If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616062816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.299943,"lon":-118.826016,"icon":""}]} |
Location: 00/16-28-061-06W6/0 | |
Location Alias: 00/16-28-61-06 W6M | |
Location Alias 2: 00/16-28-061-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 06 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE ET AL HZ KAKWA 16-28-61-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0439142 | |
License Date: 2011-11-17 | |
License Status: Issued | |
Spud Date: 2012-01-19 | |
Final Drill Date: 2012-02-23 | |
Well Total Depth: 4236.00 m | |
Surface Hole Latitude: 54.299943 | |
Surface Hole Longitude: -118.826016 |
Date | Event |
---|---|
2011-11-17 | Obtained License |
2012-01-20 | Lost Circulation Occurred |
2012-01-25 | Surface Casing Operation Performed |
2012-01-27 | Lost Circulation Occurred |
2012-02-01 | Intermediate Casing Operation Performed |
2012-02-07 | Direction Drilling Operation Performed - Horizontal |
2012-02-07 | Well Log Performed |
2012-02-15 | Well Log Performed |
2012-02-23 | Finished Drilling |
2012-02-23 | Well Mode changed to Drilled and Cased |
2012-02-28 | Production Casing Operation Performed |
2012-02-29 | Rig Released |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-17 | Well Began Production |
2012-03-17 | Well Fluid changed to Gas |
2012-03-17 | Well Mode changed to Flowing |
2013-08-24 | Well Fluid changed to Gas |
2013-08-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-19 | Patterson-UTI Drilling Co. Canada | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-07 | 2867.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-14 | Multi-Stage Fracture | 4192.60 | 4195.20 | 0 |
2012-03-16 | Multi-Stage Fracture | 3590.10 | 3590.20 | 0 |
2012-03-16 | Multi-Stage Fracture | 3520.20 | 3520.30 | 0 |
2012-03-16 | Multi-Stage Fracture | 3464.40 | 3464.50 | 0 |
2012-03-16 | Multi-Stage Fracture | 3393.40 | 3393.50 | 0 |
2012-03-16 | Multi-Stage Fracture | 3322.40 | 3322.50 | 0 |
2012-03-16 | Multi-Stage Fracture | 3255.10 | 3255.20 | 0 |
2012-03-15 | Multi-Stage Fracture | 4132.90 | 4133.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 4060.30 | 4060.40 | 0 |
2012-03-15 | Multi-Stage Fracture | 3988.10 | 3988.20 | 0 |
2012-03-15 | Multi-Stage Fracture | 3928.90 | 3929.00 | 0 |
2012-03-15 | Multi-Stage Fracture | 3859.20 | 3859.30 | 0 |
2012-03-15 | Multi-Stage Fracture | 3789.40 | 3789.50 | 0 |
2012-03-15 | Multi-Stage Fracture | 3732.70 | 3732.80 | 0 |
2012-03-15 | Multi-Stage Fracture | 3660.10 | 3660.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5997 | 0.0 | 0.0 | 0.0 |
2013 | 6579 | 0.0 | 0.0 | 0.0 |
2014 | 6013 | 0.0 | 0.0 | 0.0 |
2015 | 7178 | 0.0 | 0.0 | 0.0 |
2016 | 6020 | 0.0 | 0.0 | 0.0 |
2017 | 2 | 0.0 | 0.0 | 0.0 |
2018 | 2622 | 0.0 | 0.0 | 0.0 |
2019 | 6527 | 0.0 | 0.0 | 0.0 |
2020 | 225 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-20 | Lost Circulation | 50.00 | 92.00 |
2012-01-27 | Lost Circulation | 656.00 | 680.00 |
2012-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]