X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201601030

Well Details

Well ID: 0625201601030
Loading map...
Location: 03/01-16-062-20W5/0
Location Alias: 03/01-16-62-20 W5M
Location Alias 2: 03/01-16-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 103 HZ KAYBOBS 1-16-62-20
Operator Name: Chevron Canada Limited
License Number: 0487757
License Date: 2018-01-22
License Status: Amended
Spud Date: 2018-08-11
Final Drill Date: 2018-11-06
Well Total Depth: 6408.00 m
Surface Hole Latitude: 54.362399
Surface Hole Longitude: -116.979721

For data sources see[1][2]

Well History

Date Event
2018-01-22 Obtained License
2018-08-11 Direction Drilling Operation Performed - Deviate
2018-08-11 Lost Circulation Occurred
2018-08-11 Surface Casing Operation Performed
2018-09-09 Intermediate Casing Operation Performed
2018-09-09 Lost Circulation Occurred
2018-09-10 Lost Circulation Occurred
2018-10-24 Well Log Performed
2018-11-02 Direction Drilling Operation Performed - Horizontal
2018-11-06 Finished Drilling
2018-11-06 Well Log Performed
2018-11-06 Well Mode changed to Drilled and Cased
2018-11-07 Well Log Performed
2018-11-08 Production Casing Operation Performed
2018-11-08 Rig Released
2019-01-15 Perforation Treatment Performed - Jet Perforation
2019-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-23 Perforation Treatment Performed - Jet Perforation
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-02 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-08 Perforation Treatment Performed - Jet Perforation
2019-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Perforation Treatment Performed - Jet Perforation
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-11 Perforation Treatment Performed - Jet Perforation
2019-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-14 Perforation Treatment Performed - Jet Perforation
2019-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-23 Perforation Treatment Performed - Jet Perforation
2019-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-24 Perforation Treatment Performed - Jet Perforation
2019-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-25 Perforation Treatment Performed - Jet Perforation
2019-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-26 Perforation Treatment Performed - Jet Perforation
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-28 Perforation Treatment Performed - Jet Perforation
2019-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-02 Perforation Treatment Performed - Jet Perforation
2019-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-03 Perforation Treatment Performed - Jet Perforation
2019-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Perforation Treatment Performed - Jet Perforation
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Jet Perforation
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Perforation Treatment Performed - Jet Perforation
2019-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-11 Perforation Treatment Performed - Jet Perforation
2019-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-13 Well Began Production
2019-05-13 Well Fluid changed to Shale Gas Only
2019-05-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-01 Ensign Drilling Inc. 144 N/A Resumption
2018-09-06 Ensign Drilling Inc. 144 N/A Resumption
2018-08-11 Ensign Drilling Inc. 144 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-11 255.90 Deviate (5 - 79 degrees)
