X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616062413000

Well Details

Well ID: 0616062413000
Loading map...
Location: 00/13-24-061-06W6/0
Location Alias: 00/13-24-61-06 W6M
Location Alias 2: 00/13-24-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 13-24-61-6
Operator Name: Jupiter Resources Inc.
License Number: 0435792
License Date: 2011-08-05
License Status: Amended
Spud Date: 2012-05-30
Final Drill Date: 2012-07-04
Well Total Depth: 4972.00 m
Surface Hole Latitude: 54.285030
Surface Hole Longitude: -118.750015

For data sources see[1][2]

Well History

Date Event
2011-08-05 Obtained License
2012-06-01 Surface Casing Operation Performed
2012-06-03 Direction Drilling Operation Performed - Deviate
2012-06-12 Intermediate Casing Operation Performed
2012-06-15 Direction Drilling Operation Performed - Horizontal
2012-07-04 Finished Drilling
2012-07-04 Liner Casing Operation Performed
2012-07-04 Perforation Treatment Performed - Open-Hole Completion
2012-07-04 Well Mode changed to Drilled and Cased
2012-07-08 Rig Released
2012-10-16 Well Log Performed
2012-10-17 Well Log Performed
2012-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-12 Perforation Treatment Performed - Fractured
2012-11-12 Perforation Treatment Performed - Jet Perforation
2012-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-13 Perforation Treatment Performed - Fractured
2012-11-13 Perforation Treatment Performed - Jet Perforation
2012-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Perforation Treatment Performed - Fractured
2012-11-14 Perforation Treatment Performed - Jet Perforation
2012-11-15 Perforation Treatment Performed - Fractured
2012-11-15 Perforation Treatment Performed - Jet Perforation
2012-11-16 Perforation Treatment Performed - Fractured
2012-11-16 Perforation Treatment Performed - Jet Perforation
2012-11-17 Perforation Treatment Performed - Fractured
2012-11-17 Perforation Treatment Performed - Jet Perforation
2012-11-18 Perforation Treatment Performed - Fractured
2012-11-20 Well Fluid changed to Gas
2012-11-20 Well Mode changed to Testing
2012-11-21 Well Began Production
2012-11-21 Well Fluid changed to Gas
2012-11-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-30 Precision Drilling Corporation 530 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-03 701.30 Deviate (5 - 79 degrees)
2012-06-15 3134.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-04 Open Hole/Barefoot Completion 4962.00 4972.00 0
2012-11-13 Fracture 3956.90 3958.60 0
2012-11-13 Multi-Stage Fracture 3834.00 3834.80 0
2012-11-13 Multi-Stage Fracture 3706.00 3706.80 0
2012-11-13 Perforation 3587.30 3591.50 19
2012-11-14 Fracture 3587.30 3591.50 0
2012-11-14 Perforation 3459.90 3462.30 20
2012-11-15 Fracture 3459.90 3462.30 0
2012-11-15 Perforation 3331.80 3335.80 20
2012-11-16 Fracture 3331.80 3335.80 0
2012-11-16 Perforation 3218.40 3222.40 20
2012-10-25 Multi-Stage Fracture 4950.50 4951.80 0
2012-11-17 Fracture 3218.40 3222.40 0
2012-11-17 Perforation 3118.20 3122.20 20
2012-11-18 Fracture 3118.20 3122.20 0
2012-10-26 Multi-Stage Fracture 4704.70 4705.50 0
2012-10-27 Multi-Stage Fracture 4453.80 4454.60 0
2012-11-12 Perforation 4323.50 4326.50 20
2012-11-12 Fracture 4323.50 4326.50 0
2012-11-12 Multi-Stage Fracture 4201.80 4202.60 0
2012-11-12 Multi-Stage Fracture 4087.50 4088.30 0
2012-11-13 Perforation 3956.90 3958.60 18

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 916 0.0 0.0 0.0
2013 7652 0.0 0.0 0.0
2014 8617 0.0 0.0 0.0
2015 8703 0.0 0.0 0.0
2016 8453 0.0 0.0 0.0
2017 8427 0.0 0.0 0.0
2018 6027 0.0 0.0 0.0
2019 7843 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-09 No Incident Encountered 0.00 0.00
2012-11-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References