If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616062904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.299852,"lon":-118.840761,"icon":""}]} |
Location: 00/04-29-061-06W6/0 | |
Location Alias: 00/04-29-61-06 W6M | |
Location Alias 2: 00/04-29-061-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 06 | |
Section: 29 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ KAKWA 4-29-61-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0476105 | |
License Date: 2015-07-13 | |
License Status: Issued | |
Spud Date: 2015-11-10 | |
Final Drill Date: 2015-12-06 | |
Well Total Depth: 5216.00 m | |
Surface Hole Latitude: 54.299852 | |
Surface Hole Longitude: -118.840761 |
Date | Event |
---|---|
2015-07-13 | Obtained License |
2015-11-11 | Direction Drilling Operation Performed - Deviate |
2015-11-11 | Surface Casing Operation Performed |
2015-11-16 | Intermediate Casing Operation Performed |
2015-11-24 | Direction Drilling Operation Performed - Horizontal |
2015-11-26 | Well Log Performed |
2015-12-06 | Finished Drilling |
2015-12-06 | Well Log Performed |
2015-12-06 | Well Mode changed to Drilled and Cased |
2015-12-10 | Production Casing Operation Performed |
2015-12-11 | Rig Released |
2016-01-23 | Well Log Performed |
2016-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-04 | Well Began Production |
2016-02-04 | Well Fluid changed to Gas |
2016-02-04 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-11-10 | Precision Drilling Corporation | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-11-11 | 415.90 | Deviate (5 - 79 degrees) |
2015-11-24 | 3332.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-01-29 | Multi-Stage Fracture | 5178.70 | 5178.80 | 0 |
2016-01-29 | Multi-Stage Fracture | 4644.80 | 4644.90 | 0 |
2016-01-30 | Multi-Stage Fracture | 4585.80 | 4585.90 | 0 |
2016-01-30 | Multi-Stage Fracture | 4526.40 | 4526.50 | 0 |
2016-01-30 | Multi-Stage Fracture | 4466.90 | 4467.00 | 0 |
2016-01-30 | Multi-Stage Fracture | 4407.30 | 4407.40 | 0 |
2016-01-30 | Multi-Stage Fracture | 4347.70 | 4347.80 | 0 |
2016-01-30 | Multi-Stage Fracture | 4288.30 | 4288.40 | 0 |
2016-01-30 | Multi-Stage Fracture | 4229.00 | 4229.10 | 0 |
2016-01-30 | Multi-Stage Fracture | 4169.40 | 4169.50 | 0 |
2016-01-30 | Multi-Stage Fracture | 4109.90 | 4110.00 | 0 |
2016-01-29 | Multi-Stage Fracture | 5117.80 | 5117.90 | 0 |
2016-01-30 | Multi-Stage Fracture | 4051.20 | 4051.30 | 0 |
2016-01-30 | Multi-Stage Fracture | 3991.60 | 3991.70 | 0 |
2016-01-30 | Multi-Stage Fracture | 3932.60 | 3932.70 | 0 |
2016-01-30 | Multi-Stage Fracture | 3873.60 | 3873.70 | 0 |
2016-01-30 | Multi-Stage Fracture | 3815.00 | 3815.10 | 0 |
2016-01-30 | Multi-Stage Fracture | 3755.80 | 3755.90 | 0 |
2016-01-30 | Multi-Stage Fracture | 3696.20 | 3696.30 | 0 |
2016-01-30 | Multi-Stage Fracture | 3636.80 | 3636.90 | 0 |
2016-01-31 | Multi-Stage Fracture | 3577.60 | 3577.70 | 0 |
2016-01-31 | Multi-Stage Fracture | 3518.20 | 3518.30 | 0 |
2016-01-29 | Multi-Stage Fracture | 5059.60 | 5059.70 | 0 |
2016-01-31 | Multi-Stage Fracture | 3458.70 | 3458.80 | 0 |
2016-01-31 | Multi-Stage Fracture | 3399.20 | 3399.30 | 0 |
2016-01-29 | Multi-Stage Fracture | 5000.10 | 5000.20 | 0 |
2016-01-29 | Multi-Stage Fracture | 4941.30 | 4941.40 | 0 |
2016-01-29 | Multi-Stage Fracture | 4882.00 | 4882.10 | 0 |
2016-01-29 | Multi-Stage Fracture | 4822.50 | 4822.60 | 0 |
2016-01-29 | Multi-Stage Fracture | 4763.10 | 4763.20 | 0 |
2016-01-29 | Multi-Stage Fracture | 4704.00 | 4704.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-29 | 2016-01-31 | 3,266 | 9,689 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 84.8223 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.1199 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 4.1199 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 9.4042 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.3296 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0106 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0106 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0106 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.155 | N/A | |
water | Not Available | 100 | 0.155 | N/A | ||||
FR-9 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0882 | N/A | |
alcohols. C12-14. ethoxylated | 68439-50-9 | 100 | 0.0882 | N/A | ||||
alcohols. C12-16. ethoxylated | 68551-12-2 | 100 | 0.0882 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0882 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0882 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0699 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0699 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0699 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0699 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0699 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-01-18 | 2016-01-24 | Recycled Fracturing Water (treated at well site) | 1105 |
2016-01-20 | 2016-01-20 | Recycled Fracturing Water (treated at well site) | 895 |
2016-01-29 | 2016-02-01 | Surface Water - River | 5000 |
2016-01-19 | 2016-01-21 | Surface Water - Runoff | 2690 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 7512 | 0.0 | 0.0 | 0.0 |
2017 | 8623 | 0.0 | 0.0 | 0.0 |
2018 | 8032 | 0.0 | 0.0 | 0.0 |
2019 | 8477 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-12-11 | No Incident Encountered | 0.00 | 0.00 |
2016-02-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]