2018-11-02 3344.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-15 Perforation 6337.00 6337.50 20
2019-01-22 Perforation 6222.80 6223.30 12
2019-02-12 Perforation 5104.50 5105.00 8
2019-02-13 Multi-Stage Fracture 5104.50 5179.40 0
2019-02-13 Perforation 5089.50 5090.00 16
2019-02-13 Perforation 5074.70 5075.20 12
2019-02-13 Perforation 5059.70 5060.20 12
2019-02-13 Perforation 5044.80 5045.30 10
2019-02-13 Perforation 5029.90 5030.40 8
2019-02-13 Perforation 5015.00 5015.50 8
2019-02-14 Multi-Stage Fracture 5015.00 5090.00 0
2019-02-14 Perforation 5000.00 5000.50 16
2019-01-22 Perforation 6207.90 6208.40 10
2019-02-14 Perforation 4985.20 4985.70 12
2019-02-14 Perforation 4970.30 4970.80 12
2019-02-14 Perforation 4955.40 4955.90 10
2019-02-14 Perforation 4940.50 4941.00 8
2019-02-14 Perforation 4925.60 4926.10 8
2019-02-18 Multi-Stage Fracture 4925.60 5000.50 0
2019-02-18 Perforation 4910.60 4911.10 16
2019-02-18 Perforation 4895.70 4896.20 12
2019-02-18 Perforation 4880.80 4881.30 12
2019-02-18 Perforation 4865.90 4866.40 10
2019-01-22 Perforation 6192.90 6193.40 8
2019-02-18 Perforation 4851.00 4851.50 8
2019-02-18 Perforation 4836.10 4836.60 8
2019-02-20 Multi-Stage Fracture 4836.10 4911.10 0
2019-02-21 Perforation 4821.10 4821.60 16
2019-02-21 Perforation 4806.30 4806.80 12
2019-02-21 Perforation 4791.40 4791.90 12
2019-02-21 Perforation 4776.50 4777.00 10
2019-02-21 Perforation 4761.50 4762.00 8
2019-02-21 Perforation 4746.60 4747.10 8
2019-02-22 Multi-Stage Fracture 4746.60 4821.60 0
2019-01-22 Perforation 6178.00 6178.50 8
2019-02-22 Perforation 4731.60 4732.10 16
2019-02-22 Perforation 4716.80 4717.30 12
2019-02-22 Perforation 4701.90 4702.40 12
2019-02-22 Perforation 4687.00 4687.50 10
2019-02-22 Perforation 4672.10 4672.60 8
2019-02-22 Perforation 4657.20 4657.70 8
2019-02-23 Multi-Stage Fracture 4657.20 4732.10 0
2019-02-23 Perforation 4642.20 4642.70 16
2019-02-23 Perforation 4627.40 4627.90 12
2019-02-23 Perforation 4612.40 4612.90 12
2019-01-22 Multi-Stage Fracture 6178.00 6253.00 0
2019-02-23 Perforation 4597.50 4598.00 10
2019-02-23 Perforation 4582.60 4583.10 8
2019-02-23 Perforation 4567.70 4568.20 8
2019-02-24 Multi-Stage Fracture 4567.70 4642.70 0
2019-02-24 Perforation 4552.70 4553.20 16
2019-02-24 Perforation 4537.90 4538.40 12
2019-02-24 Perforation 4523.00 4523.50 12
2019-02-24 Perforation 4508.10 4508.60 10
2019-02-24 Perforation 4493.20 4493.70 8
2019-02-24 Perforation 4478.30 4478.80 8
2019-01-23 Perforation 6167.70 6168.50 16
2019-02-25 Multi-Stage Fracture 4478.30 4553.20 0
2019-02-25 Perforation 4463.30 4463.80 16
2019-02-25 Perforation 4448.40 4448.90 12
2019-02-25 Perforation 4433.50 4434.00 12
2019-02-25 Perforation 4418.60 4419.10 10
2019-02-25 Perforation 4403.70 4404.20 8
2019-02-25 Perforation 4388.80 4389.30 8
2019-02-26 Perforation 4373.80 4374.30 16
2019-02-26 Perforation 4359.00 4359.50 12
2019-02-26 Perforation 4344.10 4344.60 12
2019-01-23 Perforation 6167.10 6167.60 12
2019-02-26 Perforation 4329.20 4329.70 10
2019-02-26 Perforation 4314.20 4314.70 8
2019-02-26 Perforation 4299.30 4299.80 8
2019-02-26 Multi-Stage Fracture 4388.80 4463.80 0
2019-02-28 Perforation 4284.30 4284.80 16
2019-02-28 Perforation 4269.50 4270.00 12
2019-02-28 Perforation 4254.60 4255.10 12
2019-02-28 Perforation 4239.70 4240.20 10
2019-02-28 Perforation 4224.80 4225.30 8
