If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616062116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.300517,"lon":-118.852905,"icon":""}]} |
Location: 00/16-21-061-06W6/0 | |
Location Alias: 00/16-21-61-06 W6M | |
Location Alias 2: 00/16-21-061-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 06 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ KAKWA 16-21-61-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0461411 | |
License Date: 2013-11-26 | |
License Status: Issued | |
Spud Date: 2013-12-15 | |
Final Drill Date: 2014-02-25 | |
Well Total Depth: 4843.00 m | |
Surface Hole Latitude: 54.300517 | |
Surface Hole Longitude: -118.852905 |
Date | Event |
---|---|
2013-11-26 | Obtained License |
2013-12-18 | Surface Casing Operation Performed |
2014-01-04 | Well Log Performed |
2014-01-05 | Intermediate Casing Operation Performed |
2014-01-10 | Well Log Performed |
2014-01-13 | Lost Circulation Occurred |
2014-01-16 | Direction Drilling Operation Performed - Deviate |
2014-01-25 | Well Log Performed |
2014-02-07 | Direction Drilling Operation Performed - Horizontal |
2014-02-08 | Well Log Performed |
2014-02-20 | Well Log Performed |
2014-02-25 | Finished Drilling |
2014-02-25 | Well Mode changed to Drilled and Cased |
2014-02-26 | Well Log Performed |
2014-03-02 | Production Casing Operation Performed |
2014-03-02 | Well Log Performed |
2014-03-03 | Rig Released |
2014-03-10 | Well Log Performed |
2014-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-06-12 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2014-06-12 | Well Log Performed |
2014-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-13 | Plug Back Performed |
2014-06-13 | Well Log Performed |
2014-06-13 | Well Mode changed to Abandoned Zone |
2014-08-04 | Perforation Treatment Performed - Jet Perforation |
2014-08-04 | Well Log Performed |
2014-08-08 | Perforation Treatment Performed - Fractured |
2014-08-08 | Well Log Performed |
2014-08-09 | Perforation Treatment Performed - Fractured |
2014-08-09 | Perforation Treatment Performed - Jet Perforation |
2014-08-09 | Well Log Performed |
2014-08-10 | Perforation Treatment Performed - Fractured |
2014-08-10 | Perforation Treatment Performed - Jet Perforation |
2014-08-10 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-12-15 | Patterson-UTI Drilling Co. Canada | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-16 | 3442.40 | Deviate (5 - 79 degrees) |
2014-02-07 | 4123.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-15 | Multi-Stage Fracture | 4815.20 | 4815.30 | 0 |
2014-03-16 | Multi-Stage Fracture | 4401.90 | 4402.00 | 0 |
2014-03-17 | Multi-Stage Fracture | 4356.50 | 4356.60 | 0 |
2014-03-17 | Multi-Stage Fracture | 4298.60 | 4298.70 | 0 |
2014-03-17 | Multi-Stage Fracture | 4253.20 | 4253.30 | 0 |
2014-03-17 | Multi-Stage Fracture | 4207.80 | 4207.90 | 0 |
2014-03-18 | Multi-Stage Fracture | 4162.30 | 4162.40 | 0 |
2014-03-18 | Multi-Stage Fracture | 4117.00 | 4117.10 | 0 |
2014-06-12 | Bridge Plug, No Cement | 4000.80 | 4001.20 | 0 |
2014-06-13 | Packing Device Capped w/Cement | 3845.00 | 3957.60 | 0 |
2014-08-04 | Perforation | 3539.00 | 3542.00 | 20 |
2014-03-15 | Multi-Stage Fracture | 4765.10 | 4765.20 | 0 |
2014-08-08 | Fracture | 3539.00 | 3542.00 | 0 |
2014-08-09 | Perforation | 3462.00 | 3464.00 | 20 |
2014-08-09 | Fracture | 3462.00 | 3464.00 | 0 |
2014-08-09 | Perforation | 3305.00 | 3306.00 | 20 |
2014-08-09 | Fracture | 3305.00 | 3306.00 | 0 |
2014-08-09 | Perforation | 2837.50 | 2838.50 | 20 |
2014-08-09 | Fracture | 2837.50 | 2838.50 | 0 |
2014-08-10 | Perforation | 2257.00 | 2258.00 | 8 |
2014-08-10 | Perforation | 2248.50 | 2249.50 | 8 |
2014-08-10 | Fracture | 2248.50 | 2258.00 | 0 |
2014-03-15 | Multi-Stage Fracture | 4719.90 | 4720.00 | 0 |
2014-03-15 | Multi-Stage Fracture | 4674.50 | 4674.60 | 0 |
2014-03-15 | Multi-Stage Fracture | 4629.20 | 4629.30 | 0 |
2014-03-16 | Multi-Stage Fracture | 4583.80 | 4583.90 | 0 |
2014-03-16 | Multi-Stage Fracture | 4538.20 | 4538.30 | 0 |
2014-03-16 | Multi-Stage Fracture | 4492.80 | 4492.90 | 0 |
2014-03-16 | Multi-Stage Fracture | 4447.40 | 4447.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-08 | 2014-08-10 | 3,993 | 0 | N/A |
2 | 2014-03-15 | 2014-08-10 | 3,993 | 9,668 | N/A |
3 | 2014-03-15 | 2014-03-18 | 3,993 | 0 | N/A |
