X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201609000

Well Details

Well ID: 0625201609000
Loading map...
Location: 00/09-16-062-20W5/0
Location Alias: 00/09-16-62-20 W5M
Location Alias 2: 00/09-16-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ KAYBOBS 9-16-62-20
Operator Name: Chevron Canada Limited
License Number: 0487753
License Date: 2018-01-22
License Status: Issued
Spud Date: 2018-08-06
Final Drill Date: 2018-10-08
Well Total Depth: 7083.00 m
Surface Hole Latitude: 54.362569
Surface Hole Longitude: -116.979554

For data sources see[1][2]

Well History

Date Event
2018-01-22 Obtained License
2018-08-06 Lost Circulation Occurred
2018-08-07 Direction Drilling Operation Performed - Deviate
2018-08-07 Surface Casing Operation Performed
2018-08-24 Intermediate Casing Operation Performed
2018-08-24 Lost Circulation Occurred
2018-10-04 Direction Drilling Operation Performed - Horizontal
2018-10-08 Finished Drilling
2018-10-08 Well Log Performed
2018-10-08 Well Mode changed to Drilled and Cased
2018-10-10 Production Casing Operation Performed
2018-10-11 Rig Released
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Jet Perforation
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-02 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-04 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Perforation Treatment Performed - Jet Perforation
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-11 Perforation Treatment Performed - Jet Perforation
2019-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-15 Perforation Treatment Performed - Jet Perforation
2019-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-16 Perforation Treatment Performed - Jet Perforation
2019-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-19 Perforation Treatment Performed - Jet Perforation
2019-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-20 Perforation Treatment Performed - Jet Perforation
2019-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-23 Perforation Treatment Performed - Jet Perforation
2019-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-27 Perforation Treatment Performed - Jet Perforation
2019-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-02 Perforation Treatment Performed - Jet Perforation
2019-03-03 Perforation Treatment Performed - Jet Perforation
2019-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Perforation Treatment Performed - Jet Perforation
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Jet Perforation
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Jet Perforation
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-25 Well Began Production
2019-05-25 Well Fluid changed to Shale Gas Only
2019-05-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-10-02 Ensign Drilling Inc. 144 N/A Drill To LD
2018-08-06 Ensign Drilling Inc. 144 N/A Set Surface
2018-08-20 Ensign Drilling Inc. 144 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-07 247.70 Deviate (5 - 79 degrees)
2018-10-04 3423.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-12 Perforation 7014.00 7016.00 1
2019-01-22 Perforation 6892.80 6893.30 12
2019-02-09 Perforation 5726.30 5726.80 12
2019-02-09 Perforation 5711.10 5711.60 12
2019-02-09 Perforation 5696.00 5696.50 10
2019-02-09 Perforation 5680.80 5681.30 8
2019-02-09 Perforation 5665.70 5666.20 8
2019-02-11 Multi-Stage Fracture 5665.70 5742.10 0
2019-02-11 Perforation 5650.70 5651.20 16
2019-02-11 Perforation 5635.40 5635.90 12
2019-02-11 Perforation 5620.20 5620.70 12
2019-02-11 Perforation 5605.10 5605.60 10
2019-01-22 Perforation 6877.70 6878.20 10