2019-02-28 Perforation 4209.90 4210.40 8
2019-01-23 Perforation 6166.40 6166.90 12
2019-02-28 Multi-Stage Fracture 4299.30 4374.30 0
2019-03-01 Perforation 4194.90 4195.40 16
2019-03-01 Multi-Stage Fracture 4209.90 4284.80 0
2019-03-01 Perforation 4180.10 4180.60 12
2019-03-01 Perforation 4165.10 4165.60 12
2019-03-01 Perforation 4150.20 4150.70 10
2019-03-01 Perforation 4135.30 4135.80 8
2019-03-01 Perforation 4120.40 4120.90 8
2019-03-02 Multi-Stage Fracture 4120.40 4195.40 0
2019-03-02 Perforation 4105.40 4105.90 16
2019-01-24 Perforation 6156.00 6156.50 16
2019-03-02 Perforation 4090.60 4091.10 12
2019-03-02 Perforation 4075.70 4076.20 12
2019-03-02 Perforation 4060.80 4061.30 10
2019-03-02 Perforation 4045.90 4046.40 8
2019-03-02 Perforation 4031.00 4031.50 8
2019-03-03 Multi-Stage Fracture 4031.00 4105.90 0
2019-03-03 Perforation 4016.00 4016.50 16
2019-03-03 Perforation 4001.20 4001.70 12
2019-03-03 Perforation 3986.30 3986.80 12
2019-03-03 Perforation 3971.40 3971.90 10
2019-01-24 Perforation 6143.20 6143.70 12
2019-03-03 Perforation 3956.40 3956.90 8
2019-03-03 Perforation 3941.50 3942.00 8
2019-03-05 Multi-Stage Fracture 3941.50 4016.50 0
2019-03-05 Perforation 3926.50 3927.00 16
2019-03-05 Perforation 3911.70 3912.20 12
2019-03-05 Perforation 3896.80 3897.30 12
2019-03-05 Perforation 3881.90 3882.40 10
2019-03-05 Perforation 3866.90 3867.40 8
2019-03-05 Perforation 3852.00 3852.50 8
2019-03-06 Multi-Stage Fracture 3852.00 3927.00 0
2019-01-15 Perforation 6323.10 6323.60 20
2019-01-24 Perforation 6130.30 6130.80 12
2019-03-06 Perforation 3837.00 3837.50 16
2019-03-06 Perforation 3822.20 3822.70 12
2019-03-06 Perforation 3807.30 3807.80 12
2019-03-06 Perforation 3792.40 3792.90 10
2019-03-06 Perforation 3777.50 3778.00 8
2019-03-06 Perforation 3762.60 3763.10 8
2019-03-07 Perforation 3747.60 3748.10 16
2019-03-07 Perforation 3732.80 3733.30 12
2019-03-07 Perforation 3717.80 3718.30 12
2019-03-07 Perforation 3702.90 3703.40 10
2019-01-24 Perforation 6117.40 6117.90 10
2019-03-07 Perforation 3688.00 3688.50 8
2019-03-07 Perforation 3673.10 3673.60 8
2019-03-08 Multi-Stage Fracture 3762.60 3837.50 0
2019-03-10 Perforation 3658.10 3658.60 16
2019-03-10 Perforation 3643.30 3643.80 12
2019-03-10 Perforation 3628.40 3628.90 12
2019-03-10 Perforation 3613.50 3614.00 10
2019-03-10 Perforation 3598.60 3599.10 8
2019-03-10 Perforation 3583.70 3584.20 8
2019-03-10 Multi-Stage Fracture 3673.10 3748.10 0
2019-01-24 Perforation 6103.40 6103.90 8
2019-03-11 Perforation 3568.70 3569.20 16
2019-03-11 Perforation 3553.80 3554.30 12
2019-03-11 Perforation 3538.90 3539.40 12
2019-03-11 Perforation 3524.00 3524.50 10
2019-03-11 Perforation 3509.10 3509.60 8
2019-03-11 Perforation 3494.20 3494.70 8
2019-03-11 Perforation 3479.20 3479.70 16
2019-03-11 Perforation 3464.40 3464.90 12
2019-03-11 Perforation 3449.50 3450.00 12
2019-03-11 Perforation 3434.60 3435.10 10
2019-01-24 Perforation 6088.50 6089.00 8
2019-03-11 Perforation 3419.60 3420.10 8
2019-03-11 Perforation 3404.70 3405.20 8
2019-03-11 Multi-Stage Fracture 3583.70 3658.60 0
2019-03-12 Perforation 3389.70 3390.20 16
2019-03-12 Perforation 3374.90 3375.40 12
2019-03-12 Perforation 3360.00 3360.50 12
2019-03-12 Perforation 3345.10 3345.60 10
2019-03-12 Perforation 3330.20 3330.70 8
2019-03-12 Perforation 3315.30 3315.80 8
2019-03-12 Multi-Stage Fracture 3494.20 3569.20 0
