X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616062116002

Well Details

Well ID: 0616062116002
Loading map...
Location: 00/16-21-061-06W6/2
Location Alias: 00/16-21-61-06 W6M
Location Alias 2: 00/16-21-061-06 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAKWA 16-21-61-6
Operator Name: Tourmaline Oil Corp.
License Number: 0461411
License Date: 2013-11-26
License Status: Issued
Spud Date: 2013-12-15
Final Drill Date: 2014-02-25
Well Total Depth: 4843.00 m
Surface Hole Latitude: 54.300517
Surface Hole Longitude: -118.852905

For data sources see[1][2]

Well History

Date Event
2013-11-26 Obtained License
2013-12-18 Surface Casing Operation Performed
2014-01-04 Well Log Performed
2014-01-05 Intermediate Casing Operation Performed
2014-01-10 Well Log Performed
2014-01-13 Lost Circulation Occurred
2014-01-16 Direction Drilling Operation Performed - Deviate
2014-01-25 Well Log Performed
2014-02-07 Direction Drilling Operation Performed - Horizontal
2014-02-08 Well Log Performed
2014-02-20 Well Log Performed
2014-02-25 Finished Drilling
2014-02-25 Well Mode changed to Drilled and Cased
2014-02-26 Well Log Performed
2014-03-02 Production Casing Operation Performed
2014-03-02 Well Log Performed
2014-03-03 Rig Released
2014-03-10 Well Log Performed
2014-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-12 Perforation Treatment Performed - Bridge Plug No Cement Required
2014-06-12 Well Log Performed
2014-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-13 Plug Back Performed
2014-06-13 Well Log Performed
2014-08-04 Perforation Treatment Performed - Jet Perforation
2014-08-04 Well Log Performed
2014-08-08 Perforation Treatment Performed - Fractured
2014-08-08 Well Log Performed
2014-08-09 Perforation Treatment Performed - Fractured
2014-08-09 Perforation Treatment Performed - Jet Perforation
2014-08-09 Well Log Performed
2014-08-10 Perforation Treatment Performed - Fractured
2014-08-10 Perforation Treatment Performed - Jet Perforation
2014-08-10 Well Log Performed
2014-09-03 Well Began Production
2014-09-03 Well Fluid changed to Gas
2014-09-03 Well Mode changed to Flowing
2015-03-23 Well Fluid changed to Gas
2015-03-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-01-16 3442.40 Deviate (5 - 79 degrees)
2014-02-07 4123.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-15 Multi-Stage Fracture 4815.20 4815.30 0
2014-03-16 Multi-Stage Fracture 4401.90 4402.00 0
2014-03-17 Multi-Stage Fracture 4356.50 4356.60 0
2014-03-17 Multi-Stage Fracture 4298.60 4298.70 0
2014-03-17 Multi-Stage Fracture 4253.20 4253.30 0
2014-03-17 Multi-Stage Fracture 4207.80 4207.90 0
2014-03-18 Multi-Stage Fracture 4162.30 4162.40 0
2014-03-18 Multi-Stage Fracture 4117.00 4117.10 0
2014-06-12 Bridge Plug, No Cement 4000.80 4001.20 0
2014-06-13 Packing Device Capped w/Cement 3845.00 3957.60 0
2014-08-04 Perforation 3539.00 3542.00 20
2014-03-15 Multi-Stage Fracture 4765.10 4765.20 0
2014-08-08 Fracture 3539.00 3542.00 0
2014-08-09 Perforation 3462.00 3464.00 20
2014-08-09 Fracture 3462.00 3464.00 0
2014-08-09 Perforation 3305.00 3306.00 20
2014-08-09 Fracture 3305.00 3306.00 0
2014-08-09 Perforation 2837.50 2838.50 20
2014-08-09 Fracture 2837.50 2838.50 0
2014-08-10 Perforation 2257.00 2258.00 8
2014-08-10 Perforation 2248.50 2249.50 8
2014-08-10 Fracture 2248.50 2258.00 0
2014-03-15 Multi-Stage Fracture 4719.90 4720.00 0
2014-03-15 Multi-Stage Fracture 4674.50 4674.60 0
2014-03-15 Multi-Stage Fracture 4629.20 4629.30 0
2014-03-16 Multi-Stage Fracture 4583.80 4583.90 0
2014-03-16 Multi-Stage Fracture 4538.20 4538.30 0
2014-03-16 Multi-Stage Fracture 4492.80 4492.90 0
2014-03-16 Multi-Stage Fracture 4447.40 4447.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1145 0.0 0.0 0.0
2015 6871 0.0 0.0 0.0
2016 7159 0.0 0.0 0.0
2017 8384 0.0 0.0 0.0
2018 6681 0.0 0.0 0.0
2019 7905 0.0 0.0 0.0
2020 2115 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-13 Lost Circulation 3335.00 3346.00
2014-06-18 No Incident Encountered 0.00 0.00
2014-08-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References