X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625113114002

Well Details

Well ID: 0625113114002
Loading map...
Location: 00/14-31-062-11W5/2
Location Alias: 00/14-31-62-11 W5M
Location Alias 2: 00/14-31-062-11 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 31
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCKS 14-31-62-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0018691
License Date: 1960-02-11
License Status: Suspension
Spud Date: 1960-02-13
Final Drill Date: 1960-03-28
Well Total Depth: 2868.20 m
Surface Hole Latitude: 54.412182
Surface Hole Longitude: -115.642249

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-02-11 Obtained License
1960-02-26 Drill Stem Test Performed
1960-03-19 Drill Stem Test Performed
1960-03-21 Drill Stem Test Performed
1960-03-23 Drill Stem Test Performed
1960-03-25 Drill Stem Test Performed
1960-03-26 Drill Stem Test Performed
1960-03-28 Finished Drilling
1960-03-31 Production Casing Operation Performed
1960-12-08 Perforation Treatment Performed - Jet Perforation
1960-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-12 Perforation Treatment Performed - Jet Perforation
1960-12-21 Perforation Treatment Performed - Cement Squeeze
1960-12-27 Perforation Treatment Performed - Jet Perforation
1970-07-07 Perforation Treatment Performed - Jet Perforation
1970-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-08 Perforation Treatment Performed - Acid Wash - No Pressure
1970-07-08 Well Mode changed to Drilled and Cased
1970-07-22 Perforation Treatment Performed - Jet Perforation
1970-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-12 Perforation Treatment Performed - Cement Squeeze
1976-10-13 Perforation Treatment Performed - Cement Squeeze
1976-10-25 Perforation Treatment Performed - Jet Perforation
1977-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-04-01 Well Began Production
1978-04-01 Well Fluid changed to Crude Oil
1978-04-01 Well Mode changed to Pumping
1979-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-04 Perforation Treatment Performed - Jet Perforation
1979-12-04 Well Fluid changed to Crude Oil
1979-12-04 Well Mode changed to Abandoned Zone
1979-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-31 Well Log Performed
1998-09-05 Well Log Performed
2012-09-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-12-08 Perforation 1828.20 1829.40 13
1970-07-08 Acid Wash 2762.40 2767.60 0
1970-07-08 Acid Treatment 2762.40 2767.60 0
1970-07-22 Perforation 2777.90 2780.40 7
1970-07-24 Acid Treatment 2777.90 2780.40 0
1976-10-12 Cement Squeeze 2743.50 2780.40 0
1976-10-13 Cement Squeeze 2743.50 2753.90 0
1976-10-25 Perforation 2762.40 2764.80 7
1976-10-25 Perforation 2765.50 2767.60 7
1977-01-25 Acid Treatment 2762.40 2767.60 0
1979-12-04 Packing Device Capped w/Cement 2760.00 2760.00 0
1960-12-12 Perforation 1823.90 1824.50 7
1979-12-04 Perforation 2743.50 2747.50 13
1979-12-04 Perforation 2750.20 2754.20 13
1979-12-05 Acid Treatment 2743.50 2754.20 0
1960-12-12 Perforation 1825.10 1826.70 7
1960-12-12 Acid Treatment 1823.90 1829.40 0
1960-12-21 Cement Squeeze 1823.90 1829.40 0
1960-12-27 Perforation 2743.50 2747.50 7
1960-12-27 Perforation 2750.20 2753.90 7
1970-07-07 Perforation 2762.40 2764.80 7
1970-07-07 Perforation 2765.50 2767.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 824 0.0 0.0 0.0

For data sources see[5]

References