2019-01-25 Multi-Stage Fracture 6088.50 6156.50 0
2019-03-12 Multi-Stage Fracture 3404.70 3479.70 0
2019-03-13 Multi-Stage Fracture 3315.30 3390.20 0
2019-01-25 Perforation 6073.50 6074.00 16
2019-01-25 Perforation 6058.70 6059.20 12
2019-01-25 Perforation 6043.80 6044.30 12
2019-01-25 Perforation 6028.90 6029.40 10
2019-01-25 Perforation 6014.00 6014.50 8
2019-01-15 Perforation 6309.20 6309.70 20
2019-01-25 Perforation 5999.10 5999.60 8
2019-01-26 Multi-Stage Fracture 5999.10 6074.00 0
2019-01-26 Perforation 5984.10 5984.60 16
2019-01-26 Perforation 5969.30 5969.80 12
2019-01-26 Perforation 5954.30 5954.80 12
2019-01-26 Perforation 5939.40 5939.90 5
2019-01-26 Perforation 5924.50 5925.00 8
2019-01-26 Perforation 5909.60 5910.10 8
2019-01-27 Perforation 5894.60 5895.10 16
2019-01-27 Perforation 5879.80 5880.30 12
2019-01-15 Perforation 6296.30 6296.80 20
2019-01-27 Perforation 5864.90 5865.40 12
2019-01-27 Perforation 5850.00 5850.50 10
2019-01-27 Perforation 5835.10 5835.60 8
2019-01-27 Perforation 5820.20 5820.70 8
2019-01-27 Perforation 5805.20 5805.70 16
2019-01-27 Perforation 5790.30 5790.80 12
2019-01-27 Perforation 5775.40 5775.90 12
2019-01-27 Perforation 5760.50 5761.00 10
2019-01-27 Perforation 5745.60 5746.10 8
2019-01-27 Perforation 5730.70 5731.20 8
2019-01-15 Perforation 6281.40 6281.90 20
2019-01-27 Multi-Stage Fracture 5909.60 5984.60 0
2019-01-30 Perforation 5715.70 5716.20 16
2019-01-30 Perforation 5700.90 5701.40 12
2019-01-30 Perforation 5686.00 5686.50 12
2019-01-30 Perforation 5671.10 5671.60 10
2019-01-30 Perforation 5656.10 5656.60 8
2019-01-30 Perforation 5641.20 5641.70 8
2019-01-30 Multi-Stage Fracture 5820.20 5895.10 0
2019-02-01 Perforation 5626.20 5626.70 8
2019-02-01 Perforation 5611.40 5611.90 8
2019-01-15 Perforation 6267.50 6268.00 20
2019-02-01 Perforation 5596.50 5597.00 10
2019-02-01 Perforation 5581.00 5581.50 12
2019-02-01 Perforation 5566.70 5567.20 12
2019-02-01 Perforation 5551.80 5552.30 16
2019-02-01 Multi-Stage Fracture 5730.70 5805.70 0
2019-02-02 Perforation 5536.80 5537.30 16
2019-02-02 Multi-Stage Fracture 5641.20 5716.20 0
2019-02-02 Perforation 5522.00 5522.50 12
2019-02-02 Perforation 5507.00 5507.50 12
2019-02-02 Perforation 5492.00 5492.50 10
2019-01-21 Multi-Stage Fracture 6267.50 6337.50 0
2019-02-02 Perforation 5477.20 5477.70 8
2019-02-02 Perforation 5462.30 5462.80 8
2019-02-02 Multi-Stage Fracture 5551.80 5626.70 0
2019-02-08 Perforation 5447.30 5447.80 16
2019-02-08 Multi-Stage Fracture 5462.30 5537.30 0
2019-02-08 Perforation 5432.50 5433.00 12
2019-02-08 Perforation 5417.60 5418.10 12
2019-02-08 Perforation 5402.70 5403.20 10
2019-02-08 Perforation 5387.80 5388.30 8
2019-02-08 Perforation 5372.90 5373.40 8
2019-01-22 Perforation 6252.50 6253.00 16
2019-02-10 Multi-Stage Fracture 5372.90 5447.80 0
2019-02-10 Perforation 5357.90 5358.40 16
2019-02-10 Perforation 5343.00 5343.50 12
2019-02-10 Perforation 5328.10 5328.60 12
2019-02-10 Perforation 5313.20 5313.70 10
2019-02-10 Perforation 5298.30 5298.80 8
2019-02-10 Perforation 5283.40 5283.90 8
2019-02-11 Multi-Stage Fracture 5283.40 5358.40 0
2019-02-11 Perforation 5268.40 5268.90 16
2019-02-12 Perforation 5252.90 5253.40 12
2019-01-22 Perforation 6237.70 6238.20 12
2019-02-12 Perforation 5227.80 5228.30 10
2019-02-12 Perforation 5213.90 5214.40 8
2019-02-12 Perforation 5199.90 5200.40 8
2019-02-12 Perforation 5185.90 5186.40 8
