation 3544.70 3545.20 16
2019-03-07 Perforation 3529.90 3530.40 12
2019-03-07 Perforation 3515.00 3515.50 12
2019-03-07 Perforation 3500.00 3500.50 10
2019-01-25 Perforation 6364.70 6365.20 10
2019-03-07 Perforation 3485.10 3485.60 8
2019-03-07 Perforation 3470.20 3470.70 8
2019-03-07 Multi-Stage Fracture 3470.20 3545.20 0
2019-03-07 Perforation 3455.20 3455.70 16
2019-03-07 Perforation 3440.40 3440.90 12
2019-03-07 Perforation 3425.40 3425.90 12
2019-03-07 Perforation 3410.50 3411.00 10
2019-03-07 Perforation 3395.70 3396.20 8
2019-03-07 Perforation 3380.70 3381.20 8
2019-03-08 Multi-Stage Fracture 3380.70 3455.70 0
2019-01-25 Perforation 6349.80 6350.30 8
2019-01-25 Perforation 6334.80 6335.30 8
2019-01-27 Multi-Stage Fracture 6334.80 6409.90 0
2019-01-27 Perforation 6319.80 6320.30 16
2019-01-17 Perforation 6648.00 6648.50 12
2019-01-27 Perforation 6305.00 6305.50 12
2019-01-27 Perforation 6290.10 6290.60 12
2019-01-27 Perforation 6275.20 6275.70 10
2019-01-27 Perforation 6260.20 6260.70 8
2019-01-27 Perforation 6245.30 6245.80 8
2019-01-28 Multi-Stage Fracture 6245.30 6320.30 0
2019-01-28 Perforation 6230.30 6230.80 16
2019-01-28 Perforation 6215.50 6216.00 12
2019-01-28 Perforation 6200.60 6201.10 12
2019-01-28 Perforation 6185.60 6186.10 10
2019-01-17 Perforation 6633.00 6633.50 12
2019-01-28 Perforation 6170.70 6171.20 8
2019-01-28 Perforation 6155.80 6156.30 8
2019-01-29 Multi-Stage Fracture 6155.80 6230.80 0
2019-01-30 Perforation 6140.80 6141.30 8
2019-01-30 Perforation 6126.00 6126.50 8
2019-01-30 Perforation 6111.00 6111.50 10
2019-01-30 Perforation 6096.10 6096.60 12
2019-01-30 Perforation 6081.20 6081.70 12
2019-01-30 Perforation 6066.30 6066.80 16
2019-01-31 Multi-Stage Fracture 6066.30 6141.30 0
2019-01-17 Perforation 6618.00 6618.50 12
2019-01-31 Perforation 6051.30 6051.80 16
2019-01-31 Perforation 6036.40 6036.90 12
2019-01-31 Perforation 6021.50 6022.00 12
2019-01-31 Perforation 6006.60 6007.10 10
2019-01-31 Perforation 5991.70 5992.20 8
2019-01-31 Perforation 5976.80 5977.30 8
2019-02-01 Multi-Stage Fracture 5976.80 6051.80 0
2019-02-02 Perforation 5961.80 5962.30 16
2019-02-02 Perforation 5946.90 5947.40 12
2019-02-02 Perforation 5932.00 5932.50 12
2019-01-17 Perforation 6603.00 6603.50 12
2019-02-02 Perforation 5917.10 5917.60 10
2019-02-02 Perforation 5902.20 5902.70 8
2019-02-02 Perforation 5887.20 5887.70 8
2019-02-02 Multi-Stage Fracture 5887.20 5962.30 0
2019-02-03 Perforation 5872.20 5872.70 16
2019-02-03 Perforation 5857.40 5857.90 12
2019-02-03 Perforation 5842.50 5843.00 12
2019-02-03 Perforation 5827.60 5828.10 10
2019-02-03 Perforation 5812.60 5813.10 8
2019-02-03 Perforation 5797.70 5798.20 8
2019-01-22 Perforation 6588.40 6588.90 16
2019-02-04 Multi-Stage Fracture 5797.70 5872.70 0
2019-02-04 Perforation 5782.70 5783.20 16
2019-02-04 Perforation 5767.90 5768.40 12
2019-02-04 Perforation 5753.00 5753.50 12
2019-02-04 Perforation 5738.00 5738.50 10
2019-02-04 Perforation 5723.10 5723.60 8
2019-02-04 Perforation 5708.20 5708.70 8
2019-02-05 Multi-Stage Fracture 5708.20 5783.20 0
2019-02-05 Perforation 5693.20 5693.70 16
2019-02-05 Perforation 5678.40 5678.90 12
2019-01-22 Perforation 6573.60 6574.10 12
2019-02-05 Perforation 5663.40 5663.90 12
2019-02-05 Perforation 5648.50 5649.00 10
2019-02-05 Perforation 5633.60 5634.10 8
2019-02-05 Perforation 5618.70 5619.20 8
2019-02-06 Multi-Stage Fracture 5618.70 5693.70 0
2019-02-06 Perforation 5603.70 5604.20 16
2019-02-06 Perforation 5588.80 5589.30 12
2019-02-06 Perforation 5573.90 5574.40 12
2019-02-06 Perforation 5559.00 5559.50 10
2019-02-06 Perforation 5544.10 5544.60 8
