X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625200113000

Well Details

Well ID: 0625200113000
Loading map...
Location: 00/13-01-062-20W5/0
Location Alias: 00/13-01-62-20 W5M
Location Alias 2: 00/13-01-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: 1976082 KAYBOBS 13-1-62-20
Operator Name: Razor Energy Corp.
License Number: 0051709
License Date: 1974-10-31
License Status: Suspension
Spud Date: 1974-11-02
Final Drill Date: 1974-12-22
Well Total Depth: 2196.40 m
Surface Hole Latitude: 54.340670
Surface Hole Longitude: -116.875593

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-31 Obtained License
1974-11-03 Lost Circulation Occurred
1974-12-22 Finished Drilling
1974-12-22 Well Log Performed
1974-12-22 Well Mode changed to Drilled and Cased
1974-12-23 Production Casing Operation Performed
1975-06-19 Perforation Treatment Performed - Jet Perforation
1975-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-06 Well Began Injection
1975-08-06 Well Fluid changed to Water
1975-08-06 Well Type changed to Injection
1987-04-04 Perforation Treatment Performed - Jet Perforation
1987-04-04 Well Log Performed
1987-04-05 Perforation Treatment Performed - Cement Squeeze
1987-04-08 Perforation Treatment Performed - Jet Perforation
1987-04-08 Well Log Performed
1987-04-10 Perforation Treatment Performed - Fractured
1989-05-19 Well Log Performed
2007-03-13 Well Fluid changed to Water
2007-03-13 Well Mode changed to Suspended
2007-03-13 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-19 Perforation 2164.10 2165.90 7
1975-06-19 Perforation 2167.70 2175.70 7
1975-06-20 Acid Treatment 2164.10 2175.70 0
1987-04-04 Perforation 2179.50 2180.50 13
1987-04-05 Cement Squeeze 2179.50 2180.50 0
1987-04-08 Perforation 2169.60 2175.60 13
1987-04-08 Perforation 2163.60 2169.60 13
1987-04-10 Fracture 2163.60 2175.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-11-03 Lost Circulation 176.40 176.40

For data sources see[6]

References