X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616063609000

Well Details

Well ID: 0616063609000
Loading map...
Location: 00/09-36-061-06W6/0
Location Alias: 00/09-36-61-06 W6M
Location Alias 2: 00/09-36-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 9-36-61-6
Operator Name: Tourmaline Oil Corp.
License Number: 0477974
License Date: 2015-11-30
License Status: Amended
Spud Date: 2016-01-05
Final Drill Date: 2016-01-29
Well Total Depth: 4491.00 m
Surface Hole Latitude: 54.320874
Surface Hole Longitude: -118.775690

For data sources see[1][2]

Well History

Date Event
2015-11-30 Obtained License
2016-01-06 Lost Circulation Occurred
2016-01-09 Surface Casing Operation Performed
2016-01-15 Intermediate Casing Operation Performed
2016-01-21 Direction Drilling Operation Performed - Deviate
2016-01-24 Direction Drilling Operation Performed - Horizontal
2016-01-25 Well Log Performed
2016-01-29 Finished Drilling
2016-01-29 Well Log Performed
2016-01-29 Well Mode changed to Drilled and Cased
2016-01-30 Well Log Performed
2016-02-01 Production Casing Operation Performed
2016-02-02 Rig Released
2016-03-10 Well Log Performed
2016-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-17 Well Began Production
2016-03-17 Well Fluid changed to Gas
2016-03-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-05 Precision Drilling Corporation 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-21 2912.00 Deviate (5 - 79 degrees)
2016-01-24 3236.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-03-15 Multi-Stage Fracture 4453.20 4453.30 0
2016-03-16 Multi-Stage Fracture 3919.40 3919.50 0
2016-03-16 Multi-Stage Fracture 3859.90 3860.00 0
2016-03-16 Multi-Stage Fracture 3801.00 3801.10 0
2016-03-16 Multi-Stage Fracture 3741.50 3741.60 0
2016-03-16 Multi-Stage Fracture 3682.00 3682.10 0
2016-03-16 Multi-Stage Fracture 3622.60 3622.70 0
2016-03-16 Multi-Stage Fracture 3563.10 3563.20 0
2016-03-16 Multi-Stage Fracture 3503.60 3503.70 0
2016-03-16 Multi-Stage Fracture 3444.20 3444.30 0
2016-03-16 Multi-Stage Fracture 3385.00 3385.10 0
2016-03-15 Multi-Stage Fracture 4393.00 4393.10 0
2016-03-16 Multi-Stage Fracture 3326.10 3326.20 0
2016-03-16 Multi-Stage Fracture 3283.20 3283.30 0
2016-03-15 Multi-Stage Fracture 4333.60 4333.70 0
2016-03-15 Multi-Stage Fracture 4274.20 4274.30 0
2016-03-15 Multi-Stage Fracture 4214.70 4214.80 0
2016-03-15 Multi-Stage Fracture 4156.10 4156.20 0
2016-03-16 Multi-Stage Fracture 4096.70 4096.80 0
2016-03-16 Multi-Stage Fracture 4037.70 4037.80 0
2016-03-16 Multi-Stage Fracture 3978.80 3978.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-15 2016-03-16 3,120 5,688 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.9805 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.7392 N/A
silica crystalline 14808-60-7 100 4.7392 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.8096 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.2421 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0104 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0104 N/A
sodium bromide 7647-15-6 100 0.0104 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0903 N/A
water Not Available 100 0.0903 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0873 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0873 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0873 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0873 N/A
non-hazardous ingredients Not Available 100 0.0873 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0403 N/A
methanol 67-56-1 100 0.0403 N/A
water Not Available 100 0.0403 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-03-14 2016-03-15 Recycled Fracturing Water (treated at well site) 1090
2016-03-03 2016-03-09 Surface Water - River 4184

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6820 0.0 0.0 0.0
2017 8646 0.0 0.0 0.0
2018 8001 0.0 0.0 0.0
2019 8599 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-06 Lost Circulation 113.00 113.00
2016-03-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References