X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625200312000

Well Details

Well ID: 0625200312000
Loading map...
Location: 00/12-03-062-20W5/0
Location Alias: 00/12-03-62-20 W5M
Location Alias 2: 00/12-03-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: 1976082 KAYBOBS 12-3-62-20
Operator Name: Razor Energy Corp.
License Number: 0025952
License Date: 1964-03-31
License Status: Issued
Spud Date: 1964-05-19
Final Drill Date: 1964-06-03
Well Total Depth: 2171.70 m
Surface Hole Latitude: 54.335924
Surface Hole Longitude: -116.923117

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-03-31 Obtained License
1964-06-03 Finished Drilling
1964-06-03 Well Mode changed to Drilled and Cased
1964-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-05 Perforation Treatment Performed - Jet Perforation
1964-06-05 Production Casing Operation Performed
1964-06-11 Well Began Production
1964-06-11 Well Fluid changed to Crude Oil
1964-06-11 Well Mode changed to Flowing
1985-07-25 Well Log Performed
1985-09-05 Well Log Performed
1987-01-31 Perforation Treatment Performed - Jet Perforation
1987-01-31 Well Log Performed
1987-02-07 Well Fluid changed to Crude Oil
1987-02-07 Well Mode changed to Pumping
1988-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-23 Perforation Treatment Performed - Chemical Squeeze
2009-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-05 Perforation 2144.60 2158.00 7
1964-06-05 Acid Treatment 2144.60 2158.00 0
1987-01-31 Perforation 2144.50 2152.00 13
1988-03-22 Acid Treatment 2144.50 2152.00 0
2007-08-23 Chemical Squeeze 2144.50 2158.00 0
2009-05-23 Acid Treatment 2144.50 2158.00 0
2018-02-12 Acid Treatment 2144.50 2152.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 1294 0.0 0.0 0.0
1969 4003 0.0 0.0 0.0
1970 6079 0.0 0.0 0.0
1971 6498 0.0 0.0 0.0
1972 5811 0.0 0.0 0.0
1973 7168 0.0 0.0 0.0
1974 6730 0.0 0.0 0.0
1975 2308 0.0 0.0 0.0
1976 3981 0.0 0.0 0.0
1977 4228 0.0 0.0 0.0
1978 4082 0.0 0.0 0.0
1979 6553 0.0 0.0 0.0
1980 7866 0.0 0.0 0.0
1981 6317 0.0 0.0 0.0
1982 7767 0.0 0.0 0.0
1983 7732 0.0 0.0 0.0
1984 8505 0.0 0.0 0.0
1985 4887 0.0 0.0 0.0
1986 2201 0.0 0.0 0.0
1987 7581 0.0 0.0 0.0
1988 7102 0.0 0.0 0.0
1989 5266 0.0 0.0 0.0
1990 7876 0.0 0.0 0.0
1991 7721 0.0 0.0 0.0
1992 8564 0.0 0.0 0.0
1993 7781 0.0 0.0 0.0
1994 8420 0.0 0.0 0.0
1995 6787 0.0 0.0 0.0
1996 7759 0.0 0.0 0.0
1997 8594 0.0 0.0 0.0
1998 7855 0.0 0.0 0.0
1999 8508 0.0 0.0 0.0
2000 8203 0.0 0.0 0.0
2001 7489 0.0 0.0 0.0
2002 8589 0.0 0.0 0.0
2003 8205 0.0 0.0 0.0
2004 7767 0.0 0.0 0.0
2005 5763 0.0 0.0 0.0
2006 8123 0.0 0.0 0.0
2007 8275 0.0 0.0 0.0
2008 6934 0.0 0.0 0.0
2009 6011 0.0 0.0 0.0
2010 7960 0.0 0.0 0.0
2011 8300 0.0 0.0 0.0
2012 7915 0.0 0.0 0.0
2013 4094 0.0 0.0 0.0
2014 2513 0.0 0.0 0.0
2015 7844 0.0 0.0 0.0
2018 2140 0.0 0.0 0.0
2019 6597 0.0 0.0 0.0
2020 2032 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References