X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625200702000

Well Details

Well ID: 0625200702000
Loading map...
Location: 00/02-07-062-20W5/0
Location Alias: 00/02-07-62-20 W5M
Location Alias 2: 00/02-07-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: 1976082 KAYBOBS 2-7-62-20
Operator Name: Razor Energy Corp.
License Number: 0025147
License Date: 1963-11-18
License Status: Abandoned
Spud Date: 1963-11-23
Final Drill Date: 1963-12-06
Well Total Depth: 2165.00 m
Surface Hole Latitude: 54.343535
Surface Hole Longitude: -116.985121

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-18 Obtained License
1963-12-06 Finished Drilling
1963-12-06 Well Mode changed to Drilled and Cased
1963-12-08 Production Casing Operation Performed
1963-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-09 Perforation Treatment Performed - Bullet Perforation
1963-12-11 Well Began Production
1963-12-11 Well Fluid changed to Crude Oil
1963-12-11 Well Mode changed to Flowing
1976-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-10 Well Fluid changed to Crude Oil
1979-10-10 Well Mode changed to Pumping
2004-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-16 Perforation Treatment Performed - Jet Perforation
2004-10-16 Plug Back Performed
2004-10-16 Well Fluid changed to Crude Oil
2004-10-16 Well Log Performed
2004-10-16 Well Mode changed to Abandoned Zone
2004-10-19 Perforation Treatment Performed - Cement Squeeze
2005-09-06 Well Abandoned
2005-09-06 Well Fluid changed to Crude Oil
2005-09-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-09 Bullet Perforation 2140.90 2149.80 7
1963-12-09 Acid Treatment 2140.90 2149.80 0
1976-07-28 Acid Treatment 2140.90 2149.80 0
2004-10-16 Packing Device Capped w/Cement 2122.00 2130.00 0
2004-10-16 Perforation 270.00 271.00 13
2004-10-19 Cement Squeeze 270.00 271.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3606 0.0 0.0 0.0
1968 1961 0.0 0.0 0.0
1969 1215 0.0 0.0 0.0
1970 1894 0.0 0.0 0.0
1971 4974 0.0 0.0 0.0
1972 6567 0.0 0.0 0.0
1973 7271 0.0 0.0 0.0
1974 7023 0.0 0.0 0.0
1975 2610 0.0 0.0 0.0
1976 5104 0.0 0.0 0.0
1977 5267 0.0 0.0 0.0
1978 5570 0.0 0.0 0.0
1979 6229 0.0 0.0 0.0
1980 7974 0.0 0.0 0.0
1981 8420 0.0 0.0 0.0
1982 8636 0.0 0.0 0.0
1983 8291 0.0 0.0 0.0
1984 8048 0.0 0.0 0.0
1985 7611 0.0 0.0 0.0
1986 7976 0.0 0.0 0.0
1987 7402 0.0 0.0 0.0
1988 6936 0.0 0.0 0.0
1989 7403 0.0 0.0 0.0
1990 7291 0.0 0.0 0.0
1991 6522 0.0 0.0 0.0
1992 8113 0.0 0.0 0.0
1993 6579 0.0 0.0 0.0
1994 8464 0.0 0.0 0.0
1995 8601 0.0 0.0 0.0
1996 8033 0.0 0.0 0.0
1997 8669 0.0 0.0 0.0
1998 8399 0.0 0.0 0.0
1999 2568 0.0 0.0 0.0
2000 2972 0.0 0.0 0.0
2001 896 0.0 0.0 0.0

For data sources see[5]

References