If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616062413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.28503,"lon":-118.750015,"icon":""}]} |
Location: 00/13-24-061-06W6/0 | |
Location Alias: 00/13-24-61-06 W6M | |
Location Alias 2: 00/13-24-061-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 06 | |
Section: 24 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER HZ KAKWA 13-24-61-6 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0435792 | |
License Date: 2011-08-05 | |
License Status: Amended | |
Spud Date: 2012-05-30 | |
Final Drill Date: 2012-07-04 | |
Well Total Depth: 4972.00 m | |
Surface Hole Latitude: 54.285030 | |
Surface Hole Longitude: -118.750015 |
Date | Event |
---|---|
2011-08-05 | Obtained License |
2012-06-01 | Surface Casing Operation Performed |
2012-06-03 | Direction Drilling Operation Performed - Deviate |
2012-06-12 | Intermediate Casing Operation Performed |
2012-06-15 | Direction Drilling Operation Performed - Horizontal |
2012-07-04 | Finished Drilling |
2012-07-04 | Liner Casing Operation Performed |
2012-07-04 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-04 | Well Mode changed to Drilled and Cased |
2012-07-08 | Rig Released |
2012-10-16 | Well Log Performed |
2012-10-17 | Well Log Performed |
2012-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-12 | Perforation Treatment Performed - Fractured |
2012-11-12 | Perforation Treatment Performed - Jet Perforation |
2012-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-13 | Perforation Treatment Performed - Fractured |
2012-11-13 | Perforation Treatment Performed - Jet Perforation |
2012-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-14 | Perforation Treatment Performed - Fractured |
2012-11-14 | Perforation Treatment Performed - Jet Perforation |
2012-11-15 | Perforation Treatment Performed - Fractured |
2012-11-15 | Perforation Treatment Performed - Jet Perforation |
2012-11-16 | Perforation Treatment Performed - Fractured |
2012-11-16 | Perforation Treatment Performed - Jet Perforation |
2012-11-17 | Perforation Treatment Performed - Fractured |
2012-11-17 | Perforation Treatment Performed - Jet Perforation |
2012-11-18 | Perforation Treatment Performed - Fractured |
2012-11-20 | Well Fluid changed to Gas |
2012-11-20 | Well Mode changed to Testing |
2012-11-21 | Well Began Production |
2012-11-21 | Well Fluid changed to Gas |
2012-11-21 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-05-30 | Precision Drilling Corporation | 530 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-03 | 701.30 | Deviate (5 - 79 degrees) |
2012-06-15 | 3134.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-04 | Open Hole/Barefoot Completion | 4962.00 | 4972.00 | 0 |
2012-11-13 | Fracture | 3956.90 | 3958.60 | 0 |
2012-11-13 | Multi-Stage Fracture | 3834.00 | 3834.80 | 0 |
2012-11-13 | Multi-Stage Fracture | 3706.00 | 3706.80 | 0 |
2012-11-13 | Perforation | 3587.30 | 3591.50 | 19 |
2012-11-14 | Fracture | 3587.30 | 3591.50 | 0 |
2012-11-14 | Perforation | 3459.90 | 3462.30 | 20 |
2012-11-15 | Fracture | 3459.90 | 3462.30 | 0 |
2012-11-15 | Perforation | 3331.80 | 3335.80 | 20 |
2012-11-16 | Fracture | 3331.80 | 3335.80 | 0 |
2012-11-16 | Perforation | 3218.40 | 3222.40 | 20 |
2012-10-25 | Multi-Stage Fracture | 4950.50 | 4951.80 | 0 |
2012-11-17 | Fracture | 3218.40 | 3222.40 | 0 |
2012-11-17 | Perforation | 3118.20 | 3122.20 | 20 |
2012-11-18 | Fracture | 3118.20 | 3122.20 | 0 |
2012-10-26 | Multi-Stage Fracture | 4704.70 | 4705.50 | 0 |
2012-10-27 | Multi-Stage Fracture | 4453.80 | 4454.60 | 0 |
2012-11-12 | Perforation | 4323.50 | 4326.50 | 20 |
2012-11-12 | Fracture | 4323.50 | 4326.50 | 0 |
2012-11-12 | Multi-Stage Fracture | 4201.80 | 4202.60 | 0 |
2012-11-12 | Multi-Stage Fracture | 4087.50 | 4088.30 | 0 |
2012-11-13 | Perforation | 3956.90 | 3958.60 | 18 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 916 | 0.0 | 0.0 | 0.0 |
2013 | 7652 | 0.0 | 0.0 | 0.0 |
2014 | 8617 | 0.0 | 0.0 | 0.0 |
2015 | 8703 | 0.0 | 0.0 | 0.0 |
2016 | 8453 | 0.0 | 0.0 | 0.0 |
2017 | 8427 | 0.0 | 0.0 | 0.0 |
2018 | 6027 | 0.0 | 0.0 | 0.0 |
2019 | 7843 | 0.0 | 0.0 | 0.0 |
2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-09 | No Incident Encountered | 0.00 | 0.00 |
2012-11-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]