X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625161710000

Well Details

Well ID: 0625161710000
Loading map...
Location: 00/10-17-062-16W5/0
Location Alias: 00/10-17-62-16 W5M
Location Alias 2: 00/10-17-062-16 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 16
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY A3 TWOCK 10-17-62-16
Operator Name: Paramount Resources Ltd.
License Number: 0058696
License Date: 1976-06-14
License Status: Suspension
Spud Date: 1976-07-13
Final Drill Date: 1976-08-19
Well Total Depth: 3067.80 m
Surface Hole Latitude: 54.365991
Surface Hole Longitude: -116.358144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-14 Obtained License
1976-07-27 Lost Circulation Occurred
1976-08-15 Drill Stem Test Performed
1976-08-16 Drill Stem Test Performed
1976-08-19 Finished Drilling
1976-08-28 Drill Stem Test Performed
1976-09-01 Drill Stem Test Performed
1976-09-03 Production Casing Operation Performed
1976-12-28 Perforation Treatment Performed - Jet Perforation
1976-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-31 Perforation Treatment Performed - Jet Perforation
1977-01-07 Well Mode changed to Drilled and Cased
1979-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-12 Well Mode changed to Abandoned Zone
1979-10-13 Perforation Treatment Performed - Jet Perforation
1979-10-15 Perforation Treatment Performed - Cement Squeeze
1979-10-18 Perforation Treatment Performed - Jet Perforation
1988-08-31 Perforation Treatment Performed - Jet Perforation
1988-08-31 Well Log Performed
1988-09-01 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-28 Perforation 2965.70 2967.50 3
1988-08-31 Perforation 1835.00 1840.00 13
1988-09-01 Fracture 1835.00 1840.00 0
1976-12-28 Perforation 2982.80 2985.80 3
1976-12-29 Acid Treatment 2965.70 2985.80 0
1976-12-31 Perforation 2998.00 3001.70 7
1976-12-31 Acid Treatment 2965.70 3001.70 0
1979-10-12 Packing Device Capped w/Cement 2918.50 2918.50 0
1979-10-13 Perforation 1860.00 1860.70 3
1979-10-15 Cement Squeeze 1860.00 1860.70 0
1979-10-18 Perforation 1835.00 1840.00 3

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-07-27 Lost Circulation 1979.40 2163.50

For data sources see[5]

References