2019-01-22 Perforation 6558.70 6559.20 12
2019-02-06 Perforation 5529.20 5529.70 8
2019-02-07 Multi-Stage Fracture 5529.20 5604.20 0
2019-02-07 Perforation 5514.20 5514.70 16
2019-02-07 Perforation 5499.30 5499.80 12
2019-02-07 Perforation 5484.40 5484.90 12
2019-02-07 Perforation 5469.50 5470.00 10
2019-02-07 Perforation 5454.60 5455.10 8
2019-02-07 Perforation 5439.60 5440.10 8
2019-02-09 Multi-Stage Fracture 5439.60 5514.70 0
2019-02-09 Perforation 5424.60 5425.10 16

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-22 2019-03-08 3,205 102,656 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.4791 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.4749 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7212 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.0885 N/A
Water 7732-18-5 100 0.0885 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.008 N/A
Dibromoacetonitrile 3252-43-5 100 0.008 N/A
Polyethylene Glycol 25322-68-3 100 0.008 N/A
Sodium Bromide 7647-15-6 100 0.008 N/A
Water 7732-18-5 100 0.008 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0321 N/A
Methanol 67-56-1 100 0.0321 N/A
Non-hazardous Not Available 100 0.0321 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.001 N/A
1-decanol 112-30-1 100 0.001 N/A
1-octanol 111-87-5 100 0.001 N/A
2-butoxy ethanol 111-76-2 100 0.001 N/A
2-propanol 67-63-0 100 0.001 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.001 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.001 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.001 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.001 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0007 N/A
Isopropanol 67-63-0 100 0.0007 N/A
Methanol 67-56-1 100 0.0007 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1455 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1455 N/A
Lecitihins. soya 8030-76-0 100 0.1455 N/A
polymer Trade Secret 100 0.1455 N/A
Water 7732-18-5 100 0.1455 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0015 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0219 N/A
Water 7732-18-5 100 0.0219 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-03-31 Groundwater - Non-saline less than or equal to 150m deep 3119
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1028
2019-01-18 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 7170
2019-01-21 2019-03-31 Groundwater - Non-saline less than or equal to 150m deep 1881
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 8735
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 9361
2019-02-20 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1931
2019-02-07 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1487
2019-01-21 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 2369
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 6107
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 1261
2019-02-10 2019-03-06 Groundwater - Non-saline less than or equal to 150m deep 3438
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 3276
2019-01-20 2019-03-13 Surface Water - River 25390
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1008
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 14294

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 891 0.0 0.0 0.0
2020 1578 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-03 Lost Circulation 40.00 166.00
2018-08-04 Lost Circulation 57.00 166.00
2018-08-04 Lost Circulation 70.00 456.00
2018-09-25 Lost Circulation 6093.00 6093.00
2019-03-13 No Incident Encountered 0.00 0.00
2019-04-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References