X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625121108002

Well Details

Well ID: 0625121108002
Loading map...
Location: 00/08-11-062-12W5/2
Location Alias: 00/08-11-62-12 W5M
Location Alias 2: 00/08-11-062-12 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 11
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 8-11-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0084132
License Date: 1980-07-14
License Status: Issued
Spud Date: 1980-09-16
Final Drill Date: 1980-10-25
Well Total Depth: 2724.00 m
Surface Hole Latitude: 54.345928
Surface Hole Longitude: -115.680105

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-14 Obtained License
1980-10-25 Finished Drilling
1980-10-25 Well Mode changed to Drilled and Cased
1980-10-26 Drill Stem Test Performed
1980-10-28 Production Casing Operation Performed
1980-11-21 Perforation Treatment Performed - Jet Perforation
1980-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-24 Perforation Treatment Performed - Jet Perforation
1983-02-27 Perforation Treatment Performed - Cement Squeeze
1983-03-03 Perforation Treatment Performed - Cement Squeeze
1983-03-05 Perforation Treatment Performed - Jet Perforation
1983-03-06 Perforation Treatment Performed - Fractured
1983-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-02 Perforation Treatment Performed - Jet Perforation
1983-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-09 Well Began Production
1983-09-09 Well Fluid changed to Crude Oil
1983-09-09 Well Mode changed to Flowing
1984-06-21 Well Log Performed
1984-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-13 Plug Back Performed
1984-11-13 Well Fluid changed to Crude Oil
1984-11-13 Well Log Performed
1984-11-13 Well Mode changed to Flowing
1990-06-14 Well Log Performed
1992-08-01 Well Structure changed to Commingled
2007-05-13 Well Log Performed
2017-03-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-21 Perforation 2668.00 2671.00 13
1983-03-03 Cement Squeeze 2668.00 2706.00 0
1983-03-05 Perforation 2691.00 2698.00 13
1983-03-05 Perforation 2681.00 2682.50 13
1983-03-05 Perforation 2678.00 2680.00 13
1983-03-05 Perforation 2674.50 2676.50 13
1983-03-05 Perforation 2668.00 2671.00 13
1983-03-06 Fracture 2668.00 2698.00 0
1983-03-10 Acid Treatment 2668.00 2698.00 0
1983-09-02 Perforation 2648.00 2656.00 13
1983-09-02 Perforation 2657.00 2658.30 13
1980-11-21 Perforation 2674.50 2676.50 13
1983-09-03 Acid Treatment 2648.00 2658.30 0
1984-11-13 Packing Device Capped w/Cement 2661.00 2665.00 0
1980-11-21 Perforation 2678.00 2680.00 13
1980-11-21 Perforation 2681.00 2682.50 13
1980-11-21 Perforation 2695.00 2699.00 13
1980-11-21 Perforation 2702.00 2706.00 13
1980-11-22 Acid Treatment 2668.00 2706.00 0
1983-02-24 Perforation 2691.50 2695.50 13
1983-02-27 Cement Squeeze 2702.00 2706.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2499 0.0 0.0 0.0
1984 7085 0.0 0.0 0.0
1985 6968 0.0 0.0 0.0
1986 5833 0.0 0.0 0.0
1987 7393 0.0 0.0 0.0
1988 8599 0.0 0.0 0.0
1989 8089 0.0 0.0 0.0
1990 8006 0.0 0.0 0.0
1991 8415 0.0 0.0 0.0
1992 4873 0.0 0.0 0.0

For data sources see[5]

References