X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624170507000

Well Details

Well ID: 0624170507000
Loading map...
Location: 00/07-05-062-17W4/0
Location Alias: 00/07-05-62-17 W4M
Location Alias 2: 00/07-05-062-17 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 17
Section: 05
County/Municipality: Smoky Lake County
Well Name: ACL FIGURE LAKE 7-5-62-17
Operator Name: Paramount Resources Ltd.
License Number: 0132409
License Date: 1988-02-19
License Status: Abandoned
Spud Date: 1988-02-21
Final Drill Date: 1988-02-23
Well Total Depth: 691.30 m
Surface Hole Latitude: 54.332269
Surface Hole Longitude: -112.507434

For data sources see[1][2]

Well History

Date Event
1988-02-19 Obtained License
1988-02-21 Surface Casing Operation Performed
1988-02-23 Drill Stem Test Performed
1988-02-23 Finished Drilling
1988-02-23 Well Log Performed
1988-02-24 Drill Stem Test Performed
1988-02-25 Production Casing Operation Performed
1988-02-25 Rig Released
1988-03-03 Perforation Treatment Performed - Open-Hole Completion
1988-03-04 Well Mode changed to Drilled and Cased
1988-06-16 Well Mode changed to Drilled and Cased
1988-10-27 Well Began Production
1988-10-27 Well Fluid changed to Gas
1988-10-27 Well Mode changed to Flowing
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-07-08 Perforation Treatment Performed - Fractured
1989-09-16 Well Fluid changed to Gas
1989-09-16 Well Mode changed to Suspended
1991-10-08 Well Fluid changed to Gas
1991-10-08 Well Mode changed to Flowing
1992-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-12 Perforation Treatment Performed - Jet Perforation
1992-09-12 Plug Back Performed
1992-09-12 Well Abandoned
1992-09-12 Well Fluid changed to Gas
1992-09-12 Well Mode changed to Abandoned Zone
1992-09-14 Perforation Treatment Performed - Cement Squeeze
1992-09-14 Plug Back Performed
1992-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-03 Open Hole/Barefoot Completion 689.50 691.30 0
1989-06-16 Perforation 607.00 610.00 13
1989-07-08 Fracture 607.00 610.00 0
1992-09-12 Packing Device Capped w/Cement 666.00 674.00 0
1992-09-12 Packing Device Capped w/Cement 593.00 601.00 0
1992-09-12 Perforation 562.50 565.00 13
1992-09-14 Cement Squeeze 562.50 565.00 0
1992-09-16 Perforation 562.50 564.00 13
1992-09-16 Packing Device Capped w/Cement 547.00 555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 705 0.0 0.0 0.0
1989 1431 0.0 0.0 0.0
1991 971 0.0 0.0 0.0

For data sources see[5]

References