X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625201104030

Well Details

Well ID: 0625201104030
Loading map...
Location: 03/04-11-062-20W5/0
Location Alias: 03/04-11-62-20 W5M
Location Alias 2: 03/04-11-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 11-14E 103 KAYBOBS 4-11-62-20
Operator Name: Murphy Oil Company Ltd.
License Number: 0486015
License Date: 2017-10-25
License Status: Issued
Spud Date: 2017-12-11
Final Drill Date: 2018-02-23
Well Total Depth: 5790.00 m
Surface Hole Latitude: 54.364560
Surface Hole Longitude: -116.889846

For data sources see[1][2]

Well History

Date Event
2017-10-25 Obtained License
2017-12-11 Surface Casing Operation Performed
2017-12-13 Well Log Performed
2017-12-15 Direction Drilling Operation Performed - Deviate
2017-12-17 Well Log Performed
2017-12-19 Intermediate Casing Operation Performed
2018-02-22 Direction Drilling Operation Performed - Horizontal
2018-02-23 Finished Drilling
2018-02-23 Well Mode changed to Drilled and Cased
2018-02-24 Well Log Performed
2018-02-25 Production Casing Operation Performed
2018-02-26 Rig Released
2018-04-28 Perforation Treatment Performed - Jet Perforation
2018-04-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-29 Perforation Treatment Performed - Jet Perforation
2018-04-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-30 Perforation Treatment Performed - Jet Perforation
2018-04-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-01 Perforation Treatment Performed - Jet Perforation
2018-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-02 Perforation Treatment Performed - Jet Perforation
2018-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-03 Perforation Treatment Performed - Jet Perforation
2018-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-04 Perforation Treatment Performed - Jet Perforation
2018-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-05 Perforation Treatment Performed - Jet Perforation
2018-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-06 Perforation Treatment Performed - Jet Perforation
2018-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-08 Perforation Treatment Performed - Jet Perforation
2018-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-09 Perforation Treatment Performed - Jet Perforation
2018-05-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-10 Perforation Treatment Performed - Jet Perforation
2018-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-11 Perforation Treatment Performed - Jet Perforation
2018-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-12 Perforation Treatment Performed - Jet Perforation
2018-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-13 Perforation Treatment Performed - Jet Perforation
2018-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-25 Well Began Production
2018-08-25 Well Fluid changed to Gas
2018-08-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-11 Precision Drilling Corporation 547 N/A Set Surface
2018-02-19 Precision Drilling Corporation 547 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-15 689.30 Deviate (5 - 79 degrees)
