X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616062303020

Well Details

Well ID: 0616062303020
Loading map...
Location: 02/03-23-061-06W6/0
Location Alias: 02/03-23-61-06 W6M
Location Alias 2: 02/03-23-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 3-23-61-6
Operator Name: Jupiter Resources Inc.
License Number: 0474471
License Date: 2015-02-03
License Status: Amended
Spud Date: 2015-03-02
Final Drill Date: 2015-06-17
Well Total Depth: 5963.00 m
Surface Hole Latitude: 54.298718
Surface Hole Longitude: -118.825907

For data sources see[1][2]

Well History

Date Event
2015-02-03 Obtained License
2015-03-02 Lost Circulation Occurred
2015-03-07 Surface Casing Operation Performed
2015-03-14 Intermediate Casing Operation Performed
2015-05-27 Well Log Performed
2015-05-29 Direction Drilling Operation Performed - Deviate
2015-06-03 Direction Drilling Operation Performed - Horizontal
2015-06-17 Finished Drilling
2015-06-17 Well Log Performed
2015-06-17 Well Mode changed to Drilled and Cased
2015-06-20 Production Casing Operation Performed
2015-06-23 Rig Released
2015-08-10 Well Log Performed
2015-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-15 Well Fluid changed to Gas
2015-09-15 Well Mode changed to Testing
2015-10-20 Well Began Production
2015-10-20 Well Fluid changed to Gas
2015-10-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-05-28 Nabors Drilling Limited 58 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-29 2782.00 Deviate (5 - 79 degrees)
2015-06-03 3163.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-30 Multi-Stage Fracture 5917.10 5917.20 0
2015-08-31 Multi-Stage Fracture 5206.10 5206.20 0
2015-09-01 Multi-Stage Fracture 5123.00 5123.10 0
2015-09-01 Multi-Stage Fracture 5051.50 5051.60 0
2015-09-01 Multi-Stage Fracture 4968.50 4968.60 0
2015-09-01 Multi-Stage Fracture 4897.50 4897.60 0
2015-09-01 Multi-Stage Fracture 4814.10 4814.20 0
2015-09-01 Multi-Stage Fracture 4730.60 4730.70 0
2015-09-01 Multi-Stage Fracture 4658.50 4658.60 0
2015-09-01 Multi-Stage Fracture 4575.00 4575.10 0
2015-09-02 Multi-Stage Fracture 4502.60 4502.70 0
2015-08-30 Multi-Stage Fracture 5833.60 5833.70 0
2015-09-02 Multi-Stage Fracture 4419.90 4420.00 0
2015-09-02 Multi-Stage Fracture 4336.60 4336.70 0
2015-09-02 Multi-Stage Fracture 4265.40 4265.50 0
2015-09-02 Multi-Stage Fracture 4181.90 4182.00 0
2015-09-02 Multi-Stage Fracture 4098.30 4098.40 0
2015-09-02 Multi-Stage Fracture 4026.80 4026.90 0
2015-09-02 Multi-Stage Fracture 3943.70 3943.80 0
2015-09-02 Multi-Stage Fracture 3872.30 3872.40 0
2015-09-03 Multi-Stage Fracture 3787.90 3788.00 0
2015-09-03 Multi-Stage Fracture 3548.50 3704.10 0
2015-08-30 Multi-Stage Fracture 5751.30 5751.40 0
2015-09-03 Multi-Stage Fracture 3321.40 3476.20 0
2015-08-31 Multi-Stage Fracture 5679.50 5679.60 0
2015-08-31 Multi-Stage Fracture 5597.00 5597.10 0
2015-08-31 Multi-Stage Fracture 5526.20 5526.30 0
2015-08-31 Multi-Stage Fracture 5442.70 5442.80 0
2015-08-31 Multi-Stage Fracture 5360.70 5360.80 0
2015-08-31 Multi-Stage Fracture 5289.80 5289.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-30 2015-09-03 3,086 16,464 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.59 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 4.1407 N/A
silica crystalline 14808-60-7 100 4.1407 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.1028 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8447 N/A
Myacide GA-50 Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.0095 N/A
non-hazardous ingredients Not Available 100 0.0095 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1819 N/A
water Not Available 100 0.1819 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0431 N/A
propylene glycol 57-55-6 100 0.0431 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.087 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.087 N/A
non-hazardous ingredients Not Available 100 0.087 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-15 2015-09-03 Surface Water - Runoff 16017
2015-08-15 2015-09-03 Recycled Fracturing Water (treated at well site) 536
2015-08-15 2015-09-03 Central Water Distribution Facility 311

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1822 0.0 0.0 0.0
2016 8307 0.0 0.0 0.0
2017 6778 0.0 0.0 0.0
2018 6036 0.0 0.0 0.0
2019 8567 0.0 0.0 0.0
2020 2122 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-02 Lost Circulation 68.00 152.00
2015-09-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References