If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0624241301002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.35831,"lon":-113.452644,"icon":""}]} |
| Location: 00/01-13-062-24W4/2 | |
| Location Alias: 00/01-13-62-24 W4M | |
| Location Alias 2: 00/01-13-062-24 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 13 | |
| County/Municipality: Athabasca County | |
| Well Name: CNRES ROCHESTER 1-13-62-24 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0188194 | |
| License Date: 1996-05-30 | |
| License Status: RecCertified | |
| Spud Date: 1996-06-01 | |
| Final Drill Date: 1996-06-05 | |
| Well Total Depth: 828.50 m | |
| Surface Hole Latitude: 54.358310 | |
| Surface Hole Longitude: -113.452644 |
| Date | Event |
|---|---|
| 1996-05-30 | Obtained License |
| 1996-06-01 | Well Log Performed |
| 1996-06-02 | Surface Casing Operation Performed |
| 1996-06-03 | Direction Drilling Operation Performed - Deviate |
| 1996-06-05 | Finished Drilling |
| 1996-06-05 | Well Log Performed |
| 1996-06-05 | Well Mode changed to Drilled and Cased |
| 1996-06-07 | Production Casing Operation Performed |
| 1996-06-07 | Rig Released |
| 1996-06-08 | Well Log Performed |
| 1996-06-09 | Well Log Performed |
| 1996-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-06-10 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-10 | Well Log Performed |
| 1996-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-06-11 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-11 | Plug Back Performed |
| 1996-06-11 | Well Log Performed |
| 1996-06-13 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-13 | Perforation Treatment Performed - Remedial Casing |
| 1996-06-15 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-15 | Well Log Performed |
| 1996-06-19 | Well Log Performed |
| 1996-08-08 | Well Began Production |
| 1996-08-08 | Well Fluid changed to Gas |
| 1996-08-08 | Well Mode changed to Flowing |
| 1997-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-06-22 | Plug Back Performed |
| 1997-06-22 | Well Log Performed |
| 1997-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-06-23 | Perforation Treatment Performed - Jet Perforation |
| 1997-06-23 | Plug Back Performed |
| 1997-06-23 | Well Log Performed |
| 1998-07-22 | Well Log Performed |
| 1998-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-07-23 | Perforation Treatment Performed - Cement Plug |
| 1998-07-23 | Perforation Treatment Performed - Cement Squeeze |
| 1998-07-23 | Plug Back Performed |
| 1998-09-29 | Well Log Performed |
| 1998-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-09-30 | Perforation Treatment Performed - Jet Perforation |
| 1998-09-30 | Perforation Treatment Performed - Remedial Casing |
| 1998-09-30 | Well Log Performed |
| 1998-10-07 | Perforation Treatment Performed - Cement Plug |
| 1998-10-07 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-07 | Perforation Treatment Performed - Remedial Casing |
| 1998-10-07 | Well Log Performed |
| 2000-07-26 | Perforation Treatment Performed - Jet Perforation |
| 2000-07-26 | Well Log Performed |
| 2000-07-27 | Perforation Treatment Performed - Remedial Casing |
| 2000-08-03 | Well Abandoned |
| 2000-08-03 | Well Fluid changed to Gas |
| 2000-08-03 | Well Mode changed to Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-06-03 | 302.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-06-10 | Perforation | 820.50 | 822.00 | 13 |
| 1997-06-22 | Packing Device Capped w/Cement | 782.00 | 790.00 | 0 |
| 1997-06-23 | Packing Device Capped w/Cement | 732.00 | 740.00 | 0 |
| 1997-06-23 | Perforation | 627.50 | 629.00 | 13 |
| 1997-06-23 | Perforation | 583.50 | 585.00 | 13 |
| 1998-07-23 | Acid Treatment | 583.50 | 585.00 | 0 |
| 1998-07-23 | Cement Squeeze | 583.50 | 585.00 | 0 |
| 1998-07-23 | Cement Plug | 582.50 | 600.00 | 0 |
| 1998-09-30 | Perforation | 377.00 | 377.30 | 14 |
| 1998-09-30 | Perforation | 425.00 | 425.30 | 14 |
| 1998-09-30 | Acid Treatment | 425.00 | 425.30 | 0 |
| 1996-06-10 | Perforation | 824.00 | 826.00 | 13 |
| 1998-09-30 | Remedial Casing Cementing | 425.00 | 425.30 | 0 |
| 1998-09-30 | Packing Device Capped w/Cement | 418.50 | 424.50 | 0 |
| 1998-10-07 | Perforation | 398.00 | 399.00 | 14 |
| 1998-10-07 | Remedial Casing Cementing | 398.00 | 399.00 | 0 |
| 1998-10-07 | Remedial Casing Cementing | 377.00 | 377.30 | 0 |
| 1998-10-07 | Cement Plug | 343.00 | 377.90 | 0 |
| 2000-07-26 | Perforation | 272.00 | 275.00 | 17 |
| 2000-07-27 | Remedial Casing Cementing | 272.00 | 275.00 | 0 |
| 1996-06-10 | Acid Treatment | 820.50 | 826.00 | 0 |
| 1996-06-11 | Packing Device Capped w/Cement | 810.00 | 818.00 | 0 |
| 1996-06-11 | Perforation | 798.00 | 799.00 | 13 |
| 1996-06-11 | Perforation | 800.00 | 801.50 | 13 |
| 1996-06-13 | Perforation | 375.00 | 376.00 | 13 |
| 1996-06-13 | Remedial Casing Cementing | 375.00 | 376.00 | 0 |
| 1996-06-15 | Perforation | 745.00 | 746.50 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1996 | 3416 | 0.0 | 0.0 | 0.0 |
| 1997 | 2624 | 0.0 | 0.0 | 0.0 |
For data sources see[6]