2019-02-11 Perforation 5589.90 5590.40 8
2019-02-11 Perforation 5574.80 5575.30 8
2019-02-12 Multi-Stage Fracture 5574.80 5651.20 0
2019-02-12 Perforation 5559.80 5560.30 16
2019-02-12 Perforation 5544.50 5545.00 12
2019-02-12 Perforation 5529.30 5529.80 12
2019-02-12 Perforation 5514.20 5514.70 10
2019-02-12 Perforation 5499.00 5499.50 8
2019-02-12 Perforation 5483.90 5484.40 8
2019-02-13 Multi-Stage Fracture 5483.90 5560.30 0
2019-01-22 Perforation 6862.50 6863.00 8
2019-02-13 Perforation 5468.90 5469.40 16
2019-02-13 Perforation 5453.60 5454.10 12
2019-02-13 Perforation 5438.40 5438.90 12
2019-02-13 Perforation 5423.30 5423.80 10
2019-02-13 Perforation 5408.10 5408.60 8
2019-02-13 Perforation 5393.00 5393.50 8
2019-02-14 Multi-Stage Fracture 5393.00 5469.40 0
2019-02-14 Perforation 5378.00 5378.50 16
2019-02-14 Perforation 5362.70 5363.20 12
2019-02-14 Perforation 5347.50 5348.00 12
2019-01-22 Perforation 6847.40 6847.90 8
2019-02-14 Perforation 5332.40 5332.90 10
2019-02-14 Perforation 5317.20 5317.70 8
2019-02-14 Perforation 5302.10 5302.60 8
2019-02-15 Multi-Stage Fracture 5302.10 5378.50 0
2019-02-15 Perforation 5287.10 5287.60 16
2019-02-15 Perforation 5271.80 5272.30 12
2019-02-15 Perforation 5256.60 5257.10 12
2019-02-15 Perforation 5241.50 5242.00 10
2019-02-15 Perforation 5226.30 5226.80 8
2019-02-15 Perforation 5211.20 5211.70 8
2019-01-22 Multi-Stage Fracture 6847.40 6923.80 0
2019-02-16 Multi-Stage Fracture 5211.20 5287.60 0
2019-02-16 Perforation 5196.20 5196.70 16
2019-02-16 Perforation 5180.90 5181.40 12
2019-02-16 Perforation 5165.70 5166.20 12
2019-02-16 Perforation 5150.60 5151.10 10
2019-02-16 Perforation 5135.40 5135.90 8
2019-02-16 Perforation 5120.30 5120.80 8
2019-02-16 Multi-Stage Fracture 5120.30 5196.70 0
2019-02-16 Perforation 5105.30 5105.80 16
2019-02-16 Perforation 5090.00 5090.50 12
2019-01-24 Perforation 6832.40 6832.90 16
2019-02-16 Perforation 5074.80 5075.30 12
2019-02-16 Perforation 5059.70 5060.20 10
2019-02-16 Perforation 5044.50 5045.00 8
2019-02-16 Perforation 5029.40 5029.90 8
2019-02-17 Multi-Stage Fracture 5029.40 5105.80 0
2019-02-18 Perforation 5014.40 5014.90 16
2019-02-18 Perforation 4999.10 4999.60 12
2019-02-18 Perforation 4983.90 4984.40 12
2019-02-18 Perforation 4968.80 4969.30 10
2019-02-18 Perforation 4953.60 4954.10 8
2019-01-24 Perforation 6817.10 6817.60 12
2019-02-18 Perforation 4938.50 4939.00 8
2019-02-18 Multi-Stage Fracture 4938.50 5014.90 0
2019-02-18 Perforation 4923.50 4924.00 16
2019-02-18 Perforation 4908.20 4908.70 12
2019-02-18 Perforation 4893.00 4893.50 12
2019-02-18 Perforation 4877.90 4878.40 10
2019-02-18 Perforation 4862.70 4863.20 8
2019-02-18 Perforation 4847.60 4848.10 8
2019-02-19 Multi-Stage Fracture 4847.60 4924.00 0
2019-02-19 Perforation 4832.60 4833.10 16
2019-01-24 Perforation 6801.90 6802.40 12
2019-02-19 Perforation 4817.30 4817.80 12
2019-02-19 Perforation 4802.10 4802.60 12
2019-02-19 Perforation 4787.00 4787.50 10
2019-02-19 Perforation 4771.80 4772.30 8
2019-02-19 Perforation 4756.70 4757.20 8
2019-02-20 Multi-Stage Fracture 4756.70 4833.10 0
2019-02-20 Perforation 4741.70 4742.20 16
2019-02-20 Perforation 4726.40 4726.90 12
2019-02-20 Perforation 4711.20 4711.70 12
2019-02-20 Perforation 4696.10 4696.60 10
2019-01-24 Perforation 6786.80 6787.30 10
2019-02-20 Perforation 4680.90 4681.40 8
2019-02-20 Perforation 4665.80 4666.30 8
2019-02-21 Multi-Stage Fracture 4665.80 4742.20 0
2019-02-21 Perforation 4650.80 4651.30 16
2019-02-21 Perforation 4635.50 4636.00 12
2019-02-21 Perforation 4620.30 4620.80 12
2019-02-21 Perforation 4605.20 4605.70 10