4 | 2014-08-08 | 2014-08-09 | 3,993 | 0 | N/A |
5 | 2014-08-09 | 2014-08-10 | 3,993 | 0 | N/A |
6 | 2014-08-10 | 2014-08-10 | 3,993 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | hydrochloric acid | 7647-01-0 | 100 | 0.6432 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 8.5795 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 8.5795 | N/A | ||||
AI-7NR | Trican | Corrosion Inhibitor | modified propargyl alcohol | Trade Secret | 100 | 0.0031 | N/A | |
propargyl alcohol | 107-19-7 | 100 | 0.0031 | N/A | ||||
DF-1 | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0 | N/A | |
ASA-60 | Trican | Surfactant | alkylbenzenesulfonic acid | 68584-22-5 | 100 | 0.013 | N/A | |
dipropylene glycol | 25265-71-8 | 100 | 0.013 | N/A | ||||
sodium hexyldiphenyl ether sulfonate | 147732-60-3 | 100 | 0.013 | N/A | ||||
MS-6 | Trican | Surfactant | non-hazardous ingredients | Not Available | 100 | 0.0604 | N/A | |
S-4W | Trican | Surfactant | diethanolamine | 111-42-2 | 100 | 0.0058 | N/A | |
fatty acid alkanolamide | 68603-42-9 | 100 | 0.0058 | N/A | ||||
fatty acid amide | Trade Secret | 100 | 0.0058 | N/A | ||||
glycerin | 56-81-5 | 100 | 0.0058 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0058 | N/A | ||||
octyl decyl acid phosphate | 68186-45-8 | 100 | 0.0058 | N/A | ||||
2 | water | Not Available | 100 | 73.873 | N/A | |||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.9124 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0162 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0162 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0162 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0162 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0162 | N/A | ||||
CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.2059 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.2059 | N/A | ||||
S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.1009 | N/A | |
isopropanol | 67-63-0 | 100 | 0.1009 | N/A | ||||
methanol | 67-56-1 | 100 | 0.1009 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.1009 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.1009 | N/A | ||||
3 | PowerProp 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 7.0661 | N/A | |
phenolic resin | 9003-35-4 | 100 | 7.0661 | N/A | ||||
silica crystalline | 14808-60-7 | 100 | 7.0661 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 2.8898 | N/A | ||
FR-9 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.1436 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1436 | N/A | ||||
4 | Breaker SR | Trican | Breaker | potassium persulfate | 7727-21-1 | 100 | 0.0093 | N/A |
silica crystalline | 14808-60-7 | 100 | 0.0093 | N/A | ||||
DRA-90 | Trican | Buffer | non-hazardous ingredients | Not Available | 100 | 0.1894 | N/A | |
CC-55 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.2838 | N/A | |
formic acid | 64-18-6 | 100 | 0.2838 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.2838 | N/A | ||||
WXB-77 | Trican | Crosslinker | borate salts | 1319-33-1 | 100 | 0.3227 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.3227 | N/A | ||||
WG-111L | Trican | Gelling Agent | distillates (petroleum). hydrotreated middle | 64742-46-7 | 100 | 0.7006 | N/A | |
polysaccharide blend | Not Available | 100 | 0.7006 | N/A | ||||
IC-2 | Trican | Iron Control | sodium erythorbate | 6381-77-7 | 100 | 0.003 | N/A | |
5 | FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.1222 | N/A |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.1222 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1222 | N/A | ||||
IC-3 | Trican | Iron Control | sodium nitrilo-triacetate. monohydrate | 18662-53-8 | 100 | 0.0032 | N/A | |
6 | Methanol | Trican | Solvent | methanol | 67-56-1 | 100 | 0.3895 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-04 | 2014-08-04 | Surface Water - Lake | 590 |
2014-08-04 | 2014-08-08 | Recycled Fracturing Water (treated at well site) | 1208 |
2014-03-12 | 2014-06-17 | Surface Water - River | 4210 |
2014-03-10 | 2014-03-12 | Recycled Fracturing Water (treated at well site) | 2314 |
2014-03-16 | 2014-03-17 | Recycled Fracturing Water (treated at well site) | 1278 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-13 | Lost Circulation | 3335.00 | 3346.00 |
2014-06-18 | No Incident Encountered | 0.00 | 0.00 |
2014-08-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]