X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624241513000

Well Details

Well ID: 0624241513000
Loading map...
Location: 00/13-15-062-24W4/0
Location Alias: 00/13-15-62-24 W4M
Location Alias 2: 00/13-15-062-24 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 24
Section: 15
County/Municipality: Athabasca County
Well Name: CNRL ROCHSTR 13-15-62-24
Operator Name: Canadian Natural Resources Limited
License Number: 0188860
License Date: 1996-06-20
License Status: Issued
Spud Date: 1996-07-08
Final Drill Date: 1996-07-10
Well Total Depth: 853.00 m
Surface Hole Latitude: 54.367099
Surface Hole Longitude: -113.523696

For data sources see[1][2]

Well History

Date Event
1996-06-20 Obtained License
1996-07-08 Surface Casing Operation Performed
1996-07-10 Finished Drilling
1996-07-10 Lost Circulation Occurred
1996-07-10 Well Log Performed
1996-07-10 Well Mode changed to Drilled and Cased
1996-07-11 Rig Released
1996-07-11 Well Log Performed
1996-08-17 Perforation Treatment Performed - Jet Perforation
1996-09-14 Well Began Production
1996-09-14 Well Fluid changed to Gas
1996-09-14 Well Mode changed to Flowing
1996-11-15 Perforation Treatment Performed - Jet Perforation
1996-11-16 Perforation Treatment Performed - Jet Perforation
1997-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-04 Perforation Treatment Performed - Jet Perforation
1997-07-04 Well Fluid changed to Gas
1997-07-04 Well Mode changed to Abandoned Zone
1997-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-06 Perforation Treatment Performed - Jet Perforation
2004-05-20 Perforation Treatment Performed - Jet Perforation
2004-05-20 Well Log Performed
2004-05-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-17 Perforation 835.50 836.50 13
1997-07-06 Perforation 649.00 650.00 13
2004-05-20 Perforation 616.50 617.40 17
2004-05-29 Fracture 616.50 617.40 0
1996-08-17 Perforation 777.00 778.00 13
1996-11-15 Perforation 829.00 830.00 13
1996-11-16 Perforation 826.00 827.00 13
1996-11-16 Perforation 830.00 830.50 13
1997-07-04 Packing Device Capped w/Cement 815.00 823.00 0
1997-07-04 Perforation 800.00 801.00 13
1997-07-04 Perforation 778.00 778.50 13
1997-07-05 Packing Device Capped w/Cement 787.00 795.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1805 0.0 0.0 0.0
1997 3144 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-07-10 Lost Circulation 853.00 853.00

For data sources see[6]

References