2019-02-21 Perforation 4590.00 4590.50 8
2019-02-21 Perforation 4574.90 4575.40 8
2019-02-22 Multi-Stage Fracture 4574.90 4651.30 0
2019-01-24 Perforation 6771.60 6772.10 8
2019-02-23 Perforation 4559.90 4560.40 16
2019-02-23 Perforation 4544.60 4545.10 12
2019-02-23 Perforation 4529.40 4529.90 12
2019-02-23 Perforation 4514.30 4514.80 10
2019-02-23 Perforation 4499.10 4499.60 8
2019-02-23 Perforation 4484.00 4484.50 8
2019-02-23 Multi-Stage Fracture 4484.00 4560.40 0
2019-02-24 Perforation 4469.00 4469.50 16
2019-02-24 Perforation 4453.70 4454.20 12
2019-02-24 Perforation 4438.50 4439.00 12
2019-01-17 Perforation 6938.30 6938.80 12
2019-01-24 Perforation 6756.50 6757.00 8
2019-02-24 Perforation 4423.20 4423.70 10
2019-02-24 Perforation 4408.20 4408.70 8
2019-02-24 Perforation 4393.10 4393.60 8
2019-02-26 Multi-Stage Fracture 4393.10 4469.50 0
2019-02-26 Perforation 4378.10 4378.60 16
2019-02-26 Perforation 4362.80 4363.30 12
2019-02-26 Perforation 4347.60 4348.10 12
2019-02-26 Perforation 4332.50 4333.00 10
2019-02-26 Perforation 4317.30 4317.80 8
2019-02-26 Perforation 4302.20 4302.70 8
2019-01-24 Multi-Stage Fracture 6756.50 6832.90 0
2019-02-27 Multi-Stage Fracture 4302.20 4378.60 0
2019-02-27 Perforation 4287.20 4287.70 16
2019-02-27 Perforation 4271.90 4272.40 12
2019-02-27 Perforation 4256.70 4257.20 12
2019-02-27 Perforation 4241.60 4242.10 10
2019-02-27 Perforation 4226.40 4226.90 8
2019-02-27 Perforation 4211.30 4211.80 8
2019-02-28 Multi-Stage Fracture 4211.30 4287.70 0
2019-03-01 Perforation 4196.30 4196.80 16
2019-03-01 Perforation 4181.00 4181.50 12
2019-01-25 Perforation 6741.50 6742.00 16
2019-03-01 Perforation 4165.80 4166.30 12
2019-03-01 Perforation 4150.70 4151.20 10
2019-03-01 Perforation 4135.50 4136.00 8
2019-03-01 Perforation 4120.40 4120.90 8
2019-03-01 Multi-Stage Fracture 4120.40 4196.80 0
2019-03-02 Perforation 4105.40 4105.90 16
2019-03-02 Perforation 4090.10 4090.60 12
2019-03-02 Perforation 4074.90 4075.40 12
2019-03-02 Perforation 4059.80 4060.30 10
2019-03-02 Perforation 4044.60 4045.10 8
2019-01-25 Perforation 6726.20 6726.70 12
2019-03-02 Perforation 4029.50 4030.00 8
2019-03-03 Multi-Stage Fracture 4029.50 4105.90 0
2019-03-03 Perforation 4014.50 4015.00 16
2019-03-03 Perforation 3999.20 3999.70 12
2019-03-03 Perforation 3984.00 3984.50 12
2019-03-03 Perforation 3968.90 3969.40 10
2019-03-03 Perforation 3953.70 3954.20 8
2019-03-03 Perforation 3938.60 3939.10 8
2019-03-04 Multi-Stage Fracture 3938.60 4015.00 0
2019-03-05 Perforation 3923.60 3924.10 16
2019-01-25 Perforation 6711.00 6711.50 12
2019-03-05 Perforation 3908.30 3908.80 12
2019-03-05 Perforation 3893.10 3893.60 12
2019-03-05 Perforation 3878.00 3878.50 10
2019-03-05 Perforation 3862.80 3863.30 8
2019-03-05 Perforation 3847.70 3848.20 8
2019-03-05 Multi-Stage Fracture 3847.70 3924.10 0
2019-03-06 Perforation 3832.70 3833.20 16
2019-03-06 Perforation 3817.40 3817.90 12
2019-03-06 Perforation 3802.20 3802.70 12
2019-03-06 Perforation 3787.10 3787.60 10
2019-01-25 Perforation 6695.90 6696.40 10
2019-03-06 Perforation 3771.90 3772.40 8
2019-03-06 Perforation 3756.80 3757.30 8
2019-03-06 Multi-Stage Fracture 3756.80 3833.20 0
2019-03-06 Perforation 3741.80 3742.30 16
2019-03-06 Perforation 3726.50 3727.00 12
2019-03-06 Perforation 3711.30 3711.80 12
2019-03-06 Perforation 3696.20 3696.70 10
2019-03-06 Perforation 3681.00 3681.50 8
2019-03-06 Perforation 3665.90 3666.40 8
2019-03-07 Multi-Stage Fracture 3665.90 3742.30 0
2019-01-25 Perforation 6680.70 6681.20 8
2019-03-07 Perforation 3650.90 3651.40 16
2019-03-07 Perforation 3635.60 3636.10 12
2019-03-07 Perforation 3620.40 3620.90 12
