X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616061513000

Well Details

Well ID: 0616061513000
Loading map...
Location: 00/13-15-061-06W6/0
Location Alias: 00/13-15-61-06 W6M
Location Alias 2: 00/13-15-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 13-15-61-6
Operator Name: Jupiter Resources Inc.
License Number: 0479018
License Date: 2016-02-05
License Status: Amended
Spud Date: 2017-07-12
Final Drill Date: 2017-11-08
Well Total Depth: 5765.00 m
Surface Hole Latitude: 54.269835
Surface Hole Longitude: -118.786983

For data sources see[1][2]

Well History

Date Event
2016-02-05 Obtained License
2017-07-13 Lost Circulation Occurred
2017-07-15 Surface Casing Operation Performed
2017-07-18 Direction Drilling Operation Performed - Deviate
2017-07-24 Intermediate Casing Operation Performed
2017-10-21 Direction Drilling Operation Performed - Horizontal
2017-11-08 Finished Drilling
2017-11-08 Well Log Performed
2017-11-08 Well Mode changed to Drilled and Cased
2017-11-11 Liner Casing Operation Performed
2017-11-13 Rig Released
2017-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-10 Well Fluid changed to Gas
2018-02-10 Well Mode changed to Testing
2018-02-27 Well Began Production
2018-02-27 Well Fluid changed to Gas
2018-02-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-12 Akita Drilling Ltd. 22 N/A Set Surface
2017-10-15 Akita Drilling Ltd. 22 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-18 865.60 Deviate (5 - 79 degrees)
2017-10-21 3117.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-06 Multi-Stage Fracture 5723.20 5723.30 0
2017-12-07 Multi-Stage Fracture 4932.20 4932.30 0
2017-12-07 Multi-Stage Fracture 4848.70 4848.80 0
2017-12-07 Multi-Stage Fracture 4763.00 4763.10 0
2017-12-07 Multi-Stage Fracture 4666.90 4667.00 0
2017-12-07 Multi-Stage Fracture 4581.90 4582.00 0
2017-12-07 Multi-Stage Fracture 4495.70 4495.80 0
2017-12-07 Multi-Stage Fracture 4409.50 4409.60 0
2017-12-07 Multi-Stage Fracture 4308.20 4308.30 0
2017-12-07 Multi-Stage Fracture 4207.10 4207.20 0
2017-12-07 Multi-Stage Fracture 4134.70 4134.80 0
2017-12-06 Multi-Stage Fracture 5632.90 5633.00 0
2017-12-07 Multi-Stage Fracture 4054.10 4054.20 0
2017-12-07 Multi-Stage Fracture 3953.90 3954.00 0
2017-12-08 Multi-Stage Fracture 3868.00 3868.10 0
2017-12-08 Multi-Stage Fracture 3782.40 3782.50 0
2017-12-08 Multi-Stage Fracture 3696.80 3696.90 0
2017-12-08 Multi-Stage Fracture 3610.00 3610.10 0
2017-12-08 Multi-Stage Fracture 3523.30 3523.40 0
2017-12-08 Multi-Stage Fracture 3436.10 3436.20 0
2017-12-08 Multi-Stage Fracture 3349.40 3349.50 0
2017-12-08 Multi-Stage Fracture 3262.80 3262.90 0
2017-12-06 Multi-Stage Fracture 5547.80 5547.90 0
2017-12-06 Multi-Stage Fracture 5468.30 5468.40 0
2017-12-06 Multi-Stage Fracture 5373.50 5373.60 0
2017-12-06 Multi-Stage Fracture 5291.20 5291.30 0
2017-12-06 Multi-Stage Fracture 5203.90 5204.00 0
2017-12-06 Multi-Stage Fracture 5117.60 5117.70 0
2017-12-07 Multi-Stage Fracture 5016.50 5016.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-06 2017-12-08 3,011 18,010 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.1924 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.3727 N/A
30/50 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.4054 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.9941 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0115 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0115 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0749 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0647 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-06 2017-12-08 Central Water Distribution Facility 16053
2017-12-05 2017-12-05 Central Water Distribution Facility 1341

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6842 0.0 0.0 0.0
2019 8244 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-13 Lost Circulation 118.50 242.00
2017-12-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References