2018-02-22 3405.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-28 Perforation 5707.00 5707.50 8
2018-04-28 Perforation 5695.00 5695.50 5
2018-05-04 Perforation 4795.00 4795.50 5
2018-05-04 Multi-Stage Fracture 4747.00 4795.50 0
2018-05-05 Perforation 4687.00 4687.50 5
2018-05-05 Perforation 4699.00 4699.50 5
2018-05-05 Perforation 4711.00 4711.50 5
2018-05-05 Perforation 4723.00 4723.50 5
2018-05-05 Perforation 4735.00 4735.50 5
2018-05-05 Multi-Stage Fracture 4687.00 4735.50 0
2018-05-05 Perforation 4627.00 4627.50 5
2018-05-05 Perforation 4639.00 4639.50 5
2018-04-28 Multi-Stage Fracture 5647.00 5695.50 0
2018-05-05 Perforation 4651.00 4651.50 5
2018-05-05 Perforation 4663.00 4663.50 5
2018-05-05 Perforation 4675.00 4675.50 5
2018-05-05 Multi-Stage Fracture 4627.00 4675.50 0
2018-05-06 Perforation 4567.00 4567.50 5
2018-05-06 Perforation 4579.00 4579.50 5
2018-05-06 Perforation 4591.00 4591.50 5
2018-05-06 Perforation 4603.00 4603.50 5
2018-05-06 Perforation 4615.00 4615.50 5
2018-05-06 Multi-Stage Fracture 4567.00 4615.50 0
2018-04-29 Perforation 5587.00 5587.50 5
2018-05-06 Perforation 4507.00 4507.50 5
2018-05-06 Perforation 4519.00 4519.50 5
2018-05-06 Perforation 4531.00 4531.50 5
2018-05-06 Perforation 4543.00 4543.50 5
2018-05-06 Perforation 4555.00 4555.50 5
2018-05-06 Multi-Stage Fracture 4507.00 4555.50 0
2018-05-06 Perforation 4447.00 4447.50 5
2018-05-06 Perforation 4459.00 4459.50 5
2018-05-06 Perforation 4471.00 4471.50 5
2018-05-06 Perforation 4483.00 4483.50 5
2018-04-29 Perforation 5599.00 5599.50 5
2018-05-06 Perforation 4495.00 4495.50 5
2018-05-06 Multi-Stage Fracture 4447.00 4495.50 0
2018-05-07 Perforation 4387.00 4387.50 5
2018-05-07 Perforation 4399.00 4399.50 5
2018-05-07 Perforation 4411.00 4411.50 5
2018-05-07 Perforation 4423.00 4423.50 5
2018-05-07 Perforation 4435.00 4435.50 5
2018-05-07 Multi-Stage Fracture 4387.00 4435.50 0
2018-05-07 Perforation 4327.00 4327.50 5
2018-05-07 Perforation 4339.00 4339.50 5
2018-04-29 Perforation 5611.00 5611.50 5
2018-05-07 Perforation 4351.00 4351.50 5
2018-05-07 Perforation 4363.00 4363.50 5
2018-05-07 Perforation 4375.00 4375.50 5
2018-05-07 Multi-Stage Fracture 4327.00 4375.50 0
2018-05-07 Perforation 4267.00 4267.50 5
2018-05-07 Perforation 4279.00 4279.50 5
2018-05-07 Perforation 4291.00 4291.50 5
2018-05-07 Perforation 4303.00 4303.50 5
2018-05-07 Perforation 4315.00 4315.50 5
2018-05-07 Multi-Stage Fracture 4267.00 4315.50 0
2018-04-29 Perforation 5623.00 5623.50 5
2018-05-08 Perforation 4207.00 4207.50 5
2018-05-08 Perforation 4219.00 4219.50 5
2018-05-08 Perforation 4231.00 4231.50 5
2018-05-08 Perforation 4243.00 4243.50 5
2018-05-08 Perforation 4255.00 4255.50 5
2018-05-08 Multi-Stage Fracture 4207.00 4255.50 0
2018-05-08 Perforation 4147.00 4147.50 5
2018-05-08 Perforation 4159.00 4159.50 5
2018-05-08 Perforation 4171.00 4171.50 5
2018-05-08 Perforation 4183.00 4183.50 5
2018-04-29 Perforation 5635.00 5635.50 5
2018-05-08 Perforation 4195.00 4195.50 5