2019-03-07 Perforation 3605.30 3605.80 10
2019-03-07 Perforation 3590.10 3590.60 8
2019-03-07 Perforation 3575.00 3575.50 8
2019-03-08 Multi-Stage Fracture 3575.00 3651.40 0
2019-03-08 Perforation 3560.00 3560.50 16
2019-03-08 Perforation 3544.70 3545.20 12
2019-03-08 Perforation 3529.50 3530.00 12
2019-01-25 Perforation 6665.60 6666.10 8
2019-03-08 Perforation 3514.40 3514.90 10
2019-03-08 Perforation 3499.20 3499.70 8
2019-03-08 Perforation 3484.10 3484.60 8
2019-03-08 Multi-Stage Fracture 3484.10 3560.50 0
2019-03-08 Perforation 3469.10 3469.60 16
2019-03-08 Perforation 3453.80 3454.30 12
2019-03-08 Perforation 3438.60 3439.10 12
2019-03-08 Perforation 3423.50 3424.00 10
2019-03-08 Perforation 3408.30 3408.80 8
2019-03-08 Perforation 3393.20 3393.70 8
2019-01-26 Multi-Stage Fracture 6665.60 6742.00 0
2019-03-09 Multi-Stage Fracture 3393.20 3469.60 0
2019-01-27 Perforation 6650.60 6651.10 16
2019-01-17 Perforation 6953.40 6953.90 12
2019-01-27 Perforation 6635.30 6635.80 12
2019-01-27 Perforation 6620.10 6620.60 12
2019-01-27 Perforation 6605.00 6605.50 10
2019-01-27 Perforation 6589.80 6590.30 8
2019-01-27 Perforation 6574.70 6575.20 8
2019-01-28 Multi-Stage Fracture 6574.70 6651.10 0
2019-01-28 Perforation 6559.70 6560.20 16
2019-01-28 Perforation 6544.40 6544.90 12
2019-01-28 Perforation 6529.20 6529.70 12
2019-01-28 Perforation 6514.10 6514.60 10
2019-01-17 Perforation 6968.60 6969.10 12
2019-01-28 Perforation 6498.90 6499.40 8
2019-01-28 Perforation 6483.80 6484.30 8
2019-01-29 Multi-Stage Fracture 6483.80 6560.20 0
2019-01-29 Perforation 6468.80 6469.30 16
2019-01-29 Perforation 6453.50 6454.00 12
2019-01-29 Perforation 6438.30 6438.80 12
2019-01-29 Perforation 6423.20 6423.70 10
2019-01-29 Perforation 6408.00 6408.50 8
2019-01-29 Perforation 6392.90 6393.40 8
2019-01-30 Perforation 6377.90 6378.40 16
2019-01-17 Perforation 6983.70 6984.20 12
2019-01-30 Perforation 6362.60 6363.10 12
2019-01-30 Perforation 6347.40 6347.90 12
2019-01-30 Perforation 6332.30 6332.80 10
2019-01-30 Perforation 6317.10 6317.60 8
2019-01-30 Perforation 6302.00 6302.50 8
2019-01-30 Multi-Stage Fracture 6392.90 6469.30 0
2019-02-01 Perforation 6287.00 6287.50 16
2019-02-01 Perforation 6271.70 6272.20 12
2019-02-01 Perforation 6256.50 6257.00 12
2019-02-01 Perforation 6241.40 6241.90 10
2019-01-17 Perforation 6996.30 6996.80 12
2019-02-01 Perforation 6226.20 6226.70 8
2019-02-01 Multi-Stage Fracture 6302.00 6378.40 0
2019-02-02 Perforation 6211.10 6211.60 8
2019-02-02 Multi-Stage Fracture 6211.10 6287.50 0
2019-02-02 Perforation 6196.10 6196.60 16
2019-02-02 Perforation 6180.80 6181.30 12
2019-02-02 Perforation 6165.60 6166.10 12
2019-02-02 Perforation 6150.50 6151.00 10
2019-02-02 Perforation 6135.30 6135.80 8
2019-02-02 Perforation 6120.20 6120.70 8
2019-01-22 Multi-Stage Fracture 6938.30 7016.00 0
2019-02-03 Multi-Stage Fracture 6120.20 6196.60 0
2019-02-04 Perforation 6105.20 6105.70 16
2019-02-04 Perforation 6089.90 6090.40 12
2019-02-04 Perforation 6074.70 6075.20 12
2019-02-04 Perforation 6059.60 6060.10 10
2019-02-04 Perforation 6044.40 6044.90 8
2019-02-04 Perforation 6029.30 6029.80 8
2019-02-05 Multi-Stage Fracture 6029.30 6105.70 0
2019-02-05 Perforation 6014.30 6014.80 16
2019-02-05 Perforation 5999.00 5999.50 12
2019-01-22 Perforation 6923.30 6923.80 16
2019-02-05 Perforation 5983.80 5984.30 12
2019-02-05 Perforation 5968.70 5969.20 10
2019-02-05 Perforation 5953.50 5954.00 8
2019-02-05 Perforation 5938.40 5938.90 8
2019-02-06 Multi-Stage Fracture 5938.40 6014.80 0
2019-02-06 Perforation 5923.40 5923.90 16
2019-02-06 Perforation 5908.10 5908.60 12
