X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625193005000

Well Details

Well ID: 0625193005000
Loading map...
Location: 00/05-30-062-19W5/0
Location Alias: 00/05-30-62-19 W5M
Location Alias 2: 00/05-30-062-19 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 19
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON HZ FOXCK 5-30-62-19
Operator Name: Chevron Canada Limited
License Number: 0493385
License Date: 2019-01-10
License Status: Amended
Spud Date: 2019-06-10
Final Drill Date: 2019-09-26
Well Total Depth: 5516.00 m
Surface Hole Latitude: 54.377717
Surface Hole Longitude: -116.826320

For data sources see[1][2]

Well History

Date Event
2019-01-10 Obtained License
2019-06-10 Drill To LD
2019-06-10 Surface Casing Operation Performed
2019-07-15 Direction Drilling Operation Performed - Deviate
2019-07-15 Resumption
2019-07-16 Lost Circulation Occurred
2019-07-19 Intermediate Casing Operation Performed
2019-09-22 Resumption
2019-09-23 Direction Drilling Operation Performed - Horizontal
2019-09-26 Finished Drilling
2019-09-26 Well Log Performed
2019-09-26 Well Mode changed to Drilled and Cased
2019-09-27 Well Log Performed
2019-09-28 Lost Circulation Occurred
2019-09-28 Production Casing Operation Performed
2019-09-28 Rig Released
2019-10-22 Perforation Treatment Performed - Jet Perforation
2019-10-27 Perforation Treatment Performed - Jet Perforation
2019-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-28 Perforation Treatment Performed - Jet Perforation
2019-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-29 Perforation Treatment Performed - Jet Perforation
2019-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-30 Perforation Treatment Performed - Jet Perforation
2019-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-31 Perforation Treatment Performed - Jet Perforation
2019-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-01 Perforation Treatment Performed - Jet Perforation
2019-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-02 Perforation Treatment Performed - Jet Perforation
2019-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-03 Perforation Treatment Performed - Jet Perforation
2019-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-04 Perforation Treatment Performed - Jet Perforation
2019-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-05 Perforation Treatment Performed - Jet Perforation
2019-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-06 Perforation Treatment Performed - Jet Perforation
2019-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-24 Well Began Production
2020-02-24 Well Fluid changed to Shale Gas Only
2020-02-24 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-10 Ensign Drilling Inc. 144 Drill To LD
2019-07-15 Ensign Drilling Inc. 144 Resumption
2019-09-22 Ensign Drilling Inc. 144 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-07-15 560.60 Deviate (5 - 79 degrees)
2019-09-23 3264.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-22 Perforation 5424.80 5425.30 12
2019-10-27 Perforation 5296.70 5297.20 8
2019-11-01 Perforation 4170.00 4170.50 14
2019-11-01 Perforation 4155.20 4155.70 10
2019-11-01 Perforation 4140.40 4140.90 10
2019-11-01 Perforation 4125.50 4126.00 8
2019-11-02 Multi-Stage Fracture 4125.50 4200.00 0
2019-11-02 Perforation 4110.50 4111.00 16
2019-11-02 Perforation 4095.90 4096.40 12
2019-11-02 Perforation 4081.10 4081.60 14
2019-11-02 Perforation 4066.20 4066.70 10
2019-11-02 Perforation 4051.40 4051.90 10
2019-10-27 Perforation 5281.90 5282.40 8
2019-11-02 Perforation 4036.60 4037.10 8
2019-11-02 Multi-Stage Fracture 4036.60 4111.00 0
2019-11-02 Perforation 4021.60 4022.10 16
2019-11-02 Perforation 4006.90 4007.40 12
2019-11-02 Perforation 3992.10 3992.60 14
2019-11-02 Perforation 3977.30 3977.80 10
2019-11-02 Perforation 3962.40 3962.90 10
2019-11-02 Perforation 3947.60 3948.10 8
2019-11-02 Multi-Stage Fracture 3947.60 4022.10 0
2019-11-02 Perforation 3932.60 3933.10 16
2019-10-27 Multi-Stage Fracture 5370.90 5425.30 0
2019-11-02 Perforation 3918.00 3918.50 12
2019-11-02 Perforation 3903.10 3903.60 14
2019-11-02 Perforation 3888.30 3888.80 10
2019-11-02 Perforation 3873.50 3874.00 10
2019-11-02 Perforation 3858.70 3859.20 8
