X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625180404000

Well Details

Well ID: 0625180404000
Loading map...
Location: 00/04-04-062-18W5/0
Location Alias: 00/04-04-62-18 W5M
Location Alias 2: 00/04-04-062-18 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 18
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT HZ FOXCK 4-4-62-18
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0442478
License Date: 2012-01-06
License Status: Suspension
Spud Date: 2012-01-27
Final Drill Date: 2012-02-06
Well Total Depth: 3570.00 m
Surface Hole Latitude: 54.331808
Surface Hole Longitude: -116.621648

For data sources see[1][2]

Well History

Date Event
2012-01-06 Obtained License
2012-01-29 Surface Casing Operation Performed
2012-01-31 Direction Drilling Operation Performed - Horizontal
2012-02-06 Finished Drilling
2012-02-06 Well Log Performed
2012-02-06 Well Mode changed to Drilled and Cased
2012-02-09 Production Casing Operation Performed
2012-02-10 Rig Released
2012-02-20 Well Log Performed
2012-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-27 Well Began Production
2012-06-27 Well Fluid changed to Gas
2012-06-27 Well Mode changed to Flowing
2015-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-12 Plug Back Performed
2015-02-12 Well Fluid changed to Gas
2015-02-12 Well Mode changed to Abandoned Zone
2016-09-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-09-11 Well Fluid changed to Gas
2016-09-11 Well Mode changed to Flowing
2016-09-16 Well Fluid changed to Gas
2016-09-16 Well Mode changed to Suspended
2017-10-20 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-27 Savanna Drilling Corp. 604 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-31 1606.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-25 Multi-Stage Fracture 3527.30 3527.40 0
2012-02-26 Multi-Stage Fracture 2642.70 2642.80 0
2012-02-26 Multi-Stage Fracture 2555.60 2555.70 0
2012-02-26 Multi-Stage Fracture 2509.50 2509.60 0
2012-02-26 Multi-Stage Fracture 2463.10 2463.20 0
2012-02-26 Multi-Stage Fracture 2417.40 2417.50 0
2012-02-26 Multi-Stage Fracture 2373.90 2374.00 0
2012-02-26 Multi-Stage Fracture 2327.50 2327.60 0
2012-02-26 Multi-Stage Fracture 2281.10 2281.20 0
2012-02-26 Multi-Stage Fracture 2234.60 2234.70 0
2015-02-12 Packing Device Capped w/Cement 2171.00 2193.00 0
2012-02-25 Multi-Stage Fracture 3433.00 3433.10 0
2016-09-11 Hydra Jet Perforation 3527.30 3527.40 0
2016-09-11 Hydra Jet Perforation 3433.00 3433.10 0
2016-09-11 Hydra Jet Perforation 3333.80 3333.90 0
2016-09-11 Hydra Jet Perforation 3234.10 3234.20 0
2016-09-11 Hydra Jet Perforation 3132.60 3132.70 0
2016-09-11 Hydra Jet Perforation 3031.20 3031.30 0
2016-09-11 Hydra Jet Perforation 2931.90 2932.00 0
2016-09-11 Hydra Jet Perforation 2830.50 2830.60 0
2016-09-11 Hydra Jet Perforation 2729.40 2729.50 0
2016-09-11 Hydra Jet Perforation 2642.70 2642.80 0
2012-02-25 Multi-Stage Fracture 3333.80 3333.90 0
2016-09-11 Hydra Jet Perforation 2555.60 2555.70 0
2016-09-11 Hydra Jet Perforation 2509.50 2509.60 0
2016-09-11 Hydra Jet Perforation 2463.10 2463.20 0
2016-09-11 Hydra Jet Perforation 2417.40 2417.50 0
2016-09-11 Hydra Jet Perforation 2373.90 2374.00 0
2016-09-11 Hydra Jet Perforation 2327.50 2327.60 0
2016-09-11 Hydra Jet Perforation 2281.10 2281.20 0
2016-09-11 Hydra Jet Perforation 2234.60 2234.70 0
2012-02-25 Multi-Stage Fracture 3234.10 3234.20 0
2012-02-25 Multi-Stage Fracture 3132.60 3132.70 0
2012-02-25 Multi-Stage Fracture 3031.20 3031.30 0
2012-02-25 Multi-Stage Fracture 2931.90 2932.00 0
2012-02-25 Multi-Stage Fracture 2830.50 2830.60 0
2012-02-25 Multi-Stage Fracture 2729.40 2729.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2256 0.0 0.0 0.0
2013 3535 0.0 0.0 0.0
2016 48 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-14 No Incident Encountered 0.00 0.00
2016-09-15 No Incident Encountered 0.00 0.00
2017-10-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References