2018-05-08 Multi-Stage Fracture 4147.00 4195.50 0
2018-05-08 Perforation 4087.00 4087.50 5
2018-05-08 Perforation 4099.00 4099.50 5
2018-05-08 Perforation 4111.00 4111.50 5
2018-05-08 Perforation 4123.00 4123.50 5
2018-05-08 Perforation 4135.00 4135.50 5
2018-05-08 Multi-Stage Fracture 4087.00 4135.50 0
2018-05-09 Perforation 4027.00 4027.50 5
2018-05-09 Perforation 4039.00 4039.50 5
2018-04-29 Multi-Stage Fracture 5587.00 5635.50 0
2018-05-09 Perforation 4051.00 4051.50 5
2018-05-09 Perforation 4063.00 4063.50 5
2018-05-09 Perforation 4075.00 4075.50 5
2018-05-09 Multi-Stage Fracture 4027.00 4075.50 0
2018-05-09 Perforation 3967.00 3967.50 5
2018-05-09 Perforation 3979.00 3979.50 5
2018-05-09 Perforation 3991.00 3991.50 5
2018-05-09 Perforation 4003.00 4003.50 5
2018-05-09 Perforation 4015.00 4015.50 5
2018-05-09 Multi-Stage Fracture 3967.00 4015.50 0
2018-04-29 Perforation 5527.00 5527.50 5
2018-05-10 Perforation 3907.00 3907.50 5
2018-05-10 Perforation 3919.00 3919.50 5
2018-05-10 Perforation 3931.00 3931.50 5
2018-05-10 Perforation 3943.00 3943.50 5
2018-05-10 Perforation 3955.00 3955.50 5
2018-05-10 Multi-Stage Fracture 3907.00 3955.50 0
2018-05-10 Perforation 3847.00 3847.50 4
2018-05-10 Perforation 3859.00 3859.50 4
2018-05-10 Perforation 3871.00 3871.50 4
2018-05-10 Perforation 3883.00 3883.50 4
2018-04-29 Perforation 5539.00 5539.50 5
2018-05-10 Perforation 3895.00 3895.50 4
2018-05-10 Multi-Stage Fracture 3847.00 3895.50 0
2018-05-10 Perforation 3787.00 3787.50 4
2018-05-10 Perforation 3799.00 3799.50 4
2018-05-10 Perforation 3811.00 3811.50 4
2018-05-10 Perforation 3823.00 3823.50 4
2018-05-10 Perforation 3835.00 3835.50 4
2018-05-10 Multi-Stage Fracture 3787.00 3835.50 0
2018-05-10 Perforation 3727.00 3727.50 4
2018-05-10 Perforation 3739.00 3739.50 4
2018-04-28 Perforation 5719.00 5719.50 8
2018-04-29 Perforation 5551.00 5551.50 5
2018-05-10 Perforation 3751.00 3751.50 4
2018-05-10 Perforation 3763.00 3763.50 4
2018-05-10 Perforation 3775.00 3775.50 4
2018-05-10 Multi-Stage Fracture 3727.00 3775.50 0
2018-05-11 Perforation 3667.00 3667.50 4
2018-05-11 Perforation 3679.00 3679.50 4
2018-05-11 Perforation 3691.00 3691.50 4
2018-05-11 Perforation 3703.00 3703.50 4
2018-05-11 Perforation 3715.00 3715.50 4
2018-05-11 Multi-Stage Fracture 3667.00 3715.50 0
2018-04-29 Perforation 5563.00 5563.50 5
2018-05-11 Perforation 3607.00 3607.50 4
2018-05-11 Perforation 3619.00 3619.50 4
2018-05-11 Perforation 3631.00 3631.50 4
2018-05-11 Perforation 3643.00 3643.50 4
2018-05-11 Perforation 3655.00 3655.50 4
2018-05-11 Multi-Stage Fracture 3607.00 3655.50 0
2018-05-11 Perforation 3547.00 3547.50 4
2018-05-11 Perforation 3559.00 3559.50 4
2018-05-11 Perforation 3571.00 3571.50 4
2018-05-11 Perforation 3583.00 3583.50 4
2018-04-29 Perforation 5575.00 5575.50 5
2018-05-11 Perforation 3595.00 3595.50 4
2018-05-11 Multi-Stage Fracture 3547.00 3595.50 0
2018-05-12 Perforation 3487.00 3487.50 4
2018-05-12 Perforation 3499.00 3499.50 4
2018-05-12 Perforation 3511.00 3511.50 4
2018-05-12 Perforation 3523.00 3523.50 4