2019-11-03 Multi-Stage Fracture 3858.70 3933.10 0
2019-11-03 Perforation 3843.70 3844.20 16
2019-11-03 Perforation 3829.00 3829.50 12
2019-11-03 Perforation 3814.00 3814.50 14
2019-11-03 Perforation 3799.40 3799.90 10
2019-10-28 Perforation 5266.90 5267.40 12
2019-11-03 Perforation 3784.50 3785.00 10
2019-11-03 Perforation 3769.70 3770.20 8
2019-11-03 Multi-Stage Fracture 3769.70 3844.20 0
2019-11-03 Perforation 3754.70 3755.20 16
2019-11-03 Perforation 3740.10 3740.60 12
2019-11-03 Perforation 3725.20 3725.70 14
2019-11-03 Perforation 3710.40 3710.90 10
2019-11-03 Perforation 3695.60 3696.10 10
2019-11-03 Perforation 3680.80 3681.30 8
2019-11-03 Multi-Stage Fracture 3680.80 3755.20 0
2019-10-28 Multi-Stage Fracture 5281.90 5356.40 0
2019-11-04 Perforation 3665.80 3666.30 16
2019-11-04 Perforation 3651.10 3651.60 12
2019-11-04 Perforation 3636.30 3636.80 14
2019-11-04 Perforation 3621.50 3622.00 10
2019-11-04 Perforation 3606.60 3607.10 10
2019-11-04 Perforation 3591.80 3592.30 8
2019-11-04 Multi-Stage Fracture 3591.80 3666.30 0
2019-11-04 Perforation 3576.80 3577.30 16
2019-11-04 Perforation 3562.20 3562.70 12
2019-11-04 Perforation 3547.30 3547.80 14
2019-10-28 Perforation 5252.30 5252.80 10
2019-11-04 Perforation 3532.50 3533.00 10
2019-11-04 Perforation 3517.70 3518.20 10
2019-11-04 Perforation 3502.90 3503.40 8
2019-11-05 Multi-Stage Fracture 3502.90 3577.30 0
2019-11-05 Perforation 3487.90 3488.40 16
2019-11-05 Perforation 3473.20 3473.70 12
2019-11-05 Perforation 3458.40 3458.90 14
2019-11-05 Perforation 3443.60 3444.10 10
2019-11-05 Perforation 3427.70 3428.20 10
2019-11-05 Perforation 3413.90 3414.40 8
2019-10-28 Perforation 5237.40 5237.90 10
2019-11-05 Multi-Stage Fracture 3413.90 3488.40 0
2019-11-05 Perforation 3398.90 3399.40 16
2019-11-05 Perforation 3384.30 3384.80 12
2019-11-05 Perforation 3369.40 3369.90 14
2019-11-05 Perforation 3354.60 3355.10 10
2019-11-05 Perforation 3339.80 3340.30 10
2019-11-05 Perforation 3325.00 3325.50 8
2019-11-05 Multi-Stage Fracture 3325.00 3399.40 0
2019-11-06 Perforation 3310.00 3310.50 16
2019-11-06 Perforation 3295.30 3295.80 12
2019-10-28 Perforation 5222.60 5223.10 10
2019-11-06 Perforation 3280.50 3281.00 14
2019-11-06 Perforation 3265.70 3266.20 10
2019-11-06 Perforation 3250.80 3251.30 10
2019-11-06 Perforation 3236.00 3236.50 8
2019-11-06 Multi-Stage Fracture 3236.00 3310.50 0
2019-10-28 Perforation 5206.80 5207.30 10
2019-10-28 Perforation 5193.00 5193.50 8
2019-10-22 Perforation 5415.30 5415.80 12
2019-10-28 Multi-Stage Fracture 5193.00 5267.40 0
2019-10-29 Perforation 5178.00 5178.50 14
2019-10-29 Perforation 5163.30 5163.80 12
2019-10-29 Perforation 5148.50 5149.00 10
2019-10-29 Perforation 5133.70 5134.20 10
2019-10-29 Perforation 5118.80 5119.30 8
2019-10-29 Perforation 5104.00 5104.50 8
2019-10-29 Multi-Stage Fracture 5104.00 5178.50 0
2019-10-29 Perforation 5089.00 5089.50 14
2019-10-29 Perforation 5074.40 5074.90 12
2019-10-22 Perforation 5400.50 5401.00 12
2019-10-29 Perforation 5059.50 5060.00 10
2019-10-29 Perforation 5044.70 5045.20 10
2019-10-29 Perforation 5028.90 5029.40 8
2019-10-29 Perforation 5015.10 5015.60 8
2019-10-29 Multi-Stage Fracture 5015.10 5089.50 0
2019-10-29 Perforation 5000.10 5000.60 16
2019-10-29 Perforation 4985.40 4985.90 12
2019-10-29 Perforation 4970.60 4971.10 14
2019-10-29 Perforation 4955.80 4956.30 10
2019-10-29 Perforation 4940.90 4941.40 10
2019-10-22 Perforation 5385.70 5386.20 12
2019-10-29 Perforation 4926.10 4926.60 8
2019-10-30 Multi-Stage Fracture 4926.10 5000.60 0
2019-10-30 Perforation 4911.10 4911.60 16
2019-10-30 Perforation 4896.50 4897.00 12
2019-10-30 Perforation 4881.60 4882.10 14
2019-10-30 Perforation 4866.80 4867.30 10
2019-10-30 Perforation 4852.00 4852.50 10
2019-10-30 Perforation 4837.20 4837.70 8
2019-10-30 Multi-Stage Fracture 4837.20 4911.60 0
2019-10-30 Perforation 4822.20 4822.70 14
2019-10-22 Perforation 5370.90 5371.40 12
2019-10-30 Perforation 4807.50 4808.00 12
2019-10-30 Perforation 4792.70 4793.20 10
2019-10-30 Perforation 4777.90 4778.40 10
2019-10-30 Perforation 4763.00 4763.50 8
2019-10-30 Perforation 4748.20 4748.70 8
2019-10-30 Multi-Stage Fracture 4748.20 4822.70 0
2019-10-31 Perforation 4733.20 4733.70 16
