If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625201112020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.351201,"lon":-116.895425,"icon":""}]} |
Location: 02/12-11-062-20W5/0 | |
Location Alias: 02/12-11-62-20 W5M | |
Location Alias 2: 02/12-11-062-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 20 | |
Section: 11 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: DOME UNION KAYBOBS 12-11BR-62-20 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0115791 | |
License Date: 1985-07-03 | |
License Status: RecCertified | |
Spud Date: 1985-07-03 | |
Final Drill Date: 1985-07-07 | |
Well Total Depth: 1053.00 m | |
Surface Hole Latitude: 54.351201 | |
Surface Hole Longitude: -116.895425 |
Date | Event |
---|---|
1985-07-03 | Obtained License |
1985-07-04 | Surface Casing Operation Performed |
1985-07-07 | Finished Drilling |
1985-07-08 | Well Log Performed |
1985-07-09 | Drill Stem Test Performed |
1985-07-10 | Production Casing Operation Performed |
1985-07-10 | Rig Released |
1985-08-14 | Well Log Performed |
1985-08-15 | Perforation Treatment Performed - Jet Perforation |
1985-08-19 | Perforation Treatment Performed - Fractured |
1985-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-22 | Perforation Treatment Performed - Jet Perforation |
1985-08-22 | Plug Back Performed |
1985-08-23 | Perforation Treatment Performed - Fractured |
1985-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-26 | Perforation Treatment Performed - Jet Perforation |
1985-08-26 | Plug Back Performed |
1985-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-29 | Plug Back Performed |
1985-08-30 | Perforation Treatment Performed - Jet Perforation |
1985-09-01 | Perforation Treatment Performed - Fractured |
1985-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-09-03 | Plug Back Performed |
1985-09-03 | Well Log Performed |
1985-09-03 | Well Mode changed to Abandoned |
1985-09-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-08-15 | Perforation | 1012.00 | 1015.00 | 13 |
1985-08-30 | Perforation | 908.00 | 910.00 | 13 |
1985-09-01 | Fracture | 908.00 | 910.00 | 0 |
1985-09-03 | Packing Device Capped w/Cement | 893.00 | 901.00 | 0 |
1985-08-19 | Fracture | 1012.00 | 1015.00 | 0 |
1985-08-22 | Packing Device Capped w/Cement | 991.00 | 998.00 | 0 |
1985-08-22 | Perforation | 968.00 | 969.50 | 13 |
1985-08-23 | Fracture | 968.00 | 969.50 | 0 |
1985-08-26 | Packing Device Capped w/Cement | 958.00 | 966.00 | 0 |
1985-08-26 | Perforation | 937.50 | 938.50 | 13 |
1985-08-26 | Perforation | 940.00 | 945.00 | 13 |
1985-08-29 | Packing Device Capped w/Cement | 928.00 | 930.00 | 0 |
For data sources see[4]