2018-05-12 Perforation 3535.00 3535.50 4
2018-05-12 Multi-Stage Fracture 3487.00 3535.50 0
2018-05-13 Perforation 3427.00 3427.50 4
2018-05-13 Perforation 3439.00 3439.50 4
2018-04-29 Multi-Stage Fracture 5527.00 5575.50 0
2018-05-13 Perforation 3451.00 3451.50 4
2018-05-13 Perforation 3463.00 3463.50 4
2018-05-13 Perforation 3475.00 3475.50 4
2018-05-13 Multi-Stage Fracture 3427.00 3475.50 0
2018-04-30 Perforation 5467.00 5467.50 5
2018-04-30 Perforation 5479.00 5479.50 5
2018-04-30 Perforation 5491.00 5491.50 5
2018-04-30 Perforation 5503.00 5503.50 5
2018-04-30 Perforation 5515.00 5515.50 5
2018-04-30 Multi-Stage Fracture 5467.00 5515.50 0
2018-04-28 Perforation 5731.00 5731.50 8
2018-04-30 Perforation 5407.00 5407.50 5
2018-04-30 Perforation 5419.00 5419.50 5
2018-04-30 Perforation 5431.00 5431.50 5
2018-04-30 Perforation 5443.00 5443.50 5
2018-04-30 Perforation 5455.00 5455.50 5
2018-04-30 Multi-Stage Fracture 5407.00 5455.50 0
2018-05-01 Perforation 5347.00 5347.50 5
2018-05-01 Perforation 5359.00 5359.50 5
2018-05-01 Perforation 5371.00 5371.50 5
2018-05-01 Perforation 5383.00 5383.50 5
2018-04-28 Perforation 5743.00 5743.50 8
2018-05-01 Perforation 5395.00 5395.50 5
2018-05-01 Multi-Stage Fracture 5347.00 5395.50 0
2018-05-01 Perforation 5287.00 5287.50 5
2018-05-01 Perforation 5299.00 5299.50 5
2018-05-01 Perforation 5311.00 5311.50 5
2018-05-01 Perforation 5323.00 5323.50 5
2018-05-01 Perforation 5335.00 5335.50 5
2018-05-01 Multi-Stage Fracture 5287.00 5335.50 0
2018-05-02 Perforation 5227.00 5227.50 5
2018-05-02 Perforation 5239.00 5239.50 5
2018-04-28 Perforation 5755.00 5755.50 8
2018-05-02 Perforation 5251.00 5251.50 5
2018-05-02 Perforation 5263.00 5263.50 5
2018-05-02 Perforation 5275.00 5275.50 5
2018-05-02 Multi-Stage Fracture 5227.00 5275.50 0
2018-05-02 Perforation 5167.00 5167.50 5
2018-05-02 Perforation 5179.00 5179.50 5
2018-05-02 Perforation 5191.00 5191.50 5
2018-05-02 Perforation 5203.00 5203.50 5
2018-05-02 Perforation 5215.00 5215.50 5
2018-05-02 Multi-Stage Fracture 5167.00 5215.50 0
2018-04-28 Multi-Stage Fracture 5707.00 5762.70 0
2018-05-02 Perforation 5107.00 5107.50 5
2018-05-02 Perforation 5119.00 5119.50 5
2018-05-02 Perforation 5131.00 5131.50 5
2018-05-02 Perforation 5143.00 5143.50 5
2018-05-02 Perforation 5155.00 5155.50 5
2018-05-02 Multi-Stage Fracture 5107.00 5155.50 0
2018-05-03 Perforation 5047.00 5047.50 5
2018-05-03 Perforation 5059.00 5059.50 5
2018-05-03 Perforation 5071.00 5071.50 5
2018-05-03 Perforation 5083.00 5083.50 5
2018-04-28 Perforation 5647.00 5647.50 5
2018-05-03 Perforation 5095.00 5095.50 5
2018-05-03 Multi-Stage Fracture 5047.00 5095.50 0
2018-05-03 Perforation 4987.00 4987.50 5
2018-05-03 Perforation 4999.00 4999.50 5
2018-05-03 Perforation 5011.00 5011.50 5
2018-05-03 Perforation 5023.00 5023.50 5
2018-05-03 Perforation 5035.00 5035.50 5
2018-05-03 Multi-Stage Fracture 4987.00 5035.50 0
2018-05-04 Perforation 4927.00 4927.50 5
2018-05-04 Perforation 4939.00 4939.50 5
2018-04-28 Perforation 5659.00 5659.50 5
2018-05-04 Perforation 4951.00 4951.50 5