2019-10-31 Perforation 4718.60 4719.10 12
2019-10-31 Perforation 4703.70 4704.20 14
2019-10-31 Perforation 4688.90 4689.40 10
2019-10-27 Perforation 5355.90 5356.40 14
2019-10-31 Perforation 4674.10 4674.60 10
2019-10-31 Perforation 4659.20 4659.70 8
2019-10-31 Multi-Stage Fracture 4659.20 4733.70 0
2019-10-31 Perforation 4644.20 4644.70 16
2019-10-31 Perforation 4629.60 4630.10 12
2019-10-31 Perforation 4614.80 4615.30 14
2019-10-31 Perforation 4599.90 4600.40 10
2019-10-31 Perforation 4585.10 4585.60 10
2019-10-31 Perforation 4570.30 4570.80 8
2019-10-31 Multi-Stage Fracture 4570.30 4644.70 0
2019-10-27 Perforation 5341.20 5341.70 12
2019-10-31 Perforation 4555.30 4555.80 16
2019-10-31 Perforation 4540.60 4541.10 12
2019-10-31 Perforation 4525.80 4526.30 14
2019-10-31 Perforation 4511.00 4511.50 10
2019-10-31 Perforation 4496.20 4496.70 10
2019-10-31 Perforation 4481.30 4481.80 8
2019-10-31 Multi-Stage Fracture 4481.30 4555.80 0
2019-11-01 Perforation 4466.30 4466.80 16
2019-11-01 Perforation 4451.70 4452.20 12
2019-11-01 Perforation 4436.90 4437.40 14
2019-10-27 Perforation 5326.40 5326.90 10
2019-11-01 Perforation 4422.00 4422.50 10
2019-11-01 Perforation 4407.20 4407.70 10
2019-11-01 Perforation 4392.40 4392.90 8
2019-11-01 Multi-Stage Fracture 4392.40 4466.80 0
2019-11-01 Perforation 4377.40 4377.90 16
2019-11-01 Perforation 4361.70 4362.20 12
2019-11-01 Perforation 4347.90 4348.40 14
2019-11-01 Perforation 4333.10 4333.60 10
2019-11-01 Perforation 4318.30 4318.80 10
2019-11-01 Perforation 4303.40 4303.90 8
2019-10-27 Perforation 5311.60 5312.10 10
2019-11-01 Multi-Stage Fracture 4303.40 4377.90 0
2019-11-01 Perforation 4288.40 4288.90 16
2019-11-01 Perforation 4273.80 4274.30 12
2019-11-01 Perforation 4259.00 4259.50 14
2019-11-01 Perforation 4244.10 4244.60 10
2019-11-01 Perforation 4229.30 4229.80 10
2019-11-01 Perforation 4214.50 4215.00 8
2019-11-01 Multi-Stage Fracture 4214.50 4288.90 0
2019-11-01 Perforation 4199.50 4200.00 16
2019-11-01 Perforation 4184.80 4185.30 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-27 2019-11-06 3,091 50,485 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.139 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.8161 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.7043 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.127 N/A
Water 7732-18-5 100 0.127 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.008 N/A
Dibromoacetonitrile 3252-43-5 100 0.008 N/A
Polyethylene Glycol 25322-68-3 100 0.008 N/A
Sodium Bromide 7647-15-6 100 0.008 N/A
Water 7732-18-5 100 0.008 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0014 N/A
1-decanol 112-30-1 100 0.0014 N/A
1-octanol 111-87-5 100 0.0014 N/A
2-butoxy ethanol 111-76-2 100 0.0014 N/A
2-propanol 67-63-0 100 0.0014 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0014 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0014 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0014 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0014 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0014 N/A
Water 7732-18-5 100 0.0014 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
FraCare NE-04 BJ Services Demulsifier 2-Ethylhexanol 104-76-7 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Ethoxylated alcohol. branched 78330-20-8 100 0.0011 N/A
Heavy Aromatic Naphtha 64742-94-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
Naphthalene 91-20-3 100 0.0011 N/A
Organic Sulfonic Acid 10638 100 0.0011 N/A
Oxyalkylated Polymer 10638 100 0.0011 N/A
Polyalkylene glycol 10638 100 0.0011 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1528 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1528 N/A
Lecitihins. soya 8030-76-0 100 0.1528 N/A
polymer Trade Secret 100 0.1528 N/A
Water 7732-18-5 100 0.1528 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0022 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0212 N/A
Water 7732-18-5 100 0.0212 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 851 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-16 Lost Circulation 2141.00 2248.00
2019-09-28 Lost Circulation 5498.00 5498.00
2020-01-19 No Incident Encountered 0.00 0.00
2019-12-06 No Incident Encountered 0.00 0.00

For data sources see[9]

References