2019-02-12 Multi-Stage Fracture 5185.90 5276.00 0
2019-02-12 Perforation 5178.90 5179.40 16
2019-02-12 Perforation 5164.10 5164.60 12
2019-02-12 Perforation 5149.20 5149.70 12
2019-02-12 Perforation 5134.30 5134.80 10
2019-02-12 Perforation 5119.40 5119.90 8

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-21 2019-03-13 3,194 94,066 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.4596 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.4473 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.7701 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.0887 N/A
Water 7732-18-5 100 0.0887 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0081 N/A
Dibromoacetonitrile 3252-43-5 100 0.0081 N/A
Polyethylene Glycol 25322-68-3 100 0.0081 N/A
Sodium Bromide 7647-15-6 100 0.0081 N/A
Water 7732-18-5 100 0.0081 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0315 N/A
Methanol 67-56-1 100 0.0315 N/A
Non-hazardous Not Available 100 0.0315 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.001 N/A
1-decanol 112-30-1 100 0.001 N/A
1-octanol 111-87-5 100 0.001 N/A
2-butoxy ethanol 111-76-2 100 0.001 N/A
2-propanol 67-63-0 100 0.001 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.001 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.001 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.001 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.001 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.001 N/A
Water 7732-18-5 100 0.001 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0007 N/A
Isopropanol 67-63-0 100 0.0007 N/A
Methanol 67-56-1 100 0.0007 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1438 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1438 N/A
Lecitihins. soya 8030-76-0 100 0.1439 N/A
polymer Trade Secret 100 0.1438 N/A
Water 7732-18-5 100 0.1439 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0015 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0221 N/A
Water 7732-18-5 100 0.0221 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 3119
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1028
2019-01-18 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 7170
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1881
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 8735
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 9361
2019-02-20 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1931
2019-02-07 2019-03-02 Groundwater - Non-saline less than or equal to 150m deep 1487
2019-01-21 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 2369
2019-01-21 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 6107
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 1261
2019-02-10 2019-03-06 Groundwater - Non-saline less than or equal to 150m deep 3438
2019-02-07 2019-03-01 Groundwater - Non-saline less than or equal to 150m deep 3276
2019-01-20 2019-03-13 Surface Water - River 25390
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 1008
2019-01-20 2019-03-13 Groundwater - Non-saline less than or equal to 150m deep 14294

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1618 0.0 0.0 0.0
2020 2069 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-11 Lost Circulation 65.00 120.00
2018-09-09 Lost Circulation 1450.00 2911.00
2018-09-10 Lost Circulation 2911.00 2911.00
2019-03-13 No Incident Encountered 0.00 0.00
2019-03-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References