2018-05-04 Perforation 4963.00 4963.50 5
2018-05-04 Perforation 4975.00 4975.50 5
2018-05-04 Multi-Stage Fracture 4927.00 4975.50 0
2018-05-04 Perforation 4867.00 4867.50 5
2018-05-04 Perforation 4879.00 4879.50 5
2018-05-04 Perforation 4891.00 4891.50 5
2018-05-04 Perforation 4903.00 4903.50 5
2018-05-04 Perforation 4915.00 4915.50 5
2018-05-04 Multi-Stage Fracture 4867.00 4915.50 0
2018-04-28 Perforation 5671.00 5671.50 5
2018-05-04 Perforation 4807.00 4807.50 5
2018-05-04 Perforation 4819.00 4819.50 5
2018-05-04 Perforation 4831.00 4831.50 5
2018-05-04 Perforation 4843.00 4843.50 5
2018-05-04 Perforation 4855.00 4855.50 5
2018-05-04 Multi-Stage Fracture 4807.00 4855.50 0
2018-05-04 Perforation 4747.00 4747.50 5
2018-05-04 Perforation 4759.00 4759.50 5
2018-05-04 Perforation 4771.00 4771.50 5
2018-05-04 Perforation 4783.00 4783.50 5

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-28 2018-05-13 3,193 46,815 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 92.0093 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.4851 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.5221 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.5292 N/A
Water 7732-18-5 100 0.5292 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0093 N/A
Dibromoacetonitrile 3252-43-5 100 0.0093 N/A
Polyethylene Glycol 25322-68-3 100 0.0093 N/A
Sodium Bromide 7647-15-6 100 0.0093 N/A
Water 7732-18-5 100 0.0093 N/A
Breaker HP BJ Services Breaker Ethylene glycol 107-21-1 100 0.0096 N/A
Non-hazardous Not Available 100 0.0096 N/A
tert-Butyl hydroperoxide 75-91-2 100 0.0096 N/A
Water 7732-18-5 100 0.0096 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0241 N/A
Potassium hydroxide 1310-58-3 100 0.0241 N/A
Water 7732-18-5 100 0.0241 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0994 N/A
Non-hazardous Not Available 100 0.0994 N/A
Water 7732-18-5 100 0.0994 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0041 N/A
Methanol 67-56-1 100 0.0041 N/A
Modified thiourea polymer 68527-49-1 100 0.0041 N/A
Olefin 64743-02-8 100 0.0041 N/A
Polyoxyalkylenes 68951-67-7 100 0.0041 N/A
Propargyl alcohol 107-19-7 100 0.0041 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.0215 N/A
Ethylene glycol 107-21-1 100 0.0215 N/A
Inorganic Borates 1319-33-1 100 0.0215 N/A
Polysaccharide 11138-66-2 100 0.0215 N/A
Water 7732-18-5 100 0.0215 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1197 N/A
Oxyalkylated alcohol 9014 100 0.1197 N/A
Petroleum distillates 64742-47-8 100 0.1197 N/A
Polyacrylate 9014 100 0.1197 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0279 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0046 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0119 N/A
Water 7732-18-5 100 0.0119 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-27 2018-05-20 Surface Water - Lake 42854

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3033 0.0 0.0 0.0
2019 7874 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-26 No Incident Encountered 0.00 0.00
2018-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References