2019-02-06 Perforation 5892.90 5893.40 12
2019-02-06 Perforation 5877.00 5877.50 10
2019-02-06 Perforation 5862.60 5863.10 8
2019-01-22 Perforation 6908.00 6908.50 12
2019-02-06 Perforation 5847.50 5848.00 8
2019-02-07 Multi-Stage Fracture 5847.50 5923.90 0
2019-02-07 Perforation 5832.50 5833.00 16
2019-02-07 Perforation 5817.20 5817.70 12
2019-02-07 Perforation 5802.00 5802.50 12
2019-02-07 Perforation 5786.90 5787.40 10
2019-02-07 Perforation 5771.70 5772.20 8
2019-02-07 Perforation 5756.60 5757.10 8
2019-02-09 Multi-Stage Fracture 5756.60 5833.00 0
2019-02-09 Perforation 5741.60 5742.10 16

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-22 2019-03-09 3,200 112,010 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.5781 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.3822 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7114 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.0879 N/A
Water 7732-18-5 100 0.0879 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0081 N/A
Dibromoacetonitrile 3252-43-5 100 0.0081 N/A
Polyethylene Glycol 25322-68-3 100 0.0081 N/A
Sodium Bromide 7647-15-6 100 0.0081 N/A
Water 7732-18-5 100 0.0081 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0324 N/A
Methanol 67-56-1 100 0.0324 N/A
Non-hazardous Not Available 100 0.0324 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.001 N/A
1-decanol 112-30-1 100 0.001 N/A
1-octanol 111-87-5 100 0.001 N/A
2-butoxy ethanol 111-76-2 100 0.001 N/A
2-propanol 67-63-0 100 0.001 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.001 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.001 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.001 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.001 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0007 N/A
Isopropanol 67-63-0 100 0.0007 N/A
Methanol 67-56-1 100 0.0007 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1485 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1485 N/A
Lecitihins. soya 8030-76-0 100 0.1485 N/A
polymer Trade Secret 100 0.1485 N/A
Water 7732-18-5 100 0.1485 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0015 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0221 N/A
Water 7732-18-5 100 0.0221 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 3119
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1028
2019-01-18 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 7170
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1881
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 8735
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 9361
2019-02-20 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1931
2019-02-07 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1487
2019-01-21 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 2369
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 6107
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 1261
2019-02-10 2019-03-06 Groundwater - Non-saline less than or equal to 150m deep 3438
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 3276
2019-01-20 2019-03-13 Surface Water - River 25390
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1008
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 23716

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 880 0.0 0.0 0.0
2020 1948 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-06 Lost Circulation 55.00 120.00
2018-08-24 Lost Circulation 700.00 1500.00
2018-08-24 Lost Circulation 2950.00 2950.00
2019-03-15 No Incident Encountered 0.00 